• Title/Summary/Keyword: 건설사업관리

Search Result 1,844, Processing Time 0.023 seconds

Analysis of Factors Affecting Job Competency of Quality Management for a Construction Manager (건설사업관리자의 품질관리 직무 역량에 영향을 미치는 요인 분석)

  • Jung, Seoyoung;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.65-73
    • /
    • 2017
  • Today, the United States, Europe and other advanced organizations are utilizing the concept of competency-based HR management. Recently, many organizations in Korea are also managing workforces by introducing the concept of job competencies in personnel management. However, in spite of the current trend, domestic human resources management methods for construction managers continues to operate by asking about work experience, licensing, education level, etc. This is a seniority system and it functions separately from an assessment of practical job competencies for the business. Moreover, construction management work has been very fragmented in terms of expertise and capacity depending on the type of management work and project progress. Therefore, it is necessary to develop a competencies management system for each business segment to effectively manage job competencies that reflect the the characteristics of a construction manager' s work. As such, the aim of this study is to analyze human resources management methods pertaining to domestic construction managers and present challenges and limitations in current practices. In particular, factors affecting the job competencies of construction managers are analyzed statistically. The results of this study will be used as the basis for future research into development of a construction manager competency management system.

협회 탐방/본회 - 협회의 사업집행 및 행정업무를 담당하는 대한설비건설협회 기획관리실

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.233
    • /
    • pp.41-43
    • /
    • 2009
  • 본지는 지난 2008년 5월호부터 서울특별시회를 시작으로 2009년 10월호에 제주특별자치도회까지 13개 시 도회 사무처를 게재함으로써 대한설비건설협회 시 도회의 사업추진 및 업무현황에 대한 회원사의 이해를 도왔다. 이번 호부터는 전국 13개 시 도회를 대표하여 설비건설업계의 발전 및 위상강화, 회원사의 권익 보호 등을 추진하고 있는 본회에 대하여 소개한다. 본회는 건설진흥사업 외에 기술 가스진흥사업, 회원봉사 및 조사사업, 정보화 사업, 기획 관리사업, 홍보사업 등 다양한 사업활동을 함으로써 설비건설업계 발전에 견인차 역할을 담당하고 있다. 이번호는 협회의 사업집행 및 행정업무 등 협회 운영의 포괄적인 업무를 담당하고 있는 기획관리실을 게재한다.

  • PDF

A Study on Cost Management at the Pre-construction Phase in the Korean Construction Market (공공건설사업 시공 전 단계 사업비관리 개선에 관한 연구)

  • Kim Min-Kee;Shin Sung-Hoon;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.265-270
    • /
    • 2002
  • Frequent design changes or unnecessary project executions due to illogical practice, lack of feasibility study and, hasty drive have raised problems of budget waste in Korean construction projects. Since the MOCT (Ministry of Construction & Transportation) published Master Plan for budget efficiency for government projects, there have been a lot of policy efforts for budget saving. However, it has been pointed out that cost management at the pre-construction phase, which greatly influences the cost still remains imperfect. The target cost for government clients is not being estimated reasonably, and cost controlling at the pre-construction phase is not yet being carried out properly for keeping the budget. Therefore, improved construction cost management at the pre-construction phase was proposed in this paper. The cost management systems of advanced countries were investigated for it, and the issues were drawn from the cost management systems of these countries. On the basis of the issues, the present conditions and problems of domestic construction cost management at the pre-construction phase were analyzed for suggestion.

  • PDF

Satisfaction Level and Performance Evaluation for CM Service in Korea (국내 건설사업관리 업무만족도 및 성과평가)

  • Kim, Won-Tae;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.108-117
    • /
    • 2013
  • The domestic CM business market has continued to grow, but its size is relatively small yet in comparison with the total size of the domestic construction industry. Evaluation of CM projects was conducted through questionnaire surveys. Both clients and CM firms showed positive satisfaction levels. Nevertheless, the clients' satisfaction levels were relatively low in safety management, cost management, and document and information management. Superior areas of CM tasks were time management and recovery scheduling, quality control and technical instruction, and design value engineering. On the other hand, inferior areas of CM tasks were claim analysis and dispute resolution, cost estimation, and life cycle costing. Both entities have agreed with the positive effects of CM involvement in terms of cost saving, time reduction, quality improvement, and safety incidents prevention to at least 0~5% extent.

Development of Change Management System for Urban Development Project (신도시 건설사업의 변화관리시스템 구축에 관한 연구)

  • Cho, Jinyoung;Jang, Ounsung;Yu, Junhyuk;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.79-86
    • /
    • 2014
  • Construction project become larger and more complicated. Korea go through government complex relocation Mega-size program including many sub-projects which were complicated, long-term, and need extensive funding. Effective change management is very important for this kind of mega-project since it has many stakeholders and can't avoid continual change of schedule, budget, etc. Especially, change management process and system is very important for program success. When each project have changes, program is impacted by these changes. So, Change management is very important for effective program budget and time management. This study try to develop change management process and framework considering continuous changes in project level for effective program management. In addition, this study developed change management system and applied it to new mega-size program and analyze the effectiveness.

A Study on Competency Evaluation and Improvement Plan of Electrical Construction Management Using Importance-Performance Analysis (IPA를 활용한 전기공사 건설사업관리 역량 평가 및 개선방안 연구)

  • Kim, Seungbeum;Byun, Jeongyoon;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.103-112
    • /
    • 2014
  • Since recent construction projects become larger and complicated, the level of difficulty of management skill is rising, and the risk is increasing accordingly so the necessity of improving management skill of projects is increasing. In order to solve this problem, Construction Management system was preferentially introduced in construction projects but in case of domestic construction industry, separate contracts by business boundary are being made so the actual state is that the function of the Construction Management system is not properly operated over the overall projects. The partial operation of Construction Management system like this may impose many restrictions on converged and combined projects such as smart grid and intelligent buildings etc. in the future. For improvement of management skill of domestic construction projects, the competence of project management skill by work areas that can overcome heterogeneity of the current project management skill shall be secured, and any factor that impedes cooperation ability shall be found and that shall be solved. Therefore, the difference of work competency of project management system of construction and electrical construction is to be analyzed by utilizing IPA model in this study, and a plan to introduce the project management system of electrical construction for efficient operation of projects is to be looked into.

A Case Study of Construction Management for Pusan National University Children's Hospital (부산대학교 어린이병원 건립사업 CM 수행사례)

  • Yang, Jin-Kook;Ri, Min-Hyeon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.13-18
    • /
    • 2007
  • The construction by the ministry of health and welfare support of the first special hospital for only children in busan and gyeong-nam is under building with YPNUH(Yangsan Pusan National University Hospital) for the best medical treatment town and is to improve the productivity and efficiency by eliminating unproductive and inefficient fact through the construction management, systemic and scientific management technique. So in this study we would like to suggest the generated effect to apply project management technique to all stage such as from pre-design phase, turn-key enterprise choice, construction, design VE(Value Engineering), PMIS (Project Management Information System) construction to maintenance phase and cost and schedule reduction effect through basic, execution design VE by using engineer of field.

  • PDF