• Title/Summary/Keyword: 건설통합관리

Search Result 642, Processing Time 0.038 seconds

Case Study in Current State of Amount of Order for Turnkey Project (설계 $\cdot$ 시공일괄입찰제도의 수주현황 사례분석)

  • Lee Yang-Kyoo;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.197-202
    • /
    • 2004
  • Turnkey contract system is an effective ordering system for the organizations that technical engineers are insufficient in their construction projects. It is possible to reduce project duration and to improve project Quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system in our country. The results includes various methods for improving the system based on the analysis of bid price nd selection procedure.

  • PDF

A Study of Knowledge Classification Structure Improvement through Adopting BPM (BPM 도입을 통한 지식분류체계 개선에 관한 연구)

  • Hwang, Jin-Won;Choi, Hyung-Won;Choi, Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.720-724
    • /
    • 2008
  • Concentration about value of invisible asset has increased in the condition of rapid business circumstance change. As one of these concentration, many company adopted knowledge management, and construction industry also tried to adopt knowledge management. However, it is difficult for construction company to get expected effects because of knowledge management system in no relation with business process. To solve this problems, this study adopted BPM that has many functions, such as business process design, operation, monitoring, sustainable improvement, to knowledge classification structure.

  • PDF

Quantile Regression-based regional frequency analysis techniques (Quantile-regression-based 지역빈도해석 기법)

  • Kang, Subin;Uranchimeg, Sumiya;Moon, Jangwon;Kwon, Hyun-Han
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.404-404
    • /
    • 2022
  • 효율적인 수자원 관리를 위해 빈도해석을 통한 수문 자료의 통계적 특성을 고려하여 정확한 확률강수량을 산정해야 한다. 지점빈도해석은 지점 자료만을 이용하여 확률강수량을 산정하기 때문에 정확도를 높이기 위해서는 자료 확충이 필요하지만, 지점별로 활용할 수 있는 자료가 제한적이며 지점마다 변동성이 크다. 지역빈도해석은 수문기상학적으로 동질한 주변 지점들의 자료를 모두 포함해서 빈도해석을 수행함으로써 지역에 대한 통합 결과를 제시하고 자료에 대한 신뢰성 확보가 가능하다. 일반적으로 빈도해석은 자료에 적합한 확률분포 기반으로 수행되지만 확률분포 선정과정에 따라 결과는 상이하다. 본 연구에서는 지역빈도해석에서 확률강수량 산정방법으로 Quantile Regression(QR)을 적용하였다. QR 기반의 빈도해석은 확률분포 아니라 자료 자체로 확률강수량을 산정하여 기존의 확률분포 기반의 빈도해석에서 발생했던 불확실성을 개선하였다. 또는, 확률강수량의 시간에 따른 변동성도 고려되어 바정상성 빈도해석도 가능하다. 최종적으로 본 연구에서 소개된 지역빈도해석 결과와 기존의 지역빈도해석 결과 비교 검증하였다.

  • PDF

Integrated Surface-Groundwater Hydrologic Analysis for Evaluating Effectiveness of Groundwater Dam in Ssangcheon Watershed (쌍천 지하댐의 효용성 평가를 위한 지표수-지하수 통합 수문해석)

  • Kim, Nam-Won;Na, Han-Na;Chung, Il-Moon
    • Economic and Environmental Geology
    • /
    • v.44 no.6
    • /
    • pp.525-532
    • /
    • 2011
  • In this study, the usefulness of underground dam as a means for the sustainable development of groundwater, and its performance in the management of groundwater resources were analyzed. The fully integrated SWAT-MODFLOW was applied to the Ssangcheon watershed in Korea to evaluate the effectiveness of groundwater dam construction. After construction, the groundwater level raised in the upstream area of groundwater dam while lowered in the downstream area. Also, it is shown that the exchange rate of river-aquifer interactions increased in the upper area of the dam. Since the storage capacity of the aquifer largely increased in the upper area of the dam, the exploitable groundwater could be greatly increased as much. This study demonstrated that a groundwater dam was a very useful measure to increase the available storativity of groundwater aquifers. It also represented that the combined analysis using SWAT-MODFLOW was helpful for the design and opeation of groundwater dam in the Ssangcheon watershed.

The Study on the System to Estimate the Cost by Using Regression in the Early Stage of the Project (공사 초기단계에서의 회귀분석을 이용한 최종공사비(EAC) 추정 방법)

  • Lee, Youn-Mi;Lee, Man-Hee;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.274-277
    • /
    • 2006
  • The EAC(Estimate at Completion) among existing methods, which estimate cost and time effectively, help managers anticipate changeable several results at the point of $15{\sim}30%$ in the project progress. However, this method may cause such some problems as not to consider the periodically changing circumstances caused by construction risks or uncertainties which can affect the cost and time in the project, and to regard collected and accumulated data only as a single value when predicting the results on the progress. Accordingly, it is very difficult to accept the even small range of variability based on the anticipation of EAC. Consequently, the study focuses on the possibility methodology to anticipate time and cost accurately on the way to utilize EVMS(Earned Value Management System), and also suggest the way to perform the right estimation of EAC as considering various risks and uncertainties in construction projects.

  • PDF

Design Information Management System Core Development Using Industry Foundation Classes (IFC를 이용한 설계정보관리시스템 핵심부 구축)

  • Lee Keun-hyung;Chin Sang-yoon;Kim Jae-jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.98-107
    • /
    • 2000
  • Increased use of computers in AEC (Architecture, Engineering and Construction) has expanded the amount of information gained from CAD (Computer Aided Design), PMIS (Project Management Information System), Structural Analysis Program, and Scheduling Program as well as making it more complex. And the productivity of AEC industry is largely dependent on well management and efficient reuse of this information. Accordingly, such trend incited much research and development on ITC (Information Technology in Construction) and CIC (Computer Integrated Construction) to be conducted. In exemplifying such effort, many researchers studied and researched on IFC (Industry Foundation Classes) since its development by IAI (International Alliance for Interoperability) for the product based information sharing. However, in spite of some valuable outputs, these researches are yet in the preliminary stage and deal mainly with conceptual ideas and trial implementations. Research on unveiling the process of the IFC application development, the core of the Design Information management system, and its applicable plan still need be done. Thus, the purpose of this paper is to determine the technologies needed for Design Information management system using IFC, and to present the key roles and the process of the IFC application development and its applicable plan. This system play a role to integrate the architectural information and the structural information into the product model and to group many each product items with various levels and aspects. To make the process model, we defined two activities, 'Product Modeling', 'Application Development', at the initial level. Then we decomposed the Application Development activity into five activities, 'IFC Schema Compile', 'Class Compile', 'Make Project Database Schema', 'Development of Product Frameworker', 'Make Project Database'. These activities are carried out by C++ Compiler, CAD, ObjectStore, ST-Developer, and ST-ObjectStore. Finally, we proposed the applicable process with six stages, '3D Modeling', 'Creation of Product Information', 'Creation and Update of Database', 'Reformation of Model's Structure with Multiple Hierarchies', 'Integration of Drawings and Specifications', and 'Creation of Quantity Information'. The IFCs, including the other classes which are going to be updated and developed newly on the construction, civil/structure, and facility management, will be used by the experts through the internet distribution technologies including CORBA and DCOM.

  • PDF

An Analysis and Improvement of Progress Payment Regulations in Korea Using System Dynamics - Focusing on Public Construction Industry - (시스템다이내믹스를 이용한 국내 기성금 제도 현황 분석 및 개선방안 제시 - 공공건설분야를 중심으로 -)

  • Park, Moon-Seo;Lee, Jeoung-Hoon;Lee, Hyun-Soo;Hwang, Sung-Joo;Kim, Soo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.148-159
    • /
    • 2012
  • Recently construction companies' capital condition has been aggravated due to low profit, fierce competition and market contraction. For this reason, the companies rely on public construction projects that protect construction fee by regulations. Despite these regulations, problems regarding progress payment are constantly happening. Also, insufficient analysis on interaction between contractors makes policy making difficult. Thus, in this study, interaction between contractors are quantitatively determined according to delay of application and payment based on current public construction regulations on construction stage. A system dynamics model is used, which analyzes the problems based on an interaction between contractors, and solutions for progress payment application and payment delay are suggested according to the research results.

CASH FLOW FORECASTING IN CONSTRUCTION PROJECT (건설공사에서의 현금흐름 예측)

  • Park Hyung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.35-41
    • /
    • 2002
  • This research introduces the development of a project-level cash flow forecasting model in construction stage based on the planned earned value and the cost from a general contractors view on a jobsite. Most previous models have been developed to assist contractors in their pre-tendering or planning stage cash flow forecasts. The critical key to cash flow forecasting at the project level is how to build a cash-out model. The basic concept is to use moving weights of cost categories in a budget over project duration. The cost categories are classified to compile resources with almost the same time lags that are based on contracting payment conditions and credit times given by suppliers or venders. For cash-in, net planned monthly-earned values are simply transferred to the cash-in forecast, to be applied there with billing time and retention money. Validation of the model involves applying data from on-going 4 projects in progress for 12 months. Based on the results of the comparative analyses through the simulation of the proposed model and the existing models, the proposed model is more accurate, flexible and simpler than traditional models to the employee of construction jobsite who is not oriented financial knowledge.

  • PDF

Development of water distribution systems performance evaluation framework using machine learning technique (머신러닝을 이용한 상수도시스템 성능평가 프레임워크 개발)

  • Min Jun Kim;Ryul Kim;Hui Geun Kwon;Young Hwan Choi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.204-204
    • /
    • 2023
  • 2020년 상수도 통계에 따르면 전국 상수도 보급률은 약 99% 정도로 높은 수치를 기록하고 있으나 노후관으로 인한 관로파손 및 수질사고로 인해 효과적인 운영에는 많은 어려움이 존재한다. 이러한 문제를 해결하기 위해 기술진단 및 정밀안전진단 등 체계적인 유지관리 규정이 도입되었으며 적용되고 있으며, 이때 시스템의 정량적인 성능평가를 위해 간접평가와 직접평가로 구성된 점수평가법이 적용되었다. 간접평가는 지중에 매설된 관로를 대상으로 매설연도, 관경, 관로연장 등의 노후도인자를 통해 관의 노후도를 추정하고 간접평가 결과 3등급으로 판명되는 관로의 경우 객관적인 관의 상태를 평가하기 위해 시편채취 및 관로 내시진단 등의 직접평가가 수행된다. 하지만 관로의 직접평가는 간접평가결과 3등급의 모든 관로에 대해 수행하기에는 진단비용 및 시간 등 제약조건에 따라 모든 지점에 대한 직접평가 수행에는 한계가 있다. 따라서, 본 연구에서는 이러한 관로 성능평가 기법의 한계를 개선하기 위해 상수도시스템 통합평가 기술을 개발하였다. 개발한 기술은 머신러닝 기법을 적용하여 간접평가 및 직접평가 결과를 토대로 직접평가가 필요한 지점의 결과를 예측하였다. 이를 바탕으로 상수도시스템 평가성능 향상 및 보강 우선순위 선정 단계에서 의사결정권자의 판단에 도움이 될 것으로 판단된다.

  • PDF

Development and Application for Stable Technology Agricultural Water Management in Recurrent Drought Areas of Geum River Basin (금강권역 상습 가뭄지역의 안정적인 농업용수 공급관리 기술 개발 및 적용)

  • Kim, Da Ye;Hong, Eun Bi;Maeng, Seung Jin;Lee, Gwang Ya;Park, Ji Seong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.74-74
    • /
    • 2021
  • 우리나라의 농업용수 사용량은 152억톤으로 우리나라 전체 물 사용량의 약 42%이며, 농업용수의 관리는 전체 논 면적 865천ha 중 한국농어촌공사에서 487천ha(56%), 지방자치단체에서 221천 ha(26%), 수리 불안전답이 157천ha(18%)이다. 또한 우리나라에 설치된 저수지, 양수장 등과 용수로로 공급되는 농업용수 공급량 중 논에 유입되지 못하고 퇴수되는 물이 약 43%이다. 농업용수 급수 중 용수로의 수위가 낮아 급수관을 통해 논에 유입되지 못하고 배수로로 퇴수되고 있는 실정이다. 농업용수 급수가 원활하기 위해서는 용수로의 수위를 20cm이상 확보하여야 급수관을 통해 논에 급수가 가능하다. 하지만 현장에서는 이러한 물 공급의 문제점을 해결하기 위해 용수로를 비료포대 등으로 막아서 사용함으로써 용수로 시설물의 관리가 되지 않고 토사가 쌓여 급수 애로가 가중되는 상황으로 시설물 관리를 위한 용수로 준설 등 시설 유지관리비가 발생하고 있다. 특히 금강권역(금강, 만경강, 동진강, 삽교천, 충남 서북부)에서 상습적인 가뭄 발생으로 농업용수 사용에 관한 분쟁이 상시적으로 도사리고 있는 실정이다. 이러한 문제를 해결하기 위해 농업용수의 급수 손실을 최소화하며 원활하고 안정적인 용수를 공급하고자 하였으며, 농민을 대상으로 설문지를 작성하여 응답을 분석하고 농민들의 요구사항을 개선하기 위해 법·제도, 거버넌스, 재원 및 기술·시설로 구분하여 제시하였다. 또한 과거 관행에 의한 유말부 용수공급에 탈피해서 원활한 용수공급이 가능하고 유지관리가 쉬운 장치인 부력식 제수문을 선정하고 제시하였다. 따라서 본 연구에서는 금강권역 상습 가뭄지역의 안정적인 농업용수의 공급관리를 위한 기술 개발 및 적용을 실시하고, 농업용수 공급관련 정량화된 손실현황을 분석한 후 수위확보 장치 적용 전·후 모니터링으로 효과 분석을 실시하였다.

  • PDF