• Title/Summary/Keyword: 건설통합관리

Search Result 642, Processing Time 0.047 seconds

Development of Labor Productivity Index for Steel Construction (철골공사의 노동생산지수 개발)

  • Kang Byoung-Ryoul;Kim Ki-Sung;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.353-357
    • /
    • 2004
  • The construction competition is more deepened with the enterprise possibility increase which it follows in the regulation relaxation back against the construction market penetration which carries and the instability of market is added an extra weight and it solves the aspect where also the profitability which is caused by with low price bidding decreases. Against a productivity with the overcome plan it is researched plentifully and the far for a productivity improvement, there is so far to construction, the productivity being used with only include meaning, is to a practical affairs and the application ver)r as the level which is feeble is a possibility of doing. It is like that and the research develops the producing district possibility of new steel-frame work and in the actuality which sees the production volume of steel-frame work and a construction accomplishment process effectively and to be right numerical figures it does it plans it controls and manages the place ultimate objective which it puts.

  • PDF

A Promotion Plan through Measuring the Utilization of Information Classification Systems in the Construction Industry (건설정보 분류체계 활용도 측정을 통한 분류체계 활성화 방안)

  • Park, Hwan-Pyo;Lee, Jae-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.90-100
    • /
    • 2004
  • The importance of information management has been emphasized in Korean construction industry, Both public and private have invested to establish and operate construction CALS, construction management (CM), computer integrated construction(CIC), and earned value management system(EVMS). A standard construction information classification system is essential to operate the systems mentioned above. Therefore, Korean government released Integrated Construction Information Classification System(ICICS) in 2001. However, the ICICS is not widely used in construction due to: 1) difficulty of changing existing system, 2) insufficient publicity of the ICICS, and 3) no legal binding force. Especially, participants in construction do not recognize applicability of the ICICS. This research surveyed the degree of recognition and utilization of the ICICS. This survey includes both customized classification systems used by companies and the ICICS and investigates the degree of utilization and drawbacks. The results show some construction companies use their own classification systems and the others use the ICICS prepared by the government. Furthermore, the degree of recognition is in sufficient. The degree of use in design management, specifications, cost and schedule management is very limited. The publicity and education are critical to induce the utilization of the ICICS. The necessity of revision was recommended based on pilot project study that is performed to measure the degree of application of ICICS on the projects. Therefore, this research proposes the measurement model for information application and analyzes the degree of utilization of the ICICS in different phases of construction.

Integrated Management Method of Compensation Data for Advanced Compensation Business (보상업무 선진화를 위한 범국가적인 보상자료 통합 관리방안)

  • Seo, Myoung-Bae;Kim, Nam-Gon
    • Annual Conference of KIPS
    • /
    • 2011.11a
    • /
    • pp.1507-1509
    • /
    • 2011
  • 공익사업 수행시 발생하는 용지보상은 매년 20조원에서 30조원에 이르는 막대한 예산이 투입되고 있는 반면 각종 규정과 업무절차가 복잡하여 업무처리에 많은 인력과 시간이 소요되고 있다. 이에 국토해양부와 같은 중앙부처, 지방자치단체, 도로공사 등 주요 공익사업 사업시행자들은 기관별로 별도의 보상시스템을 구축하고 있다. 하지만 교육과학부, 국방부 등 보상시스템을 사용하지 않는 중앙부처가 대부분이고 기 개발되어 있더라도 시스템 활용도가 낮아 보상시스템을 활용한 보상통계자료의 작성 등이 어려워 매년 국가가 취득하는 공공용지 취득실적 및 규모 등을 파악하기가 어려운 실정이다. 또한 회계시스템과 연계가 되어 있지 않은 시스템이 많아 정확한 보상비 집행실적 추적이 어려워 과세자료 누락으로 인한 세금 누수가 발생하고 있다. 더불어, 과다보상비 책정 및 지급시 이를 체계적으로 추적할 수 있는 전산자료 부재 등으로 보상비 집행의 투명성이 저하될 소지가 있다. 이에 중앙부처, 지방자치단체 및 공공기관별로 용지보상시스템 사용현황을 파악하고 이들을 근간으로 범국가적으로 보상업무를 선진화 할 수 있는 보상자료 통합 관리방안을 제시하고자 한다.

A study on the Improvement of the Construction Post-evaluation System in Public Construction Projects (건설공사 사후평가시스템의 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Jin-Uk;Yang, Sung-Hoon
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2015.07a
    • /
    • pp.305-308
    • /
    • 2015
  • 건설공사 사후평가는 공공건설사업 수행성과를 평가하고 차후 유사사업 추진 시 이를 활용하여 공공건설사업 효율화에 기여하기 위한 제도이다. 국토교통부에서는 발주청별로 실시하고 있는 건설공사 사후평가의 결과정보를 체계적으로 통합 관리하고, 이를 활용할 수 있도록 건설공사 사후평가 시행지침을 기초로 한 건설공사 사후평가시스템을 구축하여 운영 중에 있다. 하지만 사후평가 시행지침의 개정에 따라 입력양식 및 관리항목이 변경되고, 축적된 사후평가 결과정보의 분석기능 등의 부족으로 유사 건설사업 수행시 활용 체계가 미흡한 실정이다. 본 연구에서는 건설공사 사후평가 시행지침의 개정과 분석 및 통계기능 강화를 위해 따라 건설공사 사후평가시스템의 개선방안을 제시하고자 한다. 이를 통해 사후평가시스템의 활용도를 제고하고 유사 공공건설사업 수행시 시행의 효율성을 도모할 수 있으리라 예상된다.

  • PDF

Identifying the Organizational Competency Factor for Implementing AWP (Advanced Work Packaging) in perspective of Korean EPC Contractor (AWP (Advanced Work Packaging) 체계 도입을 위한 국내건설기업의 필요 조직역량 도출 연구)

  • Moon, Soohwan;Yun, Sungmin;Park, Chan Young;Cho, Tae Sang;Han, Seung Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.20-27
    • /
    • 2020
  • EPC contractors have made continuous efforts to develop integrated project execution methods to improve the performance of industrial plant project. In particular, the concept of Advanced Work Packaging (AWP) has been recently presented by readjusting the existing "Work Packaging" concept as part of the integrated project execution method from the project life-cycle perspective. However, Korean EPC contractors are still unfamiliar with the AWP implementation. Thus, this study aims to identify the organizational competency factor for effective implementation of AWP. For this purpose, first, this study identified the expected risks in AWP project and the 29 organizational competency factors to manage risks. Second, five experts verified the suitability of factors and supplemented the factors. Finally, 37 factors were identified as organizational competency factors for implementing AWP.

Development of Risk Analysis Structure for Large-scale Underground Construction in Urban Areas (도심지 대규모 지하공사의 리스크 분석 체계 개발)

  • Seo, Jong-Won;Yoon, Ji-Hyeok;Kim, Jeong-Hwan;Jee, Sung-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.59-68
    • /
    • 2010
  • Systematic risk management is necessary in grand scaled urban construction because of the existence of complicated and various risk factors. Problems of obstructions, adjacent structures, safety, environment, traffic and geotechnical properties need to be solved because urban construction is progressed in limited space not as general earthwork. Therefore the establishment of special risk management system is necessary to manage not only geotechnical properties but also social and cultural uncertainties. This research presents the technique analysis by the current state of risk management technique. Risk factors were noticed and the importance of each factor was estimated through survey. The systemically categorized database was established. Risk extraction module, matrix and score module were developed based on the database. Expected construction budget and time distribution can be computed by Monte Carlo analysis of probabilities and influences. Construction budgets and time distributions of before and after response can be compared and analyzed 80 the risks are manageable for entire whole construction time. This system will be the foundation of standardization and integration. Procurement, efficiency improvement, effective time and resource management are available through integrated management technique development and application. Conclusively decrease in cost and time is expected by systemization of project management.

Development of Progress Management System based on Quality Inspection Information - Case Study on Nuclear Power Plant Construction - (품질관리 정보를 기반으로 한 진척도 관리 시스템 개발 - 원자력발전소 건설공사 사례를 중심으로 -)

  • Kwahk, Kil-Jong;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.73-84
    • /
    • 2011
  • This study represents construction progress management model based on quality inspection process in addition to cost-schedule integration. Quality inspection process cycle, resource estimate as progress measurement parameter, hierarchical structure of schedule, and inspection lots linking quality inspection to resource estimate are addressed as four main information areas. The authors established several process models to give a structure and correlations among information elements on each of these areas. Applying the process models proposed, an information system was implemented and utilized for nuclear power plant construction. It reveals that the system achieves accurate and objective progress information in near real time with significantly reduced time and effort as well as administrative efficiencies from making quality inspection process online.

Integrated sediment management for guidelines (통합적인 토사관리를 위한 가이드라인)

  • Kim, Yeon joong;Kim, Tae woo;Woo, Joung woon;Yoon, Jong sung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.294-294
    • /
    • 2020
  • 연안표사는 해안의 정선이 후퇴해 침식이 심각해지는 한편, 항만·어항에서는 토사가 퇴적되어 선박이나 어선의 항로나 정박지 매몰로 선박의 항행 및 어업 활동에 지장을 초래하며 하천 하구부에서는 하구 폐쇄로 치수상의 문제점 등이 발생한다. 항만과 어항 관리자는 항로나 정박지의 매몰 대책에 대한 검토와 해안 관리자는 해안 보전 대책에 초점을 맞춰 제각기 목적을 위한 대책 검토를 수행하고 있다. 이처럼 매년 적지 않은 비용이 소요됨에도 불구하고 뚜렷하고 효과적인 대책 없이 연안에 인위적인 변화를 발생시켜 어디에선 모래가 퇴적되고 그 영향에 따라 또 다른 곳에서는 침식되는 악순환이 반복되고 있다. 연안침식 방지를 위한 대책을 구축하기 위해서는 어느 한 곳에 중점적인 대책이 아닌 표사계 전체의 관점에서 상호 간의 간섭 효과를 고려한 통합적인 관점으로부터 대책을 강구해야 할 것이다. 연안지역에서의 표사수지는 산지, 댐, 하천, 해안 등 각각의 영역으로부터 유입 및 유출에 따라 안정된 해안이 조성된다. 하지만 환경적 및 인위적 변화에 따라 안정된 표사수지는 파괴되며 이 영향에 따라 표사의 이동이 발생한다. 지금까지의 토사관리는 각각의 영역에서 재해저감 및 토사관리를 위한 여러 대책의 효과가 나타나고 있으나 통합적인 토사관리에 있어 상호간의 피드백이 단절되어 연안역에서 발생하는 침식에 대한 정확한 원인 규명에 많은 어려움과 문제점이 발생하고 있다. 이처럼 통합적인 연안침식 관리를 위해서는 연안역으로 유입되는 토사의 이동 메커니즘 규명이 매우 중요하며 이를 바탕으로 정확한 유사량 산정을 통해 적절한 대책을 마련할 수 있다. 또한, 지역적 특징이 강한 우리나라에서는 통합적인 연안관리를 위한 구체적인 방안 검토가 이루어지고 있지 않지만, 일본에서는 지속적인 관측과 모니터링 조사를 통해 체계적인 관리를 수행하고 있다. 따라서 본 연구에서는 일본에서 진행 중인 통합적인 토사관리 가이드라인에 따른 토사관리의 구체적인 방법과 그에 따른 정선변화 및 표수사지 체계를 산정하였다.

  • PDF

A Process Improvement in Building Constructions using Value Stream Analysis - Focused on slab works - (가치흐름 분석을 통한 건설공사의 공정개선방안 - 슬래브 공사를 중심으로 -)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook;Jang Chan-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.527-530
    • /
    • 2002
  • The purpose of this study is to present an improvement of the form work process. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Understanding of non-value adding activities in existing slab form work process 2) Process integration by value stream mapping 3) Effect analysis of time-cost reduction. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction.

  • PDF

A Study on Improvement of Nuclear Power Plant Construction System According to Data-centric Design Technique Introduction in Korea (데이터 기반 설계기법 도입에 따른 원전 건설관리체계 개선방향 고찰)

  • Lim, ByungKi;Byon, Sujin
    • Journal of Energy Engineering
    • /
    • v.25 no.1
    • /
    • pp.108-112
    • /
    • 2016
  • This study is established the data-centric design concept, which is the latest design technique, by analyzing existing study literature for its application on the nuclear power plant industry in Korea. This study investigated the data-centric design cases in the advanced companies and suggests a data-centric design integrated system framework by analyzing the major functions of the commercial 3D CAD system, which is globally used in the plant architect engineering. In order to apply the data-centric design integrated system framework to the nuclear power plant industry in Korea, the main functions of a nuclear power plant design information integrated system framework, which can manage the design products of each EPC step and the related information in integrated way, is suggested by analyzing the supplier design, field design process and field design drawings, which have close relation with the plant Architect Engineering (A/E). It is expected that the result of this study would contribute in the dramatic enhancement in the job efficiency of nuclear power plant design process in Korea.