• Title/Summary/Keyword: 건설사업관리 적용

Search Result 584, Processing Time 0.026 seconds

Satisfaction Level and Performance Evaluation for CM Service in Korea (국내 건설사업관리 업무만족도 및 성과평가)

  • Kim, Won-Tae;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.108-117
    • /
    • 2013
  • The domestic CM business market has continued to grow, but its size is relatively small yet in comparison with the total size of the domestic construction industry. Evaluation of CM projects was conducted through questionnaire surveys. Both clients and CM firms showed positive satisfaction levels. Nevertheless, the clients' satisfaction levels were relatively low in safety management, cost management, and document and information management. Superior areas of CM tasks were time management and recovery scheduling, quality control and technical instruction, and design value engineering. On the other hand, inferior areas of CM tasks were claim analysis and dispute resolution, cost estimation, and life cycle costing. Both entities have agreed with the positive effects of CM involvement in terms of cost saving, time reduction, quality improvement, and safety incidents prevention to at least 0~5% extent.

Development of Information Management Model for Construction Electronic Manual using Collective Intelligence (집단지성을 활용한 건설 전자매뉴얼의 정보 관리 모델 구축)

  • Park, Moon-Seo;Kim, Jung-Seok;Yu, Jung-Ho;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.62-72
    • /
    • 2011
  • As the construction industry is becoming large and complex, it is difficult to understand the overall business workflow and provide the required information. Accordingly, researches on the introduction of Interactive Electronic Technical Manual (IETM), used in manufacturing/maintenance industry, is being carried. In the case of construction projects, Frequent changes of relevant information occur according to changes in the project environments, so it is difficult for administrators to gather and organize the information. Therefore, this research suggests the Information Management Model for Construction Electronic Manual using Collective Intelligence to support the information changes, by expand the information mangers from the system administrators to the whole users and verify the model by applying the model to Urban Regeneration Electronic Manual.

Analysis and Improving Strategies on Construction Management(CM) Service Adoption in Public Sector Construction (공공부문 건설사업관리(CM)적용 실태 및 개선에 관한 연구)

  • Kim, Jae-Jun;Moon, Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.119-127
    • /
    • 2006
  • On December, 1996, the Ministry of Construction and Transportation published Construction Management Service in Construction Industry Basic Act. CM service has been adopted in Korean construction market for ten years by now, however there was no significant change in the construction industry from adoption of CM service. The CM service results aggregated by PCM, from 1997 to 2004, show that CM service adopted projects were 324 in total and the total contract amount was 260million US dollars. These results tell us that adoption of CM service in Korean construction industry is not successful. The research is to survey the factors and the limitations affecting on poor adoption of CM service and to propose the improving strategies on that matter. Therefore, this paper analyzes former papers, laws and regulations on CM and CM service results from PCM as well. From the analysis, we found conflicts in between the laws such as different rules on same matter or missing significant policies in their provisions. Also, problems of industrial organization was found such that the public sector seldom adopts CM service due to their embeded CM function.

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

A Development of the Design modification function for road construction project Cost management (도로분야 공사비정보 관리를 위한 설계변경 기능 개발)

  • Moon, Jin-Seok;Yoon, Hoi-Su;Kim, Sung-Jin;Han, Choong-Han
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2012.06b
    • /
    • pp.16-17
    • /
    • 2012
  • 국토해양부는 지방국토관리청의 도로공사와 관련하여 발생하는 공사비 정보의 교환 및 공유를 목적으로 작업분류체계 기반의 공사비 관리 항목을 추가하여 전자설계도서 작성 납품 지침을 개정하였다. 이를 반영하고 문제점 개선 및 활성화를 위하여 5개 지방국토관리청에서 관리중인 10개 도로건설공사를 시범적용 사업으로 지정하여 발생하는 공사비 정보를 디지털 수량산출정보로 관리하고 있다. 시범사업을 진행하면서 건설공사에 발생하는 설계변경 업무를 전자화하여 관리하는 기능을 개발하고 추가 적용하였다. 이를 통해 건설사에서 생성한 설계변경 정보를 건설사와 발주처가 동일한 형태로 공사비 정보를 공유 및 관리 가능하도록 하였다.

A Study of the Risk Analysis Technique Optimization in the Pre-Project Evaluation Phase of the Development Projects (개발사업 사전평가단계에 적용하는 위험분석기법 최적화 연구)

  • Kim, Han;Kim, Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.517-520
    • /
    • 2008
  • The city refreshing development projects in the domestic recently have been performed under leading of public institution laying stress on new city and existing urban district. These development projects are still staying in safety control level despite risk factor management at preliminary estimation stage has been more important factor to success and add value creation. Understanding inaccurately about various risk analysis techniques that can analyze risk factors and the insufficient application of step that can analysis technique s could make projects more difficult. Therefore, this research suggests the more effective methods for risk analysis that can control the risks in the pre-project evaluation stage.

  • PDF

The necessity of Program Management in Urban Regeneration (도시재생사업에서 종합사업관리의 필요성)

  • Kwon, Hae-Rim;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.583-586
    • /
    • 2008
  • As We experienced the onrush of industrialization, unplanned cities that had been grown rapidly are declining. The Urban Redevelopment is an alternative which is physical and functional improvement of declined cities. It has many types of undertaking by related law in Korea. But this undertaking has a problem. Whole designated district is separated several zones. And these zones are managed individually Therefore it has a difficulty to achieve overall goal of the urban redevelopment. The Urban Redevelopment should be managed over all. So we suggest application possibility of Program Management in Urban Redevelopment.

  • PDF