A Study on the Proper Methodology for Selecting Domestic Public Sector Construction Management Contracts (국내 공공부문 CM의 평가 및 낙찰자 선정방법 개선안 연구)

  • Lee Yong-Jun;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.296-299
    • /
    • 2002
  • Construction Management tends to create a formal procurement resulted from recent legislative procedures system in domestic construction industry. However, the fact that construction Manager(CMr) has been chosen, in practice, under a poor circumstance in selecting and discriminating specialty requires the more optimal procedures. Therefore, in this research, we analyze the existing shortcomings. the various procedures, influence factors, and the criteria to be considered in selecting and evaluating CMr. Also. this study suggests the improved method based on the facts above. To accomplish the construction project successfully, it is one of the advanced schemes to choose an adequate CMr needed to the project through the precision in the formation and application of the procedure as well as the suggested criterion in selecting CM.

  • PDF

Improvement Direction for Construction CALS System considering Environmental Management (환경관리를 고려한 건설CALS시스템의 개선방향)

  • Jung, In-Su;Kim, Jin-Uk;Lee, Chan-Sik
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2008.06b
    • /
    • pp.469-472
    • /
    • 2008
  • 건설부문의 정보화를 위해 국토해양부는 건설CALS(Continuous Acquisition & Life-cycle Support)사업을 추진하고 있다. 건설CALS란 건설사업의 설계, 시공, 유지관리 등 전 과정의 생산정보를 발주자, 관련업체 등이 전산망을 통하여 교환 공유하기 위한 정보화 전략이다. 건설CALS사업은 시스템 개발 부문과 건설정보 표준화 부문으로 구분할 수 있는데, 개발된 시스템으로는 건설사업관리시스템(건설사용, 발주기관용), 시설물유지관리시스템, 건설인허가시스템, 용지보상시스템, 건설CALS포탈시스템 등이 있다. 건설CALS시스템에는 건설사업의 공정관리, 원가관리, 안전관리 등의 많은 기능이 있음에도 불구하고 최근 그 중요성이 부각되고 있는 환경관리 기능은 없는 실정이다. 본 논문에서는 건설CALS시스템의 현황을 분석하고 환경관리가 가능한 체크리스트와 매뉴얼을 개발하여 시스템으로 구현하기 위한 방향을 제시하고자 한다.

  • PDF

The Case of CM Type Supervision Apartment House Construction Work - Focused on the Case of Baekseok-Cheonan 2BL Construction Work - (공동주택건설공사의 CM형 책임감리 사례 - 천안백석 2BL 아파트건설공사 사례를 중심으로 -)

  • Lee, Kab-Weon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.41-48
    • /
    • 2004
  • The objective of the CM model projects is to achieve gradually the development of Domestic Construction, Industry with function, effects, problems and improvement which are the results after assessing tills finished project on the basis of CM Plan. The result is very useful of being activated CM and giving good orders continuously. Therefore this study describes work scope, organization, performance and management process for Baekseok-Cheonan 2BL project and picks out practical problems about CM and then suggests CM technical development directions and institutional improvements.

  • PDF

The Analysis of the Major Cost-increasing Risk Factors from the Perspective of Construction Management -Focusing on Pre-construction Phases- (건설사업관리자 관점에서의 주요 사업비 초과 리스크 요인 분석 -시공 전(前)단계를 중심으로-)

  • Kim, Byung-Yong;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.147-155
    • /
    • 2012
  • Recently, various construction projects are invested with plenty capital, manpower and resources. The advanced methods of the construction management is introduced to Korea. However, the cases which get involved in excessive cost frequently occur. We can explain it means that the cost management in the entire phases and the risk factors in its works has not been done yet as expected. Thus, it is necessary to unearth risk factors relative to cost management and analyse them for preventing cost-increasing and the success of projects. In this point of view, this study aims to identify the risk factors of the cost management focused on pre-construction stages from the perspective of construction management which is possible to take part in the whole phases and works in cost management. Also, the impact priority and grade of risk factors to cost-increasing are evaluated by using FMEA.

Characteristics of the Duty of care of a Good Manager according to the Construction Manager's Task (건설사업관리자의 수행업무에 따른 선관주의의무 특성)

  • Chung, Young-Ho;Lee, Sang-Beom;Park, Hyun-Jung;Cho, Hyeong-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.36-43
    • /
    • 2012
  • When the construction management method was introduced, there were arguments regarding the contractual responsibility of the construction manager. Accordingly, the provisions on damage compensation in the Construction Technology Management Act were revised in 2002, and the obligatory duty of care of a good manager is now required by the Framework Act on the Construction Industry. Even though the construction manager has a responsibility of a consultant in the CM-for-fee contract, however, the Korean construction environment does not clearly specify the consultant's scope of responsibility. In this study, the theory about the duty of care, which is a consultant's responsibility among the expert's responsibilities, was arranged. Based on the responsibilities of experts such as lawyers, the duties of care of a good manager of the construction manager were presented to provide the foundation for establishing the construction manager's responsibilities. To verify the resulting items, interviews with experts were performed to assess their importance levels.

Introduction to CM Experience from Incheon International Airport (IIA) Construction Project (인천국제공항건설 사업관리 경험)

  • Park, Dae-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.20-25
    • /
    • 2004
  • On July $18^{th}$, 2003, Incheon International Airport Corporation(lIAC) signed the Construction Management Service Contract with KIDS consortium (composed of Kun-Won Eng., ITM Corp, Do-Hwa Eng, Space Croup) for the $2^{nd}$ phase construction protect consists of landfill, $\#3$ runway, remote Concourse, IAT, BHS, cargo terminal, etc scheduled to be finished by the end of 2008. KIDS dispatched qualified engineers to the Construction Management Division of IIAC for providing technical assistance to IIAC members to pursue project goals in tulle. within budget with appropriate quality level to build one of leading hul] airports for the Northeast Asia legion in the $21^{st}$ century. The work scope covers upgrading various project procedures and related computer programs, cost and schedule control, design supervision for building design including support systerns such as HVAC, fire protection, elevators and escalators, boarding bridges, electrical and communication systems, and technical support for IAT/BHS, QA/QC, field test and inspection, start-up and commissioning, etc. The purpose of this paper is to introduce the major activities of the Construction Management Services performing at the IIA project for your reference.

  • PDF

A Study on CM Process Model for Reconstuction Project (주택 재건축 정비사업의 건설사업관리(CM) 적용 모델 구축)

  • Ahn, Kyung-Hwan;Cha, Woo-Chul;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.295-298
    • /
    • 2007
  • Recently, various problems have been occurred in Apartment reconstruction process. Such as, delaying schedule, additional cost increasing, etc. Those were caused by decision making which is lack of professionality in early phase of reconstruction process. Therefore, in this study proposed improvement plan by application of project management and construction management process in Apartment reconstruction project.

  • PDF