• Title/Summary/Keyword: 건설사업관리

Search Result 1,845, Processing Time 0.031 seconds

The Investigation and Performance Assessment of the Design-Build Projects in Korea (국내 턴키/대안공사 실태조사를 통한 턴키/대안 입찰제도의 성과 분석)

  • Kim Sun-Hee;Kim Du Yeon;Park Sang Hyuk;Yeom Sang Min;Chae Myung Jin;Han Seung Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.462-467
    • /
    • 2004
  • Design-build, which is defined as single source responsibility for design and construction, has been widely used in large public works since governmental formulation of measure for encouraging use of design-build in 1996. However, civic groups and small and medium sized enterprises are highlighting over-competition and unbalanced market shares of conglomerate in domestic design-bid market and insisting on decrease in the use of design-build and absorption into the lowest-price bidding. This study collected information about cost, schedule, quality, new technology adoption from 51 civil design-build projects and measured their performance.

  • PDF

A Decision Making Method between Reconstruction & Remodeling for Improvement of the Apartment Housing (공동주택 개량을 위한 재건축과 리모델링의 사업 추진 결정 방법)

  • Kim Hyung-Man;Yoon Suk-Ho;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.476-479
    • /
    • 2004
  • In the process of industrialization of our country in 1970's, Korea's housing strategy has focused on housing supply. Rapid completion and supply of apartment house buildings have caused a problem of their early deterioration due to their poor quality. In 1987 Housing Construction Promotion Act, therefore, included new regulations on housing re-construction. In July 2001, other new regulations on remodeling apartment buildings were also included in the Act. Reconstruction and remodeling have been considered to deal with such problems. This study suggests an appraisal criteria if they can select reconstruction or remodeling method in conducting their apartment building project. At first, evaluation items should be selected by the criteria of function31ity and economical efficiency. Second, the selected item is screened by AHP and multi-criteria decision-making methods. The result of study shows that the owners of apartment units will be able to select reasonable alternatives through the suggested appraisal method

  • PDF

A Study on modular construction method in military facilities (모듈러 공법을 적용한 군시설공사의 개선방안에 관한 연구)

  • Park, Jae-Sig;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.642-647
    • /
    • 2006
  • Recently Ministry of National Defense is reconstructing old facilities using modular construction method for enhancing soldiers' quality of living. In the future, the use of modular construction method is expected to be increased. But in beginning stage as ROK military facilities that was built by modular was not designed and constructed efficiently, problems for pilot projects need to be analyzed by phases and construction methods should be improved. For the maximized efficiency, design should be made to minimize on-site works, factory automation in an assembly plant should be installed for the better productivity, roads that will be used for transportation should be checked, and joint and connection methods between modules in on-site assembly should be improved for a better quality.

  • PDF

Developing Aged-Housing Remodeling Technology for Improving Structural and Equipment Performance;Introduction of Center for Aged-housing Remodeling Technology (노후 공동주택 구조 및 설비성능개선 기술 개발;연구단 소개)

  • Han, Ju-Yeoun;Cha, Hee-Sung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.233-239
    • /
    • 2006
  • As the number of aged-housing has been rapidly increased, many kinds of defects and problems such as degeneration of housing environment, structural performance, and equipment performance have been appeared. The reconstruction as the way to improve the aged-housing has been used mostly because the legal process of the reconstruction is relatively easy. On the other hand, it has caused problems such as the lack of natural aggregate, the environmental damages owing to construction wastes, the loss of national resources, and the lack of the housing for rent nearby the reconstruction area. This problems limit active tying into the reconstruction business at present in the industrial and political perspective. In this context, it is required to revitalize the remodeling rather than the reconstruction. In order to reach this objective, this research aims at identifying the user-oriented performance for the housing industry and developing the new technologies. It is expected that the result of this research can contribute to more revitalize the remodeling as tying researches in terms of design, structure, equipment, and construction.

  • PDF

Development of Approximate Cost Estimation System Based on CBRT echnique; Applicability Study for Landfarming Soil Remedation Technology (사례기반추론을 이용한 개략비용 예측시스템 개발 - 토양경작법 정화비용사례를 중심으로 적용가능성 검토 -)

  • Kim, Sang-Tae;Shim, Jin-Ah;Kim, Heung-Rae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.3-9
    • /
    • 2016
  • This study proposes a approximate cost estimation system based on Excel with VBA using weighted CBR(Case Based Reasoning). One characteristic of this system is that it generates the sheet automatically as many as the number of similar case and new estimation when it performs a case learning and a new estimate and cell formula is automatically entered into each sheet. User can be free to compose a combination of attribute factors because they can select up to ten attribute factors. This paper presents an applicability of estimation model for estimating the soil remediation cost when it use a landfarming method. When compared to a estimation model by using average unit cost and optimum multiple regression, this model shows a better result. This study was aimed at landfarming method, but it is expected that a cost estimation model using CBR will be more likely to apply in soil remediation technologies which various remediation technologies and pollutant species exist.

A Dynamic Approach for Evaluating the Validity of Boosting Pocliies for Green Standard for Energy and Environmental Design Certification (시스템 다이내믹스를 이용한 녹색건축인증제도 활성화 정책의 실효성 평가)

  • Kim, Jung-Hwa;Lee, Hyun-Soo;Park, Moonseo;Lee, Seulbi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.28-39
    • /
    • 2016
  • Since 2002, Korea Government has introduced Green Standard for Energy and Environmental Design Certification for reducing GHG emission in building area. However, total number of G-SEED Certification is only around 1% of total number of approved apartment buildings despite the various boosting policies. In this situation, most boosting policies and policy improvement researches are leaning toward the supplier's aspect. However, comprehensive relation and dynamics between consumer and supplier has to be considered because housing market is operated by market participants' mutual interaction. Therefore, this research presents system dynamics models based on decision making analysis of consumer and supplier in G-SEED Certification apartment building market. Then, this research evaluate the validity of boosting policies using the model. The proposed analysis can assist government to make next G-SEED Certification boosting policy.

A Study on the Estimation of Remodeling Method by Focused on Apartment House User's Request (공동주택 사용자 중심의 리모델링 방법 평가에 관한 연구)

  • Yoo, In-Geun;Kim, Chun-Hag;Yoon, Yer-Wan;Yang, Keek-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.211-222
    • /
    • 2004
  • Lately construction industry tends to prefer remodeling of existing buildings rather than new construction or reconstruction of buildings due to strengthening of several restriction related to real estates along with prolonged depression. And also, remodeling of building costs less and creates less wastes compared to reconstruction and so it is more profitable in financial and environmental view. However remodeling is process of creating new environment with existing building. Therefor remodeling must follow the procedure realizing problem and fix the problem based on through investigation on existing building and users requirement must be faithfully reflected. Specially in case of apartment houses, since vagueness on ownership and management authority on common parts exists. Hereupon, in this study we are to present the procedure of analyzing apartment house remodeling method through user requirement by approaching to several considerable factors in user request side.

Economic Analysis for Warehouse Rental Using Underground Parking Lots Extra Storage Room of Rental Office (임대오피스 지하주차장 여유공간을 활용한 임대창고의 경제성 분석)

  • Lee, Hwan-Cheol;Song, Byung-Doo;Hong, Tae-Hoon;Hyun, Chang-Taek;Moon, Hyun-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.877-882
    • /
    • 2008
  • The column gap of underground parking lots of office considering a business background and effective parking divisions is planned. A parking plan by column gap of fixed forms in atypical underground parking lots makes much extra storage rooms. Most of the edge of the parking lots are used for fan room. Part of the edge are located at parking ramps. Also warehouses are located in extra storage rooms. In this study compare study economical efficiency between life cycle costs and leases earnings. Consequently, It is proved that the warehouse rental is efficient because of lease earning guaranted years.

  • PDF

Estimating Construction Cost for Small-Sized Apartment Unit (소형공동주택의 적정건축비 추정방안 연구)

  • Lee, Yoo-Seob;Kang, Tae-Kyung;Cho, Hun-Hee;Huh, Young-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.94-104
    • /
    • 2006
  • The changed Korean government law associated with the public apartment housing supply, so called the $^{\circ}{\AE}$Apartment Sales Price $Cap^{\circ}{\phi}$, requires new system for estimating construction cost in order to set appropriate price. A model apartment project was carefully designed and its construction cost were analyzed in many different ways. Based on the analyses outcomes, 1,028,000 Won/m2 (excluding cost for underground parking lot) is the most appropriate Price Cap for a smaller than $85{\beta}{\geq}$ apartment unit. Further, it was revealed that the price have to be adjusted reflecting such factors as underground size; structural system; external complex quality; and consumer preferences. Findings from this study will enable the Korean government to realize faster and better application of the related laws. The methodology for obtaining appropriate apartment construction cost will also benefit for future researchers.

A Study on the Model of Artificial Neural Network for Construction Cost Estimation of Educational Facilities at Conceptual Stage (교육시설의 개념단계 공사비예측을 위한 인공신경망모델 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Chung-Yung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.91-99
    • /
    • 2006
  • The purpose of this study is propose an Artificial Neural Network(ANN) model for the construction estimate of the public educational facility at conceptual stage. The current method for the preliminary cost estimate of the public educational facility uses a single-parameter which is based on basic criteria such as a gross floor area. However, its accuracy is low due to the nature of the method. When the difference between the conceptual estimate and detailed estimate is huge, the project has to be modified to meet the established budget. Thus, the ANN model is developed by using multi-parameters in order to estimate the project budget cost more accurately. The result of the research shows 6.82% of the testing error rates when the developed model was tested. The error rates and the error range of the developed model are smaller than those of the general preliminary estimating model at conceptual stage. Since the proposed ANN model was trained using the detailed estimate information of the past 5 years' school construction data, it is expected to forecast the school project cost accurately.