• Title/Summary/Keyword: 건축계획 분야 연구 네트워크

Search Result 4, Processing Time 0.021 seconds

3D GIS Network Modeling of Indoor Building Space Using CAD Plans (CAD 도면을 이용한 건축물 내부 공간의 3차원 GIS 네트워크 모델링)

  • Kang Jung A;Yom Jee-Hong;Lee Dong-Cheon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.23 no.4
    • /
    • pp.375-384
    • /
    • 2005
  • Three dimensional urban models are being increasingly applied for various purposes such as city planning, telecommunication cell planning, traffic analysis, environmental monitoring and disaster management. In recent years, technologies from CAD and GIS are being merged to find optimal solutions in three dimensional modeling of urban buildings. These solutions include modeling of the interior building space as well as its exterior shape visualization. Research and development effort in this area has been performed by scientists and engineers from Computer Graphics, CAD and GIS. Computer Graphics and CAD focussed on precise and efficient visualization, where as GIS emphasized on topology and spatial analysis. Complementary research effort is required for an effective model to serve both visualization and spatial analysis purposes. This study presents an efficient way of using the CAD plans included in the building register documents to reconstruct the internal space of buildings. Topological information was built in the geospatial database and merged with the geometric information of CAD plans. as well as other attributal data from the building register. The GIS network modeling method introduced in this study is expected to enable an effective 3 dimensional spatial analysis of building interior which is developing with increasing complexity and size.

A study on the realtime renewal and update of digital map using general survey (일반측량 성과도를 활용한수치지도의 실시간 수정갱신 체계화 연구)

  • Lee Sang-Gil;Kwon Jay-Hyoun;Yang Hyo-Jin;Cho Seong-Kil
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2006.05a
    • /
    • pp.146-151
    • /
    • 2006
  • 현재 국가지리정보유통망을 통해 유통되고 있는 수치지도(Digital map)는 대부분 항공 측량사진(Air survey Photographs)이나 위성영상(Satellite images)을 통해 취득된 토지 피복의 형상을 기반으로 제작된 지도들이다. 정사사진으로부터 취득된 지형정보를 기호화, 단순화한 수치지도는 실제 사물의 형태와 많은 차이가 있어 지형과 시설물의 변이를 사실대로 반영하지 못한다. 특히 최근 들어 지하시설물이나 건축기술의 발달로 층별 구조가 다양해진 건축물의 형태 등은 정사사진으로는 식별이 불가능하고 건물의 경우 지붕의 형태로 묘사되는 등 표현에 한계가 있다. 도심지역을 대상으로 제작된 1/1,000수치지형도나 일부 지자체나 공공기관 등에서 제작된 $1/500{\sim}1/2,500$ 수치지형도는 상세한 지형정보를 포함하고 있는 높은 정밀도의 수치지도이지만, 도시지역의 변이가 빠르게 일어나고 있기 때문에 자료 신뢰성과 최신성을 유지하는데 한계가 있다. 따라서 본 연구는 현지조사나 측량에 의존하고 있는 정사사진으로부터 취득이 불가능한 지형자료의 취득이나 수년단위인 갱신주기의 한계를 극복하고 실시간으로 수치지도를 수정갱신 할 수 있는 대안으로 일반측량성과도의 활용방안을 제시하고자 한다. 일반측량업에서 생산되는 일반측량성과도는 임시 도근점에 의해 측량을 실시하고 지적경계점과 현황기지점을 도해법에 의해 지적도와 중첩시켜 제작한 측량도로서, 일반측량 성과도에 절대좌표체계를 부여하고 수치지도와 매칭 기법을 제시함으로서 경제적이고 신속한 실시간 수치지도 수정갱신체계를 확립할 수 있고, 자료의 공유함으로써 중복측량을 방지할 수 있다.보 등)를 활용, 구축된다. 교통분석용 네트워크는 구축시점에 따라 현재 및 장래 네트워크로 구분되며 장래 네트워크는 기준년도부터 2031년까지 5년 단위로 계획된 장래도로를 반영하여 구축된다. 교통주제도 및 교통분석용 네트워크는 국가교통DB구축사업을 통해 구축된 자료로서 교통체계효율화법 제9조의4에 따라 공공기관이 교통정책 및 계획수립 등에 활용할 수 있도록 제공하고 있다. 건설교통부의 승인절차를 거쳐 제공하며 활용 후에는 갱신자료 및 활용결과를 통보하는 과정을 거치도록 되어있다. 교통주제도는 국가의 교통정책결정과 관련분야의 기초자료로서 다양하게 활용되고 있으며, 특히 ITS 노드/링크 기본지도로 활용되는 등 교통 분야의 중요한 지리정보로서 구축되고 있다..20{\pm}0.37L$, 72시간에 $1.33{\pm}0.33L$로 유의한 차이를 보였으므로(F=6.153, P=0.004), 술 후 폐환기능 회복에 효과가 있다. 4) 실험군과 대조군의 수술 후 노력성 폐활량은 수술 후 72시간에서 실험군이 $1.90{\pm}0.61L$, 대조군이 $1.51{\pm}0.38L$로 유의한 차이를 보였다(t=2.620, P=0.013). 5) 실험군과 대조군의 수술 후 일초 노력성 호기량은 수술 후 24시간에서 $1.33{\pm}0.56L,\;1.00{\ge}0.28L$로 유의한 차이를 보였고(t=2.530, P=0.017), 술 후 72시간에서 $1.72{\pm}0.65L,\;1.33{\pm}0.3L$로 유의한 차이를 보였다(t=2.540, P=0.016). 6) 대상자의

  • PDF

Comparison of The Importance of Evaluation Items for Landscape Performance and Sustainability Using Analytic Network Process (ANP) (ANP기법을 이용한 조경성능 및 친환경 평가항목 중요도 비교)

  • Ryu, Myeung-Ji;Lee, Hyung-Sook
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.47 no.6
    • /
    • pp.45-52
    • /
    • 2019
  • As international criteria and standards are required in the fields of design and construction, landscape performance must also be considered not only for the value of the landscape but also for providing quality assurance and sustainability. Given the lack of research on landscape performance, the present research was purposed to analyze the importance of potential assessment categories and items using an analytical network process. A list of assessment items, which is composed of 20 items and 6 categories, was derived through a literature review and a preliminary survey of 11 landscape professionals. An ANP model was established and a survey was conducted among 30 landscape practitioners to determine the weight of priorities considering the criteria. The results of ANP showed that the categories of site selection, preservation and health, and convenience had high priorities while materials had the lowest importance score. For the assessment items, a monitoring plan was the highest importance, followed by cultural/ historic preservation, management cost reduction, and natural ground areas. Despite the difficulties in quantifying landscape achievements, most respondents agreed that there needs to be an evaluation system for landscape performance in order to assure the quality and sustainability of landscape development. More research and discussion are needed to develop an assessment system for landscape performance that is applicable to Korean context.

TACT Scheduling & Monitoring of Apartment Finish Works based on the BDM Technique (BDM기법을 적용한 공동주택 마감공사 TACT공정계획 수립 및 운영)

  • Kim, Seon-Gyoo;Yoo, Jae-Woo;Kim, Dong-Sub;Park, Jong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.3-11
    • /
    • 2014
  • As the recent construction projects have been carried out as a mixed-use complex project that includes architecture, civil, mechanical, electrical, and landscape, as well as become bigger and high-rise with the increased repetitive works, the TACT technique has received more attention as an effective method for achieving a target completion date by securing the continuous works. Although the TACT technique can maintain a steady flow without the interruption of works in order to utilize the resources of the repetitive works, it can not be considered as the systematic scheduling technique because the schedule computations are not possible as well as a critical path can not be recognized. This paper proposes the applicabilities of scheduling and monitoring the TACT schedule by the BDM technique as comparing and analyzing the methodologies for apartment finish works by the Excel, the Primavera(P6) based on the PDM technique, and the Beeliner based on the BDM technique that is a new networking technique, respectively.