• Title/Summary/Keyword: 건설 공사

Search Result 4,330, Processing Time 0.027 seconds

1996년도 건설업 경기전망

  • 대한설비공사협회
    • 월간 기계설비
    • /
    • s.66
    • /
    • pp.30-33
    • /
    • 1996
  • 1996년도 건설공사 수주규모는 작년대비 $12.7{\%}$ 늘어난 67조 3,890억원으로 예측되었으나 증가세는 다소 둔화될 것으로 보이며 물가상승분을 제외한 실질성장률은 경제성장률보다 낮을것으로 추정된다. 건설공사 기성액은 작년보다 $19.6{\%}$ 늘어난 69조 8,100억원으로 추정되었으나 이월된 공사량의 변수가 매우 불안하여 동 금액보다 확대될 가능성이 크다 하겠다.

  • PDF

Development of Construction Cost Model through the Analysis of Critical Work Items (코스트 중요항목 분석을 통한 공사비 예측모델 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.212-219
    • /
    • 2003
  • In construction project planning and control, a cost model performs a critical role such as cost determination on a contract stage and cost tracing. The model can maximize owner's profit and value within the project budget and optimize cost management works on overall construction implementation stages. A BoQ(Bill of Quantities) generally adopted in a unit price contract has been applied as an important tool for cost control and forecast. However a previous cost model based on the BoQ has shown limitations in that it requires too detailed information and heavy manpower on cost management and difficulty in keeping relationship with construction planning, scheduling and progress management. The each cost items and unit prices which constitute of construction works are individually very important management factors but the relative weight for each items and prices have a difference on the contents and conditions of each conditions of each construction works. In consideration of this structural mechanism of cost determination, this research is aimed at examining the critical factors affecting the construction cost determination and propose and verify a new cost forecasting model which is more simple and efficient and also keeps the accuracy of cost management.

Earned Value based Construction Project Control System (EV기반 공사관리시스템 기능의 비교분석 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.168-174
    • /
    • 2004
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

고속도로공사 재해유형에 따른 안전확보기법 연구(고속도로 공사를 중심으로)

  • 양학수;손기상
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2002.11a
    • /
    • pp.197-203
    • /
    • 2002
  • 고속도로란 지역과 지역을 연결한 간선도로로 장거리 통행을 주 교통으로 하여 지정된 진출입외에는 완전히 출입을 제한한 자동차 전용도로이다. 영문으로는 freeway, Expressway, Motorway등으로 표기한다. 고속도로 건설은 정부투자 기관인 한국도로공사(Korea Highway Corporation)에서 공사를 발주하여 주로 대형건설업체들이 시공하고 있으며, 이에 대한 시공관리는 대개 도로공사 건설사업소 단위로 시행하고 있다. 고속도로 건설공사의 개략적 구성을 보면 토공, 구조물공, 배수공, 터널공, 부대공 등으로 형성되고 있으며, 시공형태는 대형화, 기계화 되어감에 따라 재해의 유형도 변화가 일고 있다.(중략)

  • PDF

A Study on Analysis and Improvement of Furniture Work for Just-in-Time (적시생산방식을 이용한 가구공사 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Ahn Jae-Bong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.71-78
    • /
    • 2004
  • In this study, the concept of Just-In-Time, Lean Construction and Supply Chain Management have been applied to furniture works of high-rise residental building. For the purpose of systematic furniture work planning, it should be established to analyse furniture-work process from design phase through contract, and procurement to construction phase. The analysis of process and data for furniture-work provides the roles of conducting subjects and presents management items at each phase. This proposal will provide the systematic furniture-work managements and reduce construction time and cost, and also raise the quality of furniture works.

A Study on the Development of Risk Check List and Identification of Risk Factors for Survey in Road Construction (측량 분야의 리스크 식별을 위한 리스크 체크리스트 개발 -도로 공사를 중심으로-)

  • Kwak, Jun-Hwan;Park, Hyung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.901-904
    • /
    • 2008
  • The purpose of this study is to identify the risk factors, analyze the risk factors and make a risk check list of survey in road construction. Generally. the risk management is consisted of 3 steps: risk identification, Risk analysis, Risk hedge. This study is focused on the identification of risk and analysis of risk. To identify the risk factors of survey, we used the specifications of road construction, law of survey, and check list of road construction. This study provides the risk check list of survey for road construction. This research was undertaken to analyze risk factors being determine by the FGI(Focus Group Interview) method with survey specialists.

  • PDF

Analysis of the Work and Cost of Supervisor in the Public Construction Corporation (공공발주처의 공사감독 업무영역과 비용 분석)

  • Cho Seong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.146-152
    • /
    • 2003
  • In the construction project, construction supervisor influences greatly the construction managements such as process management, quality management, safety management, and cost management. Therefore, from the first stage of the project, the managing activities of the supervisor are consistently needed. But the assesment of supervisor's work and cost has not been made enough in the public construction project. And there have been doubts as to whether a supervisor can take a consistent managing activity from the early stage of the project. Accordingly, the works between Korean supervisor and foreign supervisor in their public corporations are analyzed and compared in this paper. And the evaluation is made each of the cost for supervisor and the cost for engineer as a substitute of supervisor in construction project. This study is believed to contribute to improving the supervisor's work and reducing the personnel expenses and construction indirect cost.

건설정책 - 공공 건설공사 불공정 하도급계약 체결 제동

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.270
    • /
    • pp.64-67
    • /
    • 2013
  • 정부가 공공 건설공사의 하도급계약 체결 자료를 일반에 공개하는 내용의 제도 개선을 추진한다. 불법 하도급을 통해 비자금을 조성하지 못하도록 하기 위한 것으로 발주기관에 거짓 하도급계약 자료를 제출하면 입찰참가자격이 제한된다. 국민권익위원회는 지난해 11월 28일 이런 내용을 담은 '공공 건설공사 불공정 하도급계약 개선 방안'을 마련해 기획재정부 등 8개 정부부처와 지방자치단체에 권고했다.

  • PDF

A Study on the Improvement Contract System of to Prevent Domestic Public Construction Claims (국내의 공공건설 클레임 예방을 위한 계약제도 개선방안 연구)

  • Jung, Min-Jung;Cho, Young-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.239-242
    • /
    • 2007
  • Many contractors have overlooked the construction contract general conditions and it was a bad construction practice. Today, construction project is very complex and complicated. This requires a networked contract document and results in a complicated contract conflict hardly to be solved. Therefore, to reduce the construction dispute and to enhance construction practice, clarification of definition of Owner, several conditions to be revised, insertion of design supervision were suggested in this paper.

  • PDF