Abstract
In this paper, we describe the performance results of the field installation test which is required to practicalize the single-phase MJ81 Switch Point Machine. This product has passed the certified test through performance improvement of driving parts in order to use 3 phase MJ81 Switch Point Machine, which is localized by taking over technology from Alstom and Cogifer when constructing Seoul-Busan rapid-transit railway, without change of the electrical equipment at track-side in domestic existing lines which single-phase 220V is used. KRRI and Samsung SDS have localized the single-phase MJ81 Switch Point Machine to improve the speed and safety of the conventional lines through the existing railway technology development project. For practicalization of this, we should, however, verify the performance through not only field installation test in real lines but also interface test with the interlocking. In this paper we verify the practicality of the domestic single-phase MJ81 Switch Point Machine through analysis on the performance result of the field installation test as well as the research contents for this test. Thereby, in Feb 2009 we have received an order from the Korea Rail Network Authority and are currently installing the single-phase MJ81 Switch Point Machine.
본 논문에서는 단상 MJ81 전기선로전환기의 실용화를 위해 요구되는 현장설치시험을 수행한 결과를 기술하고 있다. 이러한 단상 MJ81 전기선로전환기는 경부고속철도 건설시에 프랑스 알스톰 및 코지프로부터 기술이전 받아 국산화한 3상 MJ81 전기선로전환기를 단상 220V를 사용하고 있는 국내 기존선에서도 선로 연변 전원설비의 변경 없이도 사용할 수 있도록 구동부의 성능 개선을 통해 공인인증시험을 통과한 제품이다. 한국철도기술연구원 및 삼성 SDS에서는 기존철도기술개발사업을 통해 기존선의 속도 및 안전성 향상을 위해 단상 MJ81 전기선로전환기를 국산화 하였으나 이의 실용화를 위해서는 연동장치와의 인터페이스 시험 뿐 아니라 실제 선로에서의 현장설치시험을 통해 성능을 입증하여야 한다. 본 논문에서는 이러한 시험을 진행한 과정과 함께 현장설치시험의 결과 분석을 통해 국산품인 단상 MJ81 전기선로전환기의 실용성을 입증하였으며, 입증된 결과를 바탕으로 2009년 2월 한국철도시설공단의 물량을 수주하여 현재 설치 중이다.