Improvement of estimating method for construction management service fee by case study (사례분석을 통한 건설사업관리 대가산정 방법 개선)

  • Lee, Ung-Kyun;Yoo, Wi-Sung;Kim, Dong-In;Kim, Tae-Hoon;Cha, Min-Soo;Cho, Hun-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.16-24
    • /
    • 2012
  • The objective of this paper is to suggest the improvement of estimating system for construction management (CM) service fee through the analysis of the previous literatures and criteria and case study. In order to do this, this paper considered the relevance of existing criteria to estimate the CM service fee, the condition of input ratio of engineering resources in the real cases, and current utilization strategy of nonresident technical engineers. Based on the analysis, the following problems were identified; a) the different estimating system for CM fee and construction supervision fee, b) impractical estimating system for the CM fee, and c) inappropriate allocation of human resources for CM. Consequently, this paper suggested the following 4 items for the improvement of the existing system; (1) modification of the current structure of CM fee calculation, (2) rationalization of current level of the CM fee which is required to be raised approximately 5.4 percent compared to design or supervision fee, (3) securement of elasticity of the input ratio of engineering resources from the inception phase, and (4) development of the utilization strategy of nonresident engineers based on the technical requirement of the jobsite. Thus, it is anticipated that this research would affect the compensation package of CM in order to make the estimation process of CM service fee more efficient and to revitalize CM as business.

Wiki-based Interactive Electronic Technical Manuals (IETM) for Construction Project Management : Through a Case Study of Urban Regeneration Projects (Wiki기반 건설 사업관리 전자매뉴얼 : 도시환경정비사업 사례연구를 통해)

  • Park, Moon-Seo;Kang, Sung-Hoon;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.3-12
    • /
    • 2010
  • Recently, workers on construction sites can hardly understand their tasks and the process of the tasks because the construction projects are becoming large and complex. Due to the complexity, workers need a tool that can help them understand their works and some paper-based manuals exist to support them. However, the existing paperbased manuals are not actively used by workers due to the low credibility of information on the manual. In particular, paper-based manual can not be updated frequently because those manuals have to be manually updated by experts. Thus, the credibility of information is decreased and the decrease let the users distrust information of the paper-based manual. Therefore, this research analyzed the feature of wiki-based system and suggested an wiki-based IETM(Interactive Electronic Technical Manual) system model that can be modified by users, and then conducted a survey through a prototype based on urban regeneration project. The result of the survey indicated that wikibased IETM can improve the stakeholder communication by reinforcing the process of creating knowledge as well as knowledge itself.

A Study on the Application of Construction Management Delivery System by Characteristics of Facility (건설사업관리 발주방식의 시설물 특성에 따른 적용방안에 관한 연구)

  • Gee, Hyoung-Kwon;Kang, Hyun-Wook;No, Jae-Deuk;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.449-454
    • /
    • 2008
  • The purpose of this study is to analyze, applications of the construction management delivery systems according to characteristics of facilities. The adapted research method is to selected four mall in the capital region and then divided them into two groups: CM for Fee or CM at Risk. After analyze each applications and administrations, it could propose proper applications of CM for fee according to CM at Risk. The results of this study are as follows: 1) the CM for Fee was suitable for the projects focused on completing on time and constructing the effective business plan of quality control, and 2) the CM at Risk was suitable for the projects concentrated on the cost reduction through shorten the construction time and the related businesses on quality control.

  • PDF

An Analysis on the Propriety of Labor Input at Design Stage in Construction Management (건설사업 관리에 있어서 설계이전단계의 인력투입 적정성 분석)

  • An, Yang-Hoan;Kim, Young-Ai;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.32-41
    • /
    • 2009
  • In the execution of construction management, such pre-design steps as a planning stage, a basic design stage, and a work design stage are regarded as more important than an actual construction stage. However, the manpower input criterion from the aspect of construction management price standard in the Construction Engineering Management Law does not attach weight to the pre-design stage. In this regard, the aim of this study was to examine the propriety of manpower input in the pre-design stage of construction management and then present an improvement strategy of it. For this, the investigator examined the criterion of service price prescribed in the Construction Engineering Management Law and then comparatively analyzed four sites of construction management services. Study findings are as follows: 1) the actual state of manpower input based on the stepwise average price criterion of construction management service is presented with such steps as the newly established planning step (6.6%), the basic design stage (3.9%$\rightarrow$5.6%), the practical design stage(7.6%$\rightarrow$13.5%), the construction stage (88.5%$\rightarrow$64.0%), and the newly established maintenance stage (10.3%). The average price criterion is classified by total construction expenses and calculated by improved rates and stage; and 2) the three-step criterion of the Construction Engineering Management Law is classified into five stages including the planning stage and the maintenance stage by dividing it with the stepwise construction businesses. Study findings show that the calculation of price criterion in the actual site of construction management services must be operated in a practical and flexible manner and the systematic improvement of stepwise manpower input must be carried out actually.

Integration for Port Construction Project Management System (항만건설사업관리시스템 통합화)

  • Jeong, Seong-yun;Kim, Young-jin;Kim, Tae-hak;Ok, Hyun
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2013.05a
    • /
    • pp.431-432
    • /
    • 2013
  • 본 연구는 기존에 운영 중인 항만건설통합정보시스템의 활용성과 시스템 운영관리의 효율성을 높이기 위해 시스템을 통합화하였다. 도로와 항만 건설사업관리는 대상목적물만 다르고 기본적인 업무프로세스는 유사하다. 따라서 통합 개발기간을 단축하고 안정적으로 통합화하기 위해 항만건설통합정보시스템을 기존에 운영하고 있는 도로건설사업관리시스템으로 통합하는 방식으로 추진하였다. 도로건설사업관리시스템은 항만건설통합정보시스템보다 시스템 사용이 쉽고 편리하며 건설사업관리 업무프로세스 지원 및 관리기능이 안정적으로 설계되었다. 본 연구는 시스템 통합화 과정에서 겪었던 애로사항과 이를 해결하기 위한 방안을 제시하였다. 타 시스템을 통합화할 경우에 본 연구 결과를 활용한다면 반복적인 시행착오를 미연에 예방할 수 있을 것으로 사료된다.

  • PDF

Suggestions on Efficient Cost Management for Public Construction Projects - Focused on Total Project Cost Management System- (공공건설사업 사업비 관리의 문제점 및 개선방안 - 총사업비관리제도를 중심으로-)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.12-21
    • /
    • 2013
  • Total Project Cost Management System(TPCMS) was introduced with the purpose of increasing the efficiency of cost control for public construction project in 1994. In this paper, general perception of participants of the public construction project on the TPCMS was examined, and the problems in implementing the TPCMS was figured out through expert interviews and survey. Then better ways to implement the system were drawn based on the problems. To effectively manage the cost of public construction project, basically project cost should be estimated accurately in planning stage and managed based on it to have a project complete within the budget. In addition, the cost need to be managed in more systematic ways in terms of data collection and analysis, and the autonomy in managing the project cost given to the project owner needs to be expanded. Most of all, proper budget should be provided to prevent a project from delay through setting the priority of projects and proper budget allocation based on the priority.

인천국제공항철도 건설사업관리 수행체계

  • Yoon Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.13-18
    • /
    • 2003
  • 국내 건설프로젝트의 대부분은 설계, 시공, 운영이 별도의 체계로 운영이 되이온 경향이 많은 바, 이를 개선하기 위해선, 기획단계에서 운영단계에 이르는 건설생애주기 단계별로 수행업무절차를 체계적으로 정립하여야 한다. 본 고에서는 이를 위하여 인천국제공항철도사업을 모델로 바람직한 대형공사에서의 사업관리 수행체계에 대하여 알아보았다.

  • PDF

A Study on the Calculation of Organization Scale in Construction Management -Focusing on Building Construction- (건설사업관리(CM) 관리인력 규모산정을 위한 사례연구 - 공공공사 건축공사 사례를 중심으로 -)

  • Ahn, Sang-Hyun;Kim, Jin-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.65-72
    • /
    • 2013
  • While growth of domestic CM market has slowed down due to economic recession, it recently shows sign of scale as some public agencies are relocating their headquarters. Since the introduction of CM system, a number of client organizations have acquired construction project management capabilities, however, sufficient efforts are not made to estimate the size of construction project management organization. This study drew a method for estimating the size of the organization managing construction project by utilizing statics analysis and project costs per member based on 10 public construction projects and tried to review applicability through case studies. With this study, we would like to make a contribution to achieving smoother work performance and success of the construction project by estimating and allocating proper scale of management workforce.

A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.

  • PDF