• 제목/요약/키워드: 건설사업관리 적용

검색결과 584건 처리시간 0.025초

A Case Study of the Construction Project Management Applied to New Catholic Medical Center Construction Project ('가톨릭중앙의료원 새병원 및 성의회관 건립공사'CM수행사례 소개)

  • Kim, Hyo-Seong;Park, Young-Soon;Kim, Chan-Joong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.37-44
    • /
    • 2006
  • The construction management has been applied for the first time in South Korea on the New Catholic Medical Center. The construction of the project has been controlled and managed by the CMr, as Client's agent from the very beginning stage of construction when the block plan is being established by the Contractor's design consultant. As CMr generally gets involved in the project throughout the entire construction phases on behalf of the Client, Parsons Brinckerhoff has been delivering high quality solutions that satisfy the Client's requirements in Pre-construction stage and also brought practical and innovative engineering solutions in a time and cost effective method. The objective of this case study is to describe works executed by CMr in Pre-construction stage ; and, analyze the positive effects by applying CM to the project. Therefore, it is anticipated that CM procedure might be introduced and adapted to the up-coming hospital construction projects.

  • PDF

The Improvement Plan of Project Delivery Systems in the Public Construction Projects (공공건설사업의 발주방식 개선방안)

  • Choi, Eun-A;Kim, Hyun;Park, Sung-Yong;Cho, Hyeong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.509-512
    • /
    • 2008
  • Clients demands have been changed by construction circumstances such as high-technology, mega-projects, and the complexity of construction. Advanced foreign countries have already introduced and applied new project delivery systems(i.e, CM, DB, etc.) to deal with the change of such that. Recently, Korea also launched two new project delivery systems, "Best Value Contracts to which the State is a Party" to provoke the project delivery system, which helps a public owner select a project delivery system appropriate to the project characteristics. Even though government has made his efforts as stated above, some clients have still used those to public construction projects uniformly. That is because there are not a selection criteria of project delivery system for clients. Therefore, this paper proposes the selection criteria of project delivery system based on project types in the public large construction projects.

  • PDF

Integrated Project Delivery in the Pre-construction Phase : Case Study of IPD for Lean Construction (사례 연구를 통한 Pre-con 단계의 린 건설 기반 IPD 프로젝트 적용 방안 도출)

  • Jang, Hanbyeol;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • 제20권6호
    • /
    • pp.11-22
    • /
    • 2019
  • Current construction project processes pose difficulties for construction management as inefficient communication between project participants seldom accurately reflects the needs of the owner. To solve this problem, lean construction-based Integrated Project Delivery (IPD), which facilitates cooperation and builds trust through the formation of horizontal relationships among participants, is becoming increasingly popular. However, although lean construction-based IPD improves productivity in the construction industry, few studies have focused specifically on developing effective methods that maximize the benefits gained from lean construction-based IPD. This study therefore analyzed success factors for lean construction-based IPD projects by analyzing prior studies to identify factors that support IPD success. Application methods were analyzed and an example of how they are actually used in the field was examined through an in-depth single case analysis. The findings of this research can be applied to support lean construction-based IPD projects in Korea, improving their efficiency and boosting owner satisfaction.

A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK - (성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 -)

  • Kang, Sinbong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • 제17권1호
    • /
    • pp.48-55
    • /
    • 2016
  • Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.

A Text Mining Analysis for Research Trend about Information and Communication Technology in Construction Automation (텍스트마이닝 기법을 활용한 정보통신기술 기반 건설자동화 연구동향 분석)

  • Lim, Si Yeong;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • 제17권6호
    • /
    • pp.13-23
    • /
    • 2016
  • Construction automation based on information and communication technology(ICT) has been studied for improving productivity in the construction industry. This study investigates domestic research trends in ICT-based construction automation using text mining techniques. The results show that 'Technology to collect and analyze project progress(26%)' and 'Technology to analyze and apply the automation element of construction machinery(28%)' are the major research area. The word of 'construction information' is showed as important keywords in the area of 'Technology to collect and analyze project progress', and researches focusing on resource management, site management, information management, and real-time information monitoring have been mainly conducted. The word of 'ubiquitous' is shown as important keywords in the area of 'Technology to analyze and apply the automation element of construction machinery', and researches focusing on ubiquitous information management, ubiquitous site management, and measurement system have been mainly conducted.

Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects (EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발)

  • Kim, Donghee;Ha, Minhui;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • 제21권3호
    • /
    • pp.76-84
    • /
    • 2020
  • The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.

A Study of Considerations and Way to promote Enterprise Risk Management in Construction Company (건설기업의 전사적 리스크 관리 체계 적용을 위한 고려 사항 및 추진 방안에 대한 연구)

  • Kim, Seung-Won;Lee, Jae-Ho;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.539-544
    • /
    • 2007
  • Owing to diversification of social desire and increase of demand as economic growth, construction industry recently is trending toward diversification, complication, gigantism. It means that is changing to difficult environment as existing construction company operation. Specially, some big construction companies are promoting get down to construction business risk management skill & development. Enterprise risk management system, recognized to risk portfolio, is suggested. instead of individually risk management. This study indicates ERM basic model, considering construction risk character, for apply to ERM to field of construction . And it is including analysis of recognition level and reality about ERM in construction company.

  • PDF

Commissioning Model for CM Services Considering Project and owner Properties (프로젝트 및 발주자 특성을 고려한 CM업무 위탁모델)

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.632-636
    • /
    • 2007
  • These days, Construction industries are getting bigger, more specialized and complicated. Accordingly, the items of management is increased, also owner's organization is reduced. For this reason, various a method of construction management is introduced in the domestic construction industry. But introduction of construction management have caused increase cost because role duplication of managers. This role duplication is caused by confusion of trial and error, irrationality of system. And every construction project have peculiar properties, also owner's organization of project have various properties. This various properties is not reflected in the construction management , and the regimental method of construction management applied. In order to solving these problems, this study suggested the commissioning model for CM service reflected the properties of project and owner. This study have to selection of the critical service, service item of construction management and definition of owner's role through analysis of the properties of project, owner's capacity and requirement.

  • PDF

Framework and Core Competency of Integrated Design Management (IDM) (통합설계관리의 개념적 틀 및 역량강화 요소 - 건축과 플랜트를 중심으로 -)

  • Kim, Yesol;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • 제15권1호
    • /
    • pp.122-133
    • /
    • 2014
  • Recent diversification of project delivery systems coupled with increasing mega-projects requires highly advanced construction management techniques. Among those techniques, procurement and design management are recognized as being the first priority for overseas construction projects. Nevertheless, previous research in design management has been limited to the quality management of the design documents at design stage. Therefore, it is necessary to explore the design management from a comprehensive perspective throughout the project life cycle. In this context, the purpose of this paper is to propose a conceptual framework for integrated design management (IDM). Several different concepts in relation to design management were investigated first in order to identify the major variables of the IDM framework. A comprehensive comparison of construction management methodologies was also analyzed in order to identify key factors of IDM. Finally, an IDM framework was proposed by combining those factors and relevant issues. Based on the proposed framework, a survey was conducted in order to validate the framework as well as to identity important areas for improving competitive capability of Korean construction companies.

A Site Application verification of technology and Equipment for Construction Application of Construction CALS System (건설 CALS 시스템 건설공사 활용을 위한 요소기술 및 장비의 현장 적용성 검증)

  • Choi, Sang-Yong;Shin, Tae-Hong;Kim, Byung-Kon;Kim, Tea-Hak;Kwon, Soon-Wook;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.767-771
    • /
    • 2008
  • From industrial field spearhead IT and new create an added value and market with fusion of traditional industry composition researches actively to be in the process of advancing. The application possibility of high-tech IT technique is coming to be high in construction industry. Currently, the user requirements that upgrade existing system to high-tech construction project information system combined construction CALS system applying in road/river business management service with high-tech IT such as ubiquitous and mobile techniques are increasing. Therefore, the objective of this study is to verify site application of RFID and mobile equipment for applying in high-tech field with ubiquitous and mobile techniques so that construction CALS system gets advanced increasingly.

  • PDF