A Study on the Selection Method of Construction Management based on Public Construction Projects (공공건설사업의 건설사업관리방식 선정 방법에 관한 연구)

  • Kim, Kwan-Su;Park, Hyung-Keun;Son, Bo-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.65-73
    • /
    • 2013
  • Even though the construction management (CM) system was introduced for the purpose of increasing the efficiency of the domestic construction industry along with the establishment of construction industry fundamental laws in December of 1996, now it is very difficult that the public institutions can judge their application of construction management methods due to the lack of clear guidelines or directions to select construction management methods when the public institutions were executing public construction projects. Therefore, this study was executed to prepare for the selection criteria which could be referred in reviewing the application of construction management ordering methods according to public institution's competences and project characteristics. It is expected that future domestic demand of construction management will be gradually increasing both in public and private construction sectors. However under the current construction management systems, it is judged to be difficult that the construction projects that apply the construction management methods will be activated with full-scale. Therefore, it could be said that active efforts in domestic sectors are required in order that the construction management systems of developed countries levels could be activated. Additionally in order to vitalize the construction management systems, it is expected that public institutions could use this study results as the review data for feasibility of construction projects for the consignment of construction management in selecting the ordering methods.

A Study on the Application of Construction Management Delivery System by Characteristics of Facility (건설사업관리 발주방식의 시설물 특성에 따른 적용방안에 관한 연구)

  • Gee, Hyoung-Kwon;Kang, Hyun-Wook;No, Jae-Deuk;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.449-454
    • /
    • 2008
  • The purpose of this study is to analyze, applications of the construction management delivery systems according to characteristics of facilities. The adapted research method is to selected four mall in the capital region and then divided them into two groups: CM for Fee or CM at Risk. After analyze each applications and administrations, it could propose proper applications of CM for fee according to CM at Risk. The results of this study are as follows: 1) the CM for Fee was suitable for the projects focused on completing on time and constructing the effective business plan of quality control, and 2) the CM at Risk was suitable for the projects concentrated on the cost reduction through shorten the construction time and the related businesses on quality control.

  • PDF

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

A Study on CM Process Model for Reconstuction Project (주택 재건축 정비사업의 건설사업관리(CM) 적용 모델 구축)

  • Ahn, Kyung-Hwan;Cha, Woo-Chul;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.295-298
    • /
    • 2007
  • Recently, various problems have been occurred in Apartment reconstruction process. Such as, delaying schedule, additional cost increasing, etc. Those were caused by decision making which is lack of professionality in early phase of reconstruction process. Therefore, in this study proposed improvement plan by application of project management and construction management process in Apartment reconstruction project.

  • PDF

A Study on the status and improvement of construction management in Project Finance Business of Asan Baibang public combination (아산배방 복합단지개발 PF사업의 CM적용 사례와 향후 발전방향에 관한 연구)

  • Kim, Jong-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.19-24
    • /
    • 2008
  • The Construction Management for the Asan Baebang Complex Development PF Project is aiming the solution for the needs of specialized organization and management for the construction of the project, as a independent representative managing the whole process of the super high rise and huge volume of complex project. This case shall be counted as a remarkable one in the point of view that the CM was decided to be encountered even in this consortium project made between the private firm and government, and shows that the project can be executed successfully without having its own organization of a huge number of staffs. This study is for the Construction Management applied for the consortium project between the private firm and government and it is my pleasure if this study could be a help to encourage CM for wide applying in the field by reviewing of its necessity and analyzing of its effect and advantage.

  • PDF

사업관리 절차서 개선 효율화 방안

  • Yun, Jae-Ho
    • Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.58-64
    • /
    • 2003
  • 건설 프로젝트를 수행함에 있어서 사업관리운영 절차서는 매우 중요하다. 국내에서는 일부 대형 공공 사업을 제외하고 프로젝트의 특성에 맞는 절차서를 개발하여 적용한 예는 드물다. 이러한 점을고려하여 현재 공사가 진행죽인 대표적인 국내민간자본 SOC사업을 표본으로 삼아 절차서의 활용현황을 검토분석하고 그에 따른 효율화 방안을 구하여 보았다. 이를 위해서 사업수행주체인 발주자, 사업관리자, 감리자, 설계자, 시공계약자 등을 대상으로 현재 보유/사용하고 있는 절차서에 대한 이해도, 사업관리지식체별 업무절차에 대한 이해도를 설문조사하였다. 설문조사의 분석결과를 토대로 건설사업관리수행상 업무수행절차의 전반적인 이행실태를 점검하여 문제점을 도출함으로서 향후 사업관리운영절차서의 체계적인 개발을 위한 추진방향을 설정하고 사업관리전반에 대한 인식제고와 효율적인 사업관리체계의 적용방안을 모색하여 제시하였다.

Study on the daily schedule after works analysis of process (건설공사의 사업 분석에 따른 일정계획)

  • Chun, Jin-Ku;Lim, Jong-Ah;Park, Young-Dae;Kim, Byeong-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.418-421
    • /
    • 2006
  • 오늘날의 건설사업 환경은 차별화 ${\cdot}$ 정보화 ${\cdot}$ 특성화 ${\cdot}$ R&D등 지식과 기술 및 창의성을 바탕으로 한 창조적 결과물 생산으로의 요구를 확대하고 있다. 이러한 환경은 건설 사업을 수행하는 기술자 집단에게 사업수행의 미래 가치적 최적화를 위해 기획과 계획에서부터 시공과 유지관리 및 장기 지속가능성까지 보장하는 생애주기차원의 사업수행을 요구하는 것이기 때문에 사업의 타당성 분석에서부터 실시간 정보처리와 가치창조를 위한 사업수행 계획이 절대적이라 할 수 있다. 본 연구에서는 그동안 국내 사업일정계획에서 적용하고 있거나 적용할 필요성이 있는 사업단계와 단계별 업무영역을 구분하고, 정보화 운영관리 방안을 분석함으로서 국내 건설 환경에 적합하고 신뢰성을 보장 할 수 있는 일정계획을 수립할 수 있는 방향을 제시하고자 한다.

  • PDF

A study on the status and improvement of construction management in Gwangjin-Gu Culture & Sports Center (광진구민회관의 건설사업관리 적용현황과 개선방향에 관한 연구)

  • Jung Jae-Jin;Yoo Byeong-Gi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.32-39
    • /
    • 2003
  • Owners, local autonumous entities, have a burden on operating project for the lack of their management capacity such as specialty and human resources. In this reason, they want to perform project with CM methods. But there have been only a few case of CM operation and application in a huge construction project. The complex formations of CM and responsible management are used in those project. This situation originates in the lack of CM specialist. Because the CM service used in those case is generally performed as the mixture of responsible management service and design management service, it is not the prototype of CM. The purposes of this study are to present the solutions to the problems concerned with the design development phase management, design phase VE, the application of Fast-Track, PMIS operation and CM execution, etc, and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Gwangjin-Gu Culture & Sports Center.

  • PDF

The Construction Management Plan of Dong Myoung Service Area (동명휴게소 건설사업관리 수행계획)

  • In Chi-Sung;Kim Jeong-Won;Jung Soon-Gil;Park Gwon-su;Lee Sung-Gak;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.40-47
    • /
    • 2003
  • The main purpose of Construction Management(CM) is the improvement of efficiency and effectiveness of the project with construction methodologies systematically and technically. This pilot project Dong Myeong Service Area and Gas Station project among 5 projects designated and supervised by Ministry of Construction and transportation(MOCT), is to reduce cost, to maintain and control schedule, to keep proper quality, Claim and Risk through Partnering, Design Review, Constructability, Value Engineering and Project Management Information System(PMIS) and so on. Major factors of CM Plan are introduction of the phased and classified Construction Management Services from initiation of project to completion and adaptation of CM technologies and guide the implementation methodologies of the CM Pilot Project in CM construction market.

  • PDF