• Title/Summary/Keyword: 건설정보구조

Search Result 503, Processing Time 0.026 seconds

Extracting Building Element Geometry from BIM/IFC Physical Files (BIM/IFC 파일로부터 건물요소의 형상모델 추출에 관한 연구)

  • Goh, Il-Du;Choi, Joong-Hyun;Kim, E-Doo;Lee, Jae-Min
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.22 no.2
    • /
    • pp.163-172
    • /
    • 2009
  • BIM technologies based on three-dimensional parametric solid modeling can provide building industries with a wide range of information, and then enable not only to automate architectural drawings, detect clashes between building components, and estimate building materials, but also to manage effectively architectural and engineering information about building spaces, structures, energy, just-in-time delivery, facility management, and code checking. This paper presents an implementation to extract geometric data from IFC files, and validates the system with simple and complex buildings.

A Study on the Development of Construction Progress Management system based on BIM (BIM 기반의 건설공사 진척관리 시스템 개발을 위한 기초연구)

  • Shin, Yoon-Kyung;Kim, Sun-Hyo;Park, Sung-Han;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.525-528
    • /
    • 2010
  • 본 논문은 BIM기반 건설공사 진척관리 시스템의 개발 방향을 제안하는 것이다. 이를 위해 일차적으로 기존 4D 진척관리프로그램인 Synchro 4D와 Navisworks를 분석을 하여 문제점을 도출했다. 이를 극복하고자 국내실정에 맞는 방안 및 공정과 3D객체 연계의 효과적 방안을 제안하였고 예상공정과 실제공정의 시각적 비교 기능 및 통합건설정보관리 기능 추가를 제시하여 이 프로그램의 본 목적인 효율성 증진을 위해 향상된 진척관리 방식을 제안하고자 하였다.

  • PDF

Development of the CII Knowledge Structure (건설지식정보분류체계의 개발 - CII 사례를 중심으로)

  • Kim Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.61-66
    • /
    • 2003
  • The industry is becoming more competitive and it is essential for any organization to continuously improve in order to stay competitive. As an effort to increase their technical and managenial capabilities, many organizations have been trying to adobt 'new knowledge' coming out of research and implementing it to their business processes. It is a common belif that tins theme of 'Knowledge Management' is helpful in keeping organizations healthy and competitive. This study was performed in the context of 'Knowledge Management'. This paper will describe the development process of the CII Knowledge Structure which was developed by CII to help its member organizations become incresingly 'knowlege-oriented'. The CII Knowldege Structure systematically organizes 'knowledge' that has been produced from various CII Research. Structure and contents of the CII Knowledge Structure and the implications of development of the Knowledge Structure will also be discussed in this paper.

  • PDF

Applicability of Flash LADAR to 3D Spatial Information Acquisition on a Construction Site;Performance Review (건설 산업에서의 3차원 공간 모델링을 위한 플래시 레이다의 적용성 검토에 관한 연구)

  • Son, Hyo-Joo;Kim, Chang-Wan;Yoo, Ji-Yeon;Kim, Hyoung-Kwan;Han, Seung-Heon;Kim, Moon-Kyum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.909-914
    • /
    • 2007
  • Today's dynamic nature of the construction environment requires management systems to be active enough to take real-time decisions. For real-time decision making, effective 3D spatial information acquisition is imperative. Various 3D data acquisition technologies are being developed and tested for 3D spatial information acquisition and its use for wide range of areas in the construction industry, however, there are shortcomings in these technologies. The major problems are long processing time and high cost which make current technologies impossible to be used for real-time applications. Laser-based Flash LADAR that illuminates the entire scene with diffuse laser light is comparatively fast and cost effective, therefore it is well suited for 3D spatial modeling of dynamic environment on a construction site. This paper presents experimental results to evaluate the performance of flash LADAR and discuss issues of applicability of Flash LADAR to 3D spatial modeling on a construction site.

  • PDF

Detecting and Analyzing Crack Image of Tunnel Construction (터널 구조물의 균열 영상 인식 및 분석)

  • 김영린;정동현;진광원;이강문;송창근
    • Proceedings of the Korea Multimedia Society Conference
    • /
    • 2004.05a
    • /
    • pp.263-266
    • /
    • 2004
  • 본 논문에서는 터널 구조물에서 발생하는 균열의 인식과 이에 대한 정보를 획득하기 위한 방법에 대한 연구를 수행하였다. 터널 구조물에서 발생하는 균열의 경우, 건설 분야의 특수성 때문에 기존의 경계점 인식(edge detection) 알고리즘을 적용하는 경우 정밀도 저하의 문제가 발생한다. 이러한 문제점을 해결하고 더불어 정밀도를 향상시킬 수 있는 방법으로 영상에서 균열을 인식하는 균열 인식 단계와 인식된 균열의 길이, 두께 등을 측정하는 균열 정보 획득 단계로 구분하였다. 균열 인식 단계에서는 균열의 시작점과 끝점을 기준으로 휴리스틱(Heuristic) 알고리즘을 사용하여 픽셀 값의 분포에 따라 균열의 중심선을 계산하여 균열을 인식한다. 균열 정보 획득 단계에서는 균열 인식 단계에서 얻은 정보를 통해 균열의 길이, 진행 방향 정보, 그리고 균열의 두께를 계산한다. 균열의 길이 및 진행 방향 정보는 균열 인식 단계에서 얻어진 정보를 통하여 계산하며, 균열 두께 측정은 각 픽셀의 누적 값을 이용하여 계산하는 원형 검출기(Daugman 알고리즘)를 변형하여 사용하였다.

  • PDF

Improvement Model of Defect Information Management System for Apartment Buildings (공동주택에 대한 하자정보 관리시스템의 개선 모델)

  • Kang, Hyunwook;Park, Yangho;Kim, Yongsu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.13-21
    • /
    • 2019
  • The purpose of this study is to suggest an Improvement Model of defect information management system. The improvement model adapts methods for the residents to input defect information correctly and share to defect information with construction company. The adapted research method is review for existing defect information management system and suggested for data flow diagram of improvement model. The results of this study are as follows: The basic design of the information input window of the defect information management system for connecting with big data was made. And 5 point scale was applied to evaluate the convenience, simplicity, accuracy, necessity, and usability of the improvement model. It is evaluated that the economic effect caused by using the improvement model is saved by about 151 million KRW compared to the existing method. The Improvement model is used utilize big data in correct defect management and decision making.

A Study on the User Satisfaction of Records and Information Management System in Construction (건설 기록정보관리시스템 이용만족도에 관한 연구)

  • Yun, Kyoungsook;Lee, Yebin;Kim, Seonghee
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.27 no.2
    • /
    • pp.5-27
    • /
    • 2016
  • To be able to present authenticity, or to cope with patent related cases or any possible law suite for intellectual. The purpose of this study was to investigate factors affecting the satisfaction of records and information management system on the construction industry. Data was collected through a survey of 129 employees who work for A engineering company. Independent variables in this study included system quality, information quality, and service quality. Latent variable was selected as easy of use and usefulness. Dependent variable was user's satisfaction for the system. The results of analysis of structural equation modeling showed that system quality was found to have both direct and indirect impacts on user's satisfaction. On the other hand, information quality was significant only in direct impact on ease of use. Service quality was not statistically significant in the effect on user's satisfaction.

Approach to improve construction management using Information Technology (IT) (정보기술(IT) 기반을 통한 시공관리 선진화 방안)

  • Lee Woo-Bang;Moon Jin-Yeong;Moon Byeong-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.115-122
    • /
    • 2002
  • There is various points that should be improved in Fairness such as our contract practice to propose construction projects, project managing and the stakeholders' way of thinking and culture. We consider that the revision of construction related provisions and systems is required but even more, an overall change in business management through the implementation of Integrated Construction Information Management System that will enable the owner, which drives the project, and contractor sharing construction information is required. To mange construction related information in an integrated manner, designing information should be smoothly transferred to purchasing information, and changes are required in order to move ahead to process-oriented work system. Finally information created from various construction organizations should be delivered in an aligned and standardized manner as well. The domestic Nuclear Power Plant Construction has been accepting various technology transfers from U.S, France, Canada and UK, which enabled us to self-support technology and recently even proceeded to the phase exporting our technology to others. However, continuous effort is required to improve internal business efficiency and to respond to external environmental change such aselectricity market deregulation. Recently, in accordance with the result in number of CEO's intention to make progress in IT and improve business efficiency, the number of enterprises introducing Enterprise Resource Planning is increasing. ERP is an innovative tool which changes the way of performing work from organization and department orientation to process-orientation in order to optimize the resources, such as human and material resources, through out the Enterprise by performing BPR which will maximize overall business efficiency of the enterprise, such includes not only construction management, but also business management. KHNP continued to performing large scaled construction projects such as nuclear power plant construction for past 30 years and took the initiatives of large scale project management and Quality management ability in domestic industry by having independent capability of over all construction planning, purchasing and, construction and start up management etc. To maintain our leading position of improving construction management technology based on our accumulated project management experience and technology, KHNP included construction into our ERP project in purpose of innovating construction business. We would like to discuss the characteristics of nuclear construction business, project management system, information system infrastructure and information sharing system among construction related entities, and implementation practices for information system, and consider how to resolve our practice that should be improved in this thesis.

  • PDF

Virtual Construction System for Visualizing Risk Management Information (건설공사 리스크관리기법의 가상건설시스템 연동 방법론 연구)

  • Kim, Hyeon-Seung;Park, Jin-Jung;Park, Nam-Jin;Choi, Gwang-Yeol;Seo, Hwa-Jin;Kang, Leen-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.77-80
    • /
    • 2010
  • 최근 건설 프로젝트의 대형화 및 다양한 신공법들의 도입으로 불확실한 위험도 요인들이 점점 증가함으로써 일련의 시스템적 절차에 따른 리스크관리 (Risk Management)체계와 프로젝트 참여자들간의 효율적인 정보전달 방안이 요구되고 있다. 이를 위해 본 연구에서는 '리스크 시각화 시뮬레이션 구축 방법론'을 제시한다. 이는 최근 각종공사 정보 시각화부분에서 주목받고 있는 4D CAD 기술과 리스크 분석을 시스템적인 절차로 구성하여 연계한 방법이다. 시스템적 리스크 분석 절차는 리스크관리기법인 AHP 및 퍼지 분석기법을 동시에 적용하여 합리적인 리스크 정량화를 수행할 수 있도록 구성하였다. 그리고 이로부터 산출된 리스크 요인별 위험정도는 WBS 코드체계 기반으로 4D CAD의 공종과 연계되어 리스크 정도 수준에 따라 설정된 색상으로 시뮬레이션이 구현되도록 구성하였다. 이러한 방법론은 IDEF0 모델링 기법으로 제시함으로써 향후 시스템 구축의 기초 자료로 활용할 수 있도록 하였다.

  • PDF

초고속정보통신망과 CALS

  • Korean Associaton of Information & Telecommunication
    • 정보화사회
    • /
    • s.100
    • /
    • pp.37-39
    • /
    • 1996
  • 초고속정보통신망은 정보 서비스의 다양화, 정보통신의 대량화 및 정보서비스의 고속화에 대한 요구에 따라 대두된 정보 고속도로(Information Superhighway)의 개념이다. 정보고속도로 구축사업은 세계적인 정보화 추세에 따른 국가정보화의 하부구조(NII: National Information infrastructure)를 구축하는 것으로 미국에서는 초고속정보통신망 구축사업(GII: Global Information Infastructure)을 추진하고 있으며, 일본에서는 신사회 자본건설, 유럽연합에서는 고속행정통신망, 싱가폴에서는 IT-2000이라는 계획 아래 추진되고 있다.

  • PDF