• Title/Summary/Keyword: 건설 안전

Search Result 4,420, Processing Time 0.026 seconds

Development of the Purlin Hanging System Form for the Girder Bridge Slab and Economic Analysis (거더교 상판 콘크리트 타설용 거푸집 개발 및 경제성 분석)

  • Lim, Jeeyoung;Kim, Sunkuk;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.3
    • /
    • pp.271-278
    • /
    • 2016
  • In the case of South Korea, steel girder bridge (steel box or H-steel) and PSC (Pre-Stressed Concrete) girder bridge are the representative upper structures of railroad and road bridges. These structures account for 75% of the total bridge constructions and 80% of the total construction cost. Since the form work for concreting bridge slab is difficult, various construction methods developed and applied. However, several problems in those methods did not solve partially, including cost increase by material loss and rise of labor costs, quality deterioration by unskilled workers, increased construction time by complicated method, reduced productivity, safety accident by high place work, difficult transportation by big member, and rise of maintenance cost by material characteristic. Alternative method is needed to solve problems of as-is methods. Therefore, the purpose of this study is development of the purlin hanging system form for the girder bridge slab and its economic analysis. Through the findings of this study, it was verified that the purlin hanging system form is possible 60% reduction in cost and 80% reduction in time as comparison with conventional method.

Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works (공동주택 마감공사 공사주체별 작업지연 요인 분석)

  • Lee, Seung-Hoon;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Junn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.73-81
    • /
    • 2011
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

Experimental Study on Effect of Slope and Length of Apron on Discharge through Gate Structure (물받이 길이 및 접근경사에 따른 조력발전 배수구조물 통수능 검토 실험 연구)

  • Yoon, Kwang-Seok;Yeo, Kyu-Dong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1026-1030
    • /
    • 2005
  • 조력발전 건설사업에서 우선적으로 고려되어야 할 사항은 조수간만에 의해 외해부와 조지부 사이를 이동하는 해수를 적절히 소통시키는 것이다. 예를 들어, 단조지 단류식 발전으로 창조시에 발전을 행할 경우, 발전을 행하면서 높아진 조지내의 수위를 다음 발전을 위해서 낮아진 외해수위를 이용하여 효과적으로 배수시키지 못하면 그 시설은 발전효율이 낮아지게 된다. 즉, 수문구조물의 목적은 주어진 조건 하에서 계획된 유량을 충분히 그리고 안전하게 배제시키는 것이다. 본 연구에서는 수문구조물에 대한 물받이의 길이와 경사의 변화에 의한 외해 조위와 시화호 수위차 조건에 따른 유량계수를 구해 배수능력을 검토하고자 하였다. 이를 위해 시화호를 실험대상으로 하여 수리모형을 1:25의 축척비로 제작하였다. 시화방조제를 기준으로 외해부의 조위와 조지부의 수위차를 8가지의 실험조건으로 한 연구를 수행하였다. 유량계수를 산정하기 위하여 8개 실험조건을 계획에서 제시된 수위-조위 조건에서 수위차 및 통수유량을 분배하여 결정하였고, 유량계수 산정식에 따라 상류 흐름 안정지점에서 유속-면적법에 의해서 유량을 측정하였다. 유속은 8개 지점에 대해서 측정하였고, 각 측정지점에서의 측선은 $3\~5$개이며, 측점은 $3\~4$점법으로 수행하였다. 시화호와 외해의 수위차가 1.011m일 때의 수문을 통과하는 유량을 비교한 결과 실험 II와 III의 통과유량은 각각 $1,571m^3/s$$1,515m^3/s$ 의서 실험 I 의 $587m^3/s$에 비해 통수능이 많이 개선되었음을 알 수 있다. 그림 1은 수위차별 유량곡선을 나타내는 것으로, 실험 II에서의 수문의 통수능이 실험 I의 통수능보다 크게 나타남을 알 수 있었다.>일 때가 밸브를 $60\%$$80\%$ 개폐시켰을 때보다 $0.3kg/cm^2,\;0.29kg/cm^2$ 낮게 나타나 밸브를 전체 개방 했을 때 관로내의 수압이 상수설계기준에 적합한 수압을 유지함을 알 수 있다. 상수관로 설계 기준에서는 관로내 수압을 $1.5\~4.0kg/cm^2$으로 나타내고 있는데 $6kg/cm^2$보다 과수압을 나타내는 경우가 $100\%$로 밸브를 개방하였을 때보다 $60\%,\;80\%$ 개방하였을 때가 더 빈번히 발생하고 있으므로 대상지역의 밸브 개폐는 $100\%$ 개방하는 것이 선계기준에 적합한 것으로 나타났다. 밸브 개폐에 따른 수압 변화를 모의한 결과 밸브 개폐도를 적절히 유지하여 필요수량의 확보 및 누수방지대책에 활용할 수 있을 것으로 판단된다.8R(mm)(r^2=0.84)$로 지수적으로 증가하는 경향을 나타내었다. 유거수량은 토성별로 양토를 1.0으로 기준할 때 사양토가 0.86으로 가장 작았고, 식양토 1.09, 식토 1.15로 평가되어 침투수에 비해 토성별 차이가 크게 나타났다. 이는 토성이 세립질일 수록 유거수의 저항이 작기 때문으로 생각된다. 경사에 따라서는 경사도가 증가할수록 증가하였으며 $10\% 경사일 때를 기준으로 $Ro(mm)=Ro_{10}{\times}0.797{\times}e^{-0.021s(\%)}$로 나타났다.천성 승모판 폐쇄 부전등을 초래하는 심각한 선천성 심질환이다. 그러나 진단 즉시 직접 좌관상동맥-대동맥 이식술로 수술적 교정을 해줌으로써 좋은 성적을 기대할 수 있음을 보여주었다.특히 교사들이 중요하게 인식하는 해방적

  • PDF

The Site Installation Test of Single-Phase MJ81 Switch Point Machine Localization (단상 MJ81 전기선로전환기 국산품의 현장설치시험)

  • Baek, Jong-Hyen;Kim, Yong-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.12
    • /
    • pp.3632-3637
    • /
    • 2009
  • In this paper, we describe the performance results of the field installation test which is required to practicalize the single-phase MJ81 Switch Point Machine. This product has passed the certified test through performance improvement of driving parts in order to use 3 phase MJ81 Switch Point Machine, which is localized by taking over technology from Alstom and Cogifer when constructing Seoul-Busan rapid-transit railway, without change of the electrical equipment at track-side in domestic existing lines which single-phase 220V is used. KRRI and Samsung SDS have localized the single-phase MJ81 Switch Point Machine to improve the speed and safety of the conventional lines through the existing railway technology development project. For practicalization of this, we should, however, verify the performance through not only field installation test in real lines but also interface test with the interlocking. In this paper we verify the practicality of the domestic single-phase MJ81 Switch Point Machine through analysis on the performance result of the field installation test as well as the research contents for this test. Thereby, in Feb 2009 we have received an order from the Korea Rail Network Authority and are currently installing the single-phase MJ81 Switch Point Machine.

A Study on Establishment of Buffer Zone of Radioactive Waste Repository (방사성패기물 처분시설에서의 완충공간 설정에 대한 고찰)

  • Yoon, Jeong-Hyoun;Park, Joo-Wan;Ju, Min-Su;Kim, Chang-Lak;Park, Jin-Baek
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.6 no.1
    • /
    • pp.45-54
    • /
    • 2008
  • A new proposed repository has a final capacity of 800,000 drums radioactive waste. Most of foreign repositories have a general practice of segregating control zones which mainly contributes to classification of degree of control, whether it is called buffer zone or not. Domestic regulatory requirements of establishment of buffer zone in a repository are not much different from those of nuclear power plants for operation period, in which satisfactory design objective or performance objective is the most important factor in determination of the buffer zone. The meaning of buffer zone after closure is a minimum requested area which can prevent inadvertant intruders from leading to non-allowable exposure during institutional control period. Safety assessment with drinking well scenario giving rise to the highest probability of exposure among the intruder's actions can verify fulfillment of the buffer zone which is determined by operational safety of the repository. At present. for the repository to be constructed in a few years, the same procedure and concept as described in this paper are applied that can satisfy regulatory requirements and radiological safety as well. However, the capacity of the repository will be stepwise extended upto 800,000 drums, consequently its layout will be varied too. Timely considerations will be necessary for current boundary of the buffer zone which has been established on the basis of 100,000 drums disposal.

  • PDF

Study on Hydrogen Embrittlement for API 5L X65 Steel Using Small Punch Test I : Base Metal (소형펀치 시험을 이용한 API 5L X65 강의 수소취화에 관한 연구 I : 모재부)

  • Jang, Sang-Yup;Yoon, Kee-Bong
    • Journal of Energy Engineering
    • /
    • v.18 no.1
    • /
    • pp.49-55
    • /
    • 2009
  • Occurrence of hydrogen embrittlement could be one of the main obstacles for using structural equipment under hydrogen environment. It is required to develop assessment methods of hydrogen embrittlement for the metals used in production, storage, transmission and application utilities of hydrogen. The most probable method of hydrogen mass transmission is using existing natural gas pipeline. Base or weld part of the pipeline can be damaged by mixed gas of hydrogen in the pipeline. In this study small punch (SP) testing was employed to evaluate the hydrogen embrittlement behavior for a line pipe steel (API X65) with electrochemically hydrogen charged specimens. Results showed that the SP test can be a good candidate test method for hydrogen damage evaluation method. Strength of steel is known to be decreased with the level of hydrogen charging. However, for API X65 steel base metal need in this study, the effect of hydrogen to strength was not significant. It can be negligible regardless of the hydrogen contents in the steel. With this test different strength levels with various hydrogen charging conditions were observed. It can also be anticipated that more sensitive evaluation of material behavior be obtainable by the SP test method.

Development for prediction system of TBM tunnel face ahead using probe drilling equipment and drilled hole imaging equipment (선진시추장비와 시추공벽 영상화 장비를 이용한 TBM 전방 지반평가시스템 개발)

  • Kim, Ki-Seog;Kim, Jong-Hoon;Jeong, Lae-Chul;Lee, In-Mo;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.393-401
    • /
    • 2015
  • In the construction of a TBM tunnel, it is very important to acquire accurate information of the excavated rock mass for an efficient and safe work. In this study, we developed the prediction system of TBM tunnel face ahead using probe drilling equipment and drilled hole imaging equipment to predict rock mass conditions of the tunnel face ahead. The prediction system consists of the probe drilling equipment, drilled hole imaging equipment and analysis software. The probe drilling equipment has been developed to be applicable to both non-coring and coring. Also the probe drilling equipment can obtain the drilling parameters such as feed pressure, torque pressure, rotation speed, drilling speed and so on. The drilling index is converted to the drilling index RMR through the correlation between a drilling index and core RMR. The developed system verification was carried out through a slope and tunnel field application. From the field application result, the non-coring is four times faster than a coring and the drilling index RMR and core RMR are similar in the distribution range. This system is expected to predict the rock mass conditions of the TBM tunnel face ahead very quickly and efficiently.

Utilization of induced polarization for predicting ground condition ahead of tunnel face in subsea tunnelling: laboratory test (유도분극을 활용한 해저터널 굴착면 전방 지반상태 예측: 실내실험)

  • Park, Jinho;Lee, Kang-Hyun;Lee, Seong-Won;Ryu, Young-Moo;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.383-392
    • /
    • 2015
  • In subsea tunnelling, prediction of the fractured zone (or water bearing zone) ahead of tunnel face saturated by seawater with high water pressure has been a key factor for safe construction. This study verified the feasibility of utilizing induced polarization (IP) survey at tunnel face for predicting the ground condition ahead of the subsea tunnel face. A pore model was proposed to compute chargeability in granular material, and the relationship correlating chargeability with the variables affecting the chargeability was derived from the model. Parametric study has been performed on the variables to figure out the most influential factors affecting the chargeability. The results of the parametric study show that the size of narrow pores ($r_1$) and the salinity of pore water are the most influential factors on chargeability. Laboratory tests were conducted on various types of ground condition by changing the salinity of pore water, the thickness of the fracture zone and the existence of gouge (weathered granite) within the joints of the fractured zone to figure out the effect of the ground characteristics on the IP phenomenon. Test results show that the chargeability of the fractured zone saturated by seawater increases if the joints in the fractured zone are filled with gouge since the infilled gouge will decrease the size of narrow pores ($r_1$).

Review on Spent Nuclear Fuel Performance and Degradation Mechanisms under Long-term Dry Storage (사용후핵연료의 장기 건식 건전성 성능과 주요 열화 기구에 관한 고찰)

  • Kim, Juseong;Kook, Donghak;Sim, Jeehyung;Kim, Yongsoo
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.11 no.4
    • /
    • pp.333-349
    • /
    • 2013
  • As the capacity of spent nuclear fuel storage pool at reactor sites becomes saturated in ten years, long term dry storage strategy has been recently discussed as an alternative option in Korea. In this study, we reviewed safety-criteria-related research results on spent nuclear fuel performance and integrity under long-term dry storage and proposed the direction and the scope of future domestic research and development. Creep and hydride effect in relation to the embrittlement are known to be the major degradation mechanisms of the spent fuels during the long term dry storage. However, recent research results showed that hydride reorientation and hydride embrittlement are one of the most critical factors to the spent fuel integrity. Accordingly safety criteria of US and Japan for the storage system are basically founded on those mechanisms. However, in Korea, not only in-pile but out-of-pile experimental data have not been generated to understand fuel cladding degradation and to determine the criteria to ensure the safety. In addition, the transient behavior of the spent fuel during transportation also needs to be thoroughly examined. Therefore, various experimental research and development will be required to establish our own safety criteria for future long-term dry storage of domestic spent fuels.

The Feasibility of Natural Ventilation in Radioactive Waste Repository Using Rock Cavern Disposal Method (동굴처분 방식을 사용하는 방사성 폐기물 처분장의 자연 환기 타당성 평가)

  • Kim Jin;Kwon Sang Ki
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.3 no.3
    • /
    • pp.183-192
    • /
    • 2005
  • Natural ventilation in radioactive waste repositories is considered to be less efficient than mechanically forced ventilation for the repository working environment and hygiene & safety of the public at large, for example, controlling the exposure of airborne radioactive particulate matter. It is, however, considered to play an important role and may be fairly efficient for maintaining environmental conditions of the repository over the duration of its lifetime, for example, moisture content and radon (Rn) gas elimination in repository. This paper describes the feasibility of using natural ventilation which can be generated in the repository itself, depending on the conditions of the natural environment during the periods of repository construction and operation. Evidences from natural cave analogues, actual measurements of natural ventilation pressures in mountain traffic tunnels with vertical shafts, and calculations of airflow rates with given natural ventilation pressures indicate possible benefits from passive ventilation for the prospective Korean radioactive waste repository. Natural ventilation may provide engineers with a cost-efficient method for heat and moisture transfer, and radon (Rn) gas elimination in a radioactive waste repository. The overall thermal performance of the repository may be improved. The dry-out period may be extended, and the seepage flux likely would be decreased.

  • PDF