Korean Journal of Construction Engineering and Management
/
v.20
no.4
/
pp.46-55
/
2019
The exposed concrete has been widely used in building construction. Therefore, many researches are presented to secure a proper construction quality of exposed concrete. Low quality and management absence, however, still remained in construction fields. Thus, many studies have been conducted to improve the quality, but defects still occur in the exposed concrete finishing work. In this study, the causes of defects were analyzed by process in order to prevent the generation of defects and to enhance the need for integrated management to secure quality. In addition, a case study and AHP analysis have derived the importance of defects occurring in the exposed concrete finishing work. The study concluded that the occurrence of the exposed concrete finishing work needs to be managed throughout the process, not the management limited by one process, according to the causes of the existing defects, and integrated management is required to prevent defects and improve quality of exposed concrete finishing work.
The real-name safety management system is to indicate "safety" after inspection by construction personnel before workers use it for the purpose of preventing safety accidents caused by unsafe conditions in temporary facilities and temporary constructions installed at construction sites. Purpose: By implementing the real-name system for safety management at construction sites, the objective is to respond to the "Severe Accident Punishment Act" and to improve the level of safety management at the same time. Method: In this study, a hierarchical analysis model was produced through previous studies of actual conditions such as types of safety incidents and causality at construction sites. The AHP model was used to calculate integrated weights and rankings with a pairwise comparison questionnaire for experts. Conclusion: As a result of the analysis of the upper classes, construction machinery was evaluated the highest, and real-name management system was evaluated the lowest. As a result of the lower-level analysis, it was considered that opening doors for safety facility management, tower cranes for construction equipment, management under the "Occupational Safety and Health Act" under the real-name management system, and CEO duties for safety management organizations were the most important.
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.255-255
/
2023
우리나라의 경우 집중호우와 돌발홍수로 인한 침수 발생에 대응하기 위해 유역 및 하천관리 사업, 각종 풍수해 예방사업 등을 추진하고 있으며, 관련 분야의 스마트기술 도입을 적극 추진하고 있다. 그러나, 2013년 노량진 상수도관 공사 현장 사고, 2019년 신월 빗물저류 배수시설 현장 사고 등과 같은 건설현장 침수 피해 사고가 지속적으로 발생하고 있다. 또한, 건설현장의 다양한 조건 및 시시각각 변화하는 상황에 따라 구조적 대책 및 대응방안을 수립하는 데 한계가 있으며 지금까지는 법, 제도에 기초한 대응 매뉴얼을 제작·배포하여 현장 근로자 교육을 실시하는 수준에서 진행되어 왔다. 본 연구에서는 건설현장의 자연재해, 특히 수재해에 대응하기 위해 보다 과학적인 방법을 통한 현장 침수 예경보 체계를 수립하였으며, 강우예측-침수예측-침수예경보 생산-현장 상황전파에 이르는 일련의 시스템을 개발하여 공사별, 규모별, 공정별 침수 대응 솔루션을 제공하고자 한다. 건설현장 침수예경보 시스템 개발의 주요 내용은 요소기술 개발이며, 간략하게 정리하면 다음과 같다. ① 강우 예측정보 생산: 현장에서 발생하는 집중호우를 고려하는 실시간 강우측정 자료와 연계한 초단기 강우예측 기술 개발, ② 침수 예측모델 개발: 현장의 시공간적 특성, 수재해 피해의 유형 등을 반영할 수 있는 침수피해 예측 모델 개발, ③ 침수예경보 의사결정 방법론 개발: 침수 피해 예경보를 위한 침수 위험단계 세분화 및 노모그래프 개발과 모델 적용(예측정확도 85% 이상), 이를 통합하여 건설현장 침수예경보 시스템 개발을 수행하게 된다. 연구에서 개발된 침수 예경보 통합 시스템은 향후 수재해로 인한 건설현장의 인명, 재산 피해 최소화에 기여할 것으로 기대된다.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.5
/
pp.1147-1156
/
2015
The result of responsibility supervision system which has been enforced for the last twenty (20) years since January, 1994 is evaluated, and keeps an eye out the process of unification and absorption of the system into the construction management (CM). As a baseline data for this study, the grade framework of construction engineer's ICEC introduced with CM is summarized. In this manuscript, the questionaire survey for CM and ICEC was conducted toward the target group of road field construction engineers and analyzed the outcome of the respondents' answers. 50% of the respondents have answered positively for the question about converting responsibility supervision to CM. 48% of the respondents from construction works field have answered positively for converting responsibility supervision system to CM while 38% of the respondents from engineers of supervision field have answered positively, less positive than the answers from works field engineers. 46% of overall respondents have answered, however, to maintain the present system of 40%, 40% and 20% on the survey to the question asking the opinion on the ways of calculating ICEC to use the rates : 40% of career, 40% of qualification and 20% of academic achievements. However, it appeared that engineers who have comparative advantages with academic achievements and career, and engineers with lower grade qualification demanded higher rate for career.
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.301-301
/
2023
국가 수자원 중 농업용수 사용비율은 약 41%에 해당하며, 통합물관리측면에서 큰 비중을 차지하고 있다. 국가 수자원 전체 이용량 372억m3 중에서 농업용수가 40.9%인 152억m3로 가장 많고, 환경용수 121억m3(32.5%), 생활용수 76억m3(20.4%), 공업용수 23억m3(6.2%)등으로 추산된다. 국가 수자원관리의 중요성이 커짐에 따라 수량 및 수질관리를 환경부로 일원화하여 관리하며, 농업용수의 유역단위 물관리의 필요성이 요구되고 있다. 농업용수는 대부분 벼농사에 소비되고 있으며, 관개용수는 증발산량, 침투량, 자연 및 인위적인 배수량으로 소비된다. 회귀수량은 관개를 통해 농경지에 공급된 용수 중 작물에 의해 소모되지 않고 하천으로 유입되는 수량을 의미하며, 신속회귀수량(quick return flow)과 지연회귀수량(delayed return flow)으로 구분할 수 있다. 수자원장기종합계획에서는 35%가 하천으로 회귀되는 것으로 가정하고 있지만, 선행연구 결과에 의하면 국내 농업용수 회귀율은 기상상태, 작물재배품종, 재배형태, 용배수로 구조 등 여러 가지 요인으로 인하여 약 32 ~ 86%의 다양한 범위로 큰 차이가 나타난다. 이에 본 연구에서는 기존의 회귀수량 산정방법의 취약점을 보완하여, 수문모델링을 통한 유역단위 차원의 회귀수량 산정방안을 제시함으로써, 하천유지유량 관리 개선방안을 모색하고자 한다.
Korean Journal of Construction Engineering and Management
/
v.22
no.5
/
pp.3-16
/
2021
The purpose of this study is to verify the practical effectiveness of the constructivism education theory in building information modeling (BIM)/integrated project delivery (IPD) collaboration education by determining education methods that are most relevant to collaboration in the interaction process. We propose a BIM training model that enhances students' satisfaction in class and collaboration. We aim to identify interrelationships between BIM collaboration education and constructivism theories, examining constructivism methods in BIM/IPD classes to discern which are the most suitable for improving and enhancing collaboration and the proposed education model.
Sin Dong-Sung;Jeon Jae-Man;Koo Kyo-Jin;Hyun Chang-Taek
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.258-261
/
2003
Demolition is mort dangerous than construction and causes a lot of harmful environmental factors. But temporary fences used on demolition sites cannot play out their roles of blocking harmful environmental factors or securing stability and work space. They only block the view from the outside. This study begins with the possibility that the temporary fence can be installed prior to demolition. As a preceding step. we performed research on the actual conditions of using it. We then realized that it can be installed according to our research plan. First, we focused on actualizing the integration of temporary fences for demolition and construction. Here are the results of this study. First, we need to grasp the limiting factors of integration. Second, we ought to revise the Korean Architecture Standard Specification. Third, we should prepare against damage and transformation of fences. Finally, we can expect to reduce harmful environmental factors, cut down expenses, improve the working environment and raise the image of demolition by the integration of these fences.
Conventional disaster resources management systems among the several institutes are not mutually connected. In case of NDMS(National Disaster Management System), the data of the system is confined to the resources of the local governments and not connected with any other disaster resource management systems. Therefore, it is difficult to find the needed resources, when the large scale disaster is occurred. In this paper, we developed the integrated model of the distributed resources management framework considering the current resource management environment among the institutes. It is loosely coupling model under the centralized system, called IDRM(Integrated Disaster Resource Manager). The system will be verified with the test sites including Korea Expressway Corporation, JeonBuk local government, and Korea Construction Equipment Association. Via the field testing, the system will be the base of the real available system in the future.
Journal of the Korea Society of Computer and Information
/
v.14
no.8
/
pp.127-136
/
2009
Voice of the customer(VOC) is a term used in business and information technology(IT) to describe the process of capturing a customer's requirements in enterprises or various organizations. Recently, in order to satisfy customer's needs, enterprises try to utilize VOC at recurrence prevention of problems and their improvement activities, planning and development of product/service by processing, storing, and analyzing VOC. Until now, VOC management systems are introduced around service industries such as hotel business and insurance/financial business, etc. This paper proposes an integrated management scheme of VOC which are captured by various communication channels and describes a case of implementing an integrated VOC management system on the basis of the proposed scheme for the large-scale manufacturing company. By the implemented system, VOC are stored and utilized as the important knowledge assets of enterprises.
Kim, Jae-Jun;Choi, Cul-Ho;Shin, Hyun-Mok;Jin, Sang-Yoon;Lee, Kwang-Myung
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.170-175
/
2008
The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.