A Study on Practical Ways to Improve Pricing Criteria for Technical Service Contracts (기술용역 대가기준의 문제점 및 개선방안)

  • Lee, Taewon;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.33-43
    • /
    • 2014
  • Goods, services and construction works needed by central government entities, local government entities, and other public institutions are procured with national budget. For efficient budget execution, Article 9 Paragraph 1 of the Enforcement Decree of the Act on Contracts to Which the State is a Party (hereinafter "State Contract Act") provides for the criteria for determining estimated price. Sub-paragraph 2 of the paragraph provides for the "determination of estimated price by cost calculation". On this legal basis, pricing criteria for the determination of estimated price, based on the project purpose, are announced by responsible authorities. This study analyzes the pricing criteria for technology services and proposes a price calculation methodology that can ensure transparency, as a practical improvement for more rational and efficient budget execution in the public sector.

건설산업경쟁력 강화와 부실방지대책(안)

  • 한국주택협회
    • 주택과사람들
    • /
    • no.54 s.71
    • /
    • pp.185-206
    • /
    • 1996
  • 1.건설제도의 국제화와 경쟁기반 구축 $\bullet$건설산업을 기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$사후관리 등 전 분야에 걸쳐 경쟁력 있는 산업으로 육성-기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$유지관리 등 건설산업 전반에 관한 기본사항을 법제화-대규모 공사의 경우 발주자를 대신하여 건설공사의 기획$\cdot$설계$\cdot$발주$\cdot$감리$\cdot$시공관리 등 업무의 전부 또는 일부를 종합적으로 조정$\cdot$관리하는 $\lceil$건설사업관리$\rfloor$제도를 도입 $bullet$건설공사 $\lceil$현장실명제$\rfloor$도입을 통한 하도급제도의 정비-전문건설업자로부터 하도급, 위탁, 고용 등의 형태로 공사에 참여하는 현장근로자를 신고 받아 권익을 보호하고 시공책임도 부과하는 $\lceil$현장실명제$\rfloor$도입 $\bullet$공사완성보증제, 손해배상보증제도를 도입하고, 신용상태 $\cdot$시공능력에 따라 보증 요율 등을 차등화 하여 부실업체를 배제 $\bullet$건설공사관련 각종 계약서와 시방서 등 제기준을 정비하여 발주자$\cdot$시공자 등 건설주체간의 역할과 책임을 명확화$\bullet$건설분쟁을 신속하고 객관적으로 조정$\cdot$중재하기 위하여 $\lceil$건설분쟁중재원$\rfloor$으로 확대 개편 2. 건설인력의 육성과 고용안정$\bullet$경쟁력 제고의 관건인 우수인력 확보를 위하여 대학교육 제도의 개선을 포함한 건설 인력 수급대책을 추진 - 대학의 건설관련 학과 정원을 2000년까지 매년 일정규모로 증원하여 고급기술 인력을 배출 현재 50$\%$에 불과한 건설관련 국가기술자격자를 2000년에 70$\%$까지 제고 - 감리 등 전문인력을 양성하고, 선진외국 감리 회사를 활용하여 국내 업계와의 경쟁을 유도 $\bullet$건설현장의 최일선에서 품질을 담당하고 있는 건설기능공의 고용안정과 복지향상을 위한 획기적인 대책을 마련 - 건설기능공의 자긍심과 사회적 책임의식을 고취하기 위해 기능공이 여러 현장을 전전하여 근무하더라도 경력관리, 공제금 등의 합산 관리가 가능하도록 $\lceil$건설 근로자 복지카드$\rfloor$제도를 도입 *$\lceil$건실시연구단$\rfloor$을 구성$\cdot$구체적인 운영방안을 수립 - 건설 업체 실정에 맞는 현장위주의 기능검정제도 도입 $\cdot$자격증이 현장에서 요구되는 기능수준과 숙련도를 제대로 반영할 수 있도록 검정방법을 현장 실기위주로 개선하고 자격검정업무도 건설협회 등의 자격 검정능력을 향상시켜 위탁$\cdot$시행하는 방안을 검토 3. 공사시행기관의 전문성과 책임성 제고 $\bullet$시장이 개방되어 건설공사가 국제적인 관행에 따라 이루어질 것에 대비하여 시행기관에 계약$\cdot$공사관리 등 전문직공무원을 집중 교육하여 양성 $\bullet$ 조달청이 대행하여 공사계약을 하는 경우라도 설계변경은 발주기관이 자체적으로 할 수 있도록 허용 $\bullet$ 기술직 공무원의 기술향상을 위하여 관련 공무원의 확충, 해외연수, 현장교육 강화 등을 지속적으로 추진 $\bullet$ 충분한 사전조사를 거쳐 사업계획을 수립하도록 $\lceil$건설공사 시행절차$\rfloor$를 규정 $\bullet$ 공사기간 3년 이상의 공사에 대하여는 최대한 계속비사업으로 편성토록 계속비제도의 운영을 활성화 4. 건설현장의 품질관리체제 구축 $\bullet$ 현장배쳐플랜트 설치를 확대하여 레미콘의 품질관리를 일원화하고 현장에서 레이콘을 배합하는 건식공법을 채택 - 현장레미콘생산시설(B/P)설치 확대로 콘크리트 하자에 대한 책임한계 일원화 유도 - 레미콘 재료인 골재$\cdot$시멘트$\cdot$물을 공장에서 혼합하여 공급하는 현행 습식배합 대신에 물만을 현장에서 혼합하는 건식 배합방식을 도입 $\bullet$철강재$\cdot$철구조물의 품질을 보증하기 위하여 일정기술을 갖춘 공장에서만 제작토록 하는$\lceil$공장인증제$\rfloor$를 도입 - 제작시설과 품질관리 등을 심사하여 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 사후관리를 일괄 책임질 수 있도록 $\lceil$시공 및 유지관리 일괄계약제도$\rfloor$를 도입 - 대형교량$\cdot$소각로$\cdot$하수처리장 등 유지관리에 전문성이 요구되는 분야부터 시범적으로 도입 $\bullet$건설자재의 표준화$\cdot$정보화사업을 조속히 추진 5. 건설업체에 대한 지원 강화 $\bullet$일부 공공사업자의 경우 관행화되어 있는 대금일부의 어음 또는 채권지급방법을 단계적으로 축소 $\bullet$매월 감독이나 감리원의 기성확인에 의하여 시공자에게 공사대금을 직접 지급토록 하는 등 대금 지급절차를 간소화 6. 민간 건축물에 대한 안전확보 $\bullet$충실한 설계가 이루어지도록 제도를 개선 - 설계도서 작성기준을 제정하고 다중이용시설에 대하여는 건축심의단계에서 구조검토 등 설계심의를 의무화 $\bullet$대형다중이용시설에 대한 감리 강화 - 감리전문회사 수준의 감리체제로 전환하고 감리대가도 공공수준으로 인상하고 적용요율대로 지도$\cdot$감독 강화

  • PDF

The Study on the Project Delivery System for Vitalizing the Green Remodeling (그린리모델링 사업 활성화를 위한 발주방식 제안)

  • Nam, Sunghoon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.3-11
    • /
    • 2017
  • Aging buildings over 15 years reaches about 74% of 177 thousand buildings in Domestic public buildings. Due to the aging building, the energy loss is a serious problem. In order to reduce the energy usage through improving the energy efficiency on the existing buildings, the government & the local autonomous entity conduct the energy efficiency projects through the remodeling, repairing & equipment replacement on the existing buildings. The green remodeling is applied to the existing public buildings in recently revised the act on the creation and support of green building. However, the standard is not obvious that the work scope of green remodeling, financing and project delivery method. This paper propose is to suggest project delivery system for vitalizing the green remodeling. Green remodeling is defined on basis of the occurring work under project life cycle based on the existing building process and the financing method for owners and companies and the project delivery system according to work scope of green remodeling are proposed in this paper

A Study of the Influencing Factors for Decision Making on Construction Contract Types : Focused on DoD Construction Acquisitions with Firm Fixed Price and Cost Reimbursable in FAR (건설공사 대가지급방식의 의사결정 영향요인에 관한 연구 - 미국 연방조달규정에 따른 미국 국방성의 정액계약과 실비정산계약을 중심으로 -)

  • Son, Young-Hoon;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.23-35
    • /
    • 2024
  • This study analyzed the correlation between each of the 12 influencing factors in FAR 16.04 and the decision-making process for construction contract types, using data from a total of 2,406 DoD Construction Acquisitions spanning from 2008 to 2022. The study considered 12 independent variables, grouped into 4 Characteristics with 3 factors each. Meanwhile, all other contract types were categorized into two types: Firm-Fixed-Price (FFP) and Cost-Reimbursement Contract (CRC), which served as the dependent variables. The findings revealed that FFP contracts significantly dominated in terms of acquisition volume. In line with prevailing beliefs, logistic data analysis and Analytical Hierarchy Process (AHP) analysis of Relative Weights from Experts' Survey demonstrated that independent variables like Uncertainty of the Scope of Work and Complexity found out to be increasing the likelihood of selecting CRC. The number of contractors in the market does indeed influence the possibilities of contract decision-making between CRC and FFP. Meanwhile, the p-values of the top 3 influencing factors on CRC from the AHP analysis-namely, Appropriateness of CAS, Project Urgency, and Cost Analysis-exceeded 0.05 in the binominal regression results, rendering it inconclusive whether they significantly influenced the construction contract type decision, particularly with respect to payment methods. This outcome partly results from the fact that a majority of respondents possessed specific experiences related to the USFK relocation project. Furthermore, influencing factors in construction projects behave differently than common beliefs suggest. As a result, it is imperative to consider the 12 influencing factors categorized into 4 Characteristics areas before establishing acquisition strategies for targeted construction projects.

The Significance and Management of Hyporheic Zone (지표수-지하수 혼합대 의의와 관리 필요성)

  • Ko, Dongwoo;Lee, Namjoo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.283-283
    • /
    • 2021
  • 혼합대는 지표수와 지하수의 수리적 교환이 일어나는 경계부로써 1) 수문학적 관점에서는 하도와 하상간의 물교환이 이루어지는 공간으로 다양한 물리적·화학적 작용이 발생, 2) 생지화학적인 관점에서는 하상 간극수 흐름에 의한 전이대(ecotone)를 형성하여 용존산소·영양물질·용존유기탄소의 이동뿐만이 아니라 지하수로부터 열에너지·무기염류의 공급을 유도하면서 높은 생지화학적 활동과 변환을 야기하는 산화·환원 반응구역, 3) 생태적인 관점에서는 저서생물과 지하 유기체종을 특징으로 하는 서식지이나 잠재적인 레퓨지움(refugium) 등의 관점에서 해석될 수 있다. 국내 하천환경의 생태학적 지속가능성을 위한 지표수-지하수 혼합대 관리에 대한 중요성이 점차 증대되고 있지만 우리나라는 여전히 지하수의 이용 및 보전과 지하수의 안정적인 수량·수질 확보를 목표로 관리를 추진하고 있다. 따라서, 실질적인 지표수-지하수 혼합대에서 발생하는 다양한 현상의 이해나 관리방안에 관한 연구는 아직 미비한 상황이다. 지표수-지하수 혼합대에 관한 보고서, 논문 등을 종합하여 혼합대의 영향인자를 살펴보면 1) 수리수문 특성에는 수리전도도·하천 수위·하천 유속·하천수 수온, 2) 수질 특성에는 유기오염물질·영양염류, 3) 수생태 특성에는 대형무척추동물 등으로 분류할 수 있다. 지금까지 단일 연구분야의 접근방법으로 다양한 현장측정기법 및 모델링을 통한 혼합대 연구가 수행되고 있지만, 혼합대가 가지는 환경적 중요성에 대한 이해와 인식이 부족하고, 혼합대 내부에서 발생하는 복합적인 프로세스로 인해 전문가들조차 연구에 어려움을 가질 것이다. 지표수-지하수 혼합대의 효율적인 관리를 위해서는 수리수문·수질·수생태 등 다양한 시각에서 접근하여 학제간 융합연구를 통해 기초 데이터를 상호교환하고, 기존의 혼합대 조사에 부족한 부분을 해결할 필요가 있다. 향후 하천 기저유출 및 혼합대 기초자료 구축, 혼합대 흐름 정량화, 하천복원사업에 의한 혼합대 영향 규명 등의 연구를 수행함으로써 혼합대를 체계적으로 관리할 수 있는 기술 방안을 제시할 필요가 있다.

  • PDF

Measurement of Nondestructive Residual Stress by Acoustoelasticity (음탄성에 의한 비파괴적 잔류응력 측정)

  • 박인근;이철구
    • Journal of Welding and Joining
    • /
    • v.17 no.2
    • /
    • pp.25-28
    • /
    • 1999
  • 국내에 건설되어 거의 20∼30년 가동되고 있는 발전설비, 석유화학 플랜트 등 거대설비 기기의 건전성(integrity) 및 신뢰성 확보와 잔존수명 예측을 위해서는 구조물 내부 또는 표층부에 존재하는 결 함의 특성을 아는 것과 함께 그 재료의 특정 부위에 어느정도의 응력이나 변형이 있는가를 아는 것이 매우 중요하다. 일반적으로 강 용접부의 비파괴적 결함검출에는 주로 SV파(vertically shear wave)와 SH파(horizontally shear wave)라 불리는 횡파를 이용한 초음파사각탐상법이 실용화되어 이용되고 있다. 그러나 비파괴적인 방법에 의한 실험적인 잔류응력 측정, 변형해석법에는 전기 저항 및 자기 스트레인 게이지법, X선회절법, 광탄성법(photoelasticity), 모아레(Mohr's)법, 레이저스펙클(Laser speackle)법, 응 력도료법, Barkhausen Nosise법, Caustics법 등이 제시되어 있으나 그 유용성 면에서는 아직 해결되야할 문제가 많이 남아 있는 실정이다. 응력이나 변형을 해석하는 방법으로 이론적 방법, 계산적 방법 실험적 방법이 잇다. 이론적 방법에는 재료 역학적으로 취급하는 방법, 탄성론 등이 있고, 계산적인 방법에는 유한요소법이 있지만, 이론적 방법이나 계산적 방법만으로는 해석이 불가능한 경우가 많기 때문에 실험 적 방법이 필요하게 된다. 이 글에서는 파괴 시험 또는 다른 비파괴평가기술에 비해 간편한 측정, 높은 측정정도, 시험결과 도출의 신속성, 검사비용의 절감 등 많은 장점을 가지고 있고 실험적으로 유용성이 일부 검증되고 있는 음탄성법(Acoustoelasticity)에 의한 잔류응력 측정법에 관해 소개하고자 한다.TEX> mg/L(평균 49 mg/L)로 비교적 안정적인 처리효율을 보여주었다. 본 연구결과 HVC 공정은 화학약품 사용량의 절감 및 이에 따른 화학슬러지 발생량의 감소를 기대 할 수 있는 친환경기술로 유지관리비를 최소화할 수 있는 장점이 있었다. 않은 사람들 중 미래의 검진실행의지에 건강소식지가 영향을 미친 경우는 48.7%였다. 보건교육을 받은 후 유방암 자가검진 실천율은 사업군에서 53.9%로 받기 전의 27.3%보다 증가하였으나 대조군의 경우는 별 차이가 없었다. 연령별로는 60대가 가장 높았고 사업군에서 검진율의 증가분은 30대가 가장 컸다. 교육수준별로는 사업군은 고졸이, 대조군은 전문대졸이 가장 높았고 사업군에서 검진율의 증가분은 고졸에서 가장 컸다. 보건교육 후 유방암과 관련된 건강지식의 정도는 사업군이 3.7점으로 대조군보다 유의하게 높았으며, 유방암 자가검진법을 실천하는 사람들의 동기는 ‘일반 대중매체의 영향’이 가장 많았으며 건강소식지가 동기인 경우도 20.4%였다. 사업군에서 건강소식지가 유방암 자가검진법 실천에 영향을 미친 경우가 79.6%였으며 유방암 자가검진법에 관한 보건교육을 받고 실천하지 않은 사람들 중 미래의 실천의지에 건강소식지가 영향을 미친 경우는 43.6%였다. 이상의 소견에서 지역주민을 대상으로 인쇄매체를 통한 보건교육은 인쇄물만으로도 쉽게 실천 할 수 있는 유방암 자가검진법이 가장 효과적이었으며, 자궁암검진에 관해서도 검진을 받을 수 있도록 지역사회의 보건의료의 하부구조를 정비하여 제도적 장치를 마련하고 정보를 제공한다면 자궁암검진 실천율도 증가할 것이다.고 12.9% 의 발달율을 보여 유의적인 차이를 보이지 않았다. 이상의 결과로 보아 핵이식 수정란을 효율적으로 생산하기 위하여

  • PDF

Automatic Inference of Standard BOQ(Bill of Quantities) Items using BIM and Ontology (BIM과 온톨로지를 활용한 표준내역항목 추론 자동화)

  • Lee, Seul-Ki;Kim, Ka-Ram;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.99-108
    • /
    • 2012
  • The rough design information is only available from BIM(Building Information Model) based schematic design. So, it is difficult to obtain sufficient information for generating BOQ. Like 2D design, there are some problems that the results are depend on what the choice of cost estimator. However, the most research of BIM based cost estimation are focus on quantity takeoff, the consideration of work item for generating BOQ is insufficient. Therefore, this paper present automatic inference process of work items in a BOQ using ontology. The proposed process and ontology is validated through applying tiling construction. If the proposed process is utilized, it is expected the basis of developing generation method for consistent BOQ by resolving intervention of cost estimator's arbitrary decision.

Analysis the Appropriate Schedule for the Installment Payment Amount and Establishment of the Post sale System and Policy in the Apartment Construction (공동주택 건설사업에서 후분양의 제도 및 정책 수립을 위한 분담금 납부 적정시기 분석)

  • Yoon, Inhwan;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.59-65
    • /
    • 2021
  • Since the 2016 "Housing Act Partial Amendment" and the "2018 Housing Comprehensive Amendment Plan", interest in the pre sale system and post sale system of apartment houses has been on the rise. In order to compare the advantages and disadvantages of the pre sale system and the post sale system of apartment houses, and to establish the basis for the institutional policy of the post sale system, a questionnaire survey method was used for tenants of the apartment house from the public side, and issues of time and cost. The time series analysis method is intended to suggest an appropriate time for payment of contributions. Accordingly, through a review of existing theories and literature, the post sale system of public and private institutions was organized, and through a questionnaire survey, the path to securing pre sale money, product information of the model house, and the degree of awareness of the effect of the post sale system were investigated. For the post sale fund support and payment method, it is necessary to increase the commercial line for existing financiers from the user's point of view, and it is necessary to operate in consideration of the economic power of the pre sale market by region. Both 60% post sale and 80% post sale have a price range of up to KRW 10 million, and the total interest rate is 5.0%, and the annual interest rate is about 2.8% for 60% post sale, and about 2.1% for 80% post sale, which is lower than the current 3.1%. I need an interest rate. The research is a perception survey targeting a total of 5,213 households in a sample of after sale apartments in public institutions. As the actual values are analyzed using a time series on the effects of market supply and demand and market prices, there is a limit to applying them to prospective residents of private apartments. In addition, to respond to first time tenants, a questionnaire survey was conducted on five complexes that have moved in within the last five years.