• Title/Summary/Keyword: 건설분류체계

Search Result 346, Processing Time 0.022 seconds

Knowledge Assets Classification in Construction Industry Through Construction Characteristic and Information (건설업 특징과 생성정보를 통한 건설업 지식자산 분류방안)

  • Lee Tai Sik;Lee Jin Uk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.333-336
    • /
    • 2001
  • The future industry, intangible assets, like expertise, customer satisfaction, and employee's volition and capability, create more company value than any other components. The company's outcome mostly depends on managing these intangible knowledge assets. Construction industry is trying to adapt knowledge management system to manage their knowledge assets, but Hey do not build up knowledge assets definition and knowledge assets classification as much as other industries do. Most researches related knowledge assets classification are not concentrated on construction industry so it is need to define knowledge assets and establish knowledge assets classification of construction based on construction characteristics and informations. With this research result, construction knowledge assets classification can be the basis of knowledge asscts evaluation and knowledge map for knowledge management system.

  • PDF

A Study on the Practical Utilization Analysis and Linkage Scheme of WBS and OBS from the Construction Manager (CMr) Perspective (건설사업관리자(CMr) 측면에서의 WBS와 OBS의 실무적 활용도 분석 및 연계 방안에 관한 연구)

  • Yang, Jinkook;Seo, Boram;Lee, Sangbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.57-64
    • /
    • 2020
  • Construction management performs a variety of tasks, and the buildup of the WBS and OBS is one of the core tasks. However, the practical utilization of WBS and OBS is low in the current construction management work. In this study, we conducted a survey of related experts to analyze the understanding, utilization level, application effect, and connectivity of WBS and OBS. As a result, it was identify that the standardization and linkage of WBS and OBS should be secured so that the construction manager (CMr) could apply it. Therefore, we extracted management control factors through expert in-depth interviews and workshops and conducted AHP importance analysis. Analysis results of importance shows that there is a high importance of strengthening the link between WBS and OBS and updating OBS due to changes in WBS. The results presented are not direct solutions, but are expected to provide a standard for construction managers to consider.

A Study on a Pattern Analysis of Quality Differentiation on Apartment Housing (공동주택 단위세대의 품질차별화 유형에 관한 사레 조사 연구)

  • Cho, In-Sig;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.126-133
    • /
    • 2008
  • Current changing to the customer-oriented market naturally causes suppliers to meet an age of competition on the quality. In order to plan housing meeting this quality competitiveness era, I set up the type classification system of quality differentiation for the unit of apartment housing by executing differentiation cases of unit quality and type analysis of the object. The system is consist of 3 classification systems by quality element, user convenience element and product element as follows: First element is to classify quality element on the basis of plane and interior elements, architectural elements and second one is user convenience element relating facility to classify environment-oriented, safety, energy saving and convenience. The other one is the product element to classify furniture, installing product and convenient product. I believe that this classification system will be useful to determine any classification elements of product for product positioning and product planning in the stage of marketing planning of apartment housing in the future.

A Suggestion on the Improvement of the Business Classification System Considering the Specialty of the Painting Work, Landscaping Construction Industry (전문건설업 대업종화 적용에 있어 도장, 조경공사의 특수성을 고려한 업종분류체계의 제안)

  • Kim, Jeong-wook;Kim, Gyu-yong;Choi, Min-soo;Nam, Jeong-soo;Lee, Sang-soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.497-506
    • /
    • 2022
  • In recent years, the specialized construction industry has undergone major construction and major industries, and without considering the technical expertise of construction works, the construction industry is promoting the integration and establishment of specialized construction industries according to convenience and abolition of their own industries. As the reorganization plan causes confusion in the production structure and lacks persuasive power by aiming only for industry simplification, it is judged to be desirable to review it according to the detailed characteristics of the specialized construction industry. In this study, -to review the reorganization of a rational classification system that considers the specific nature of the specialization of specialized construction projects, the classification of construction works, major work contents and characteristics, technical expertise, and problems of largescale industry in the case of painting construction and landscaping construction was analyzed. Based on this, aspects to be considered when reorganizing the current professional construction industry classification system are identified and reasonable improvement plans for each industry are suggested.

An Analysis on Work Delay Factors in Apartment House Construction (공동주택 공사의 작업지연요소 분석)

  • Ahn, Sang-Hyun;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.159-166
    • /
    • 2007
  • Work delay is one of the facts that make the reliability of construction projects decrease. Therefore, it is important to classify and prioritize the delay factors. This research analyzed key delay factors in apartment house construction through survey. The results of analysis are as follows. (1) Insufficient work force is the key delay factor in structural and finish work. (2) Improper craft of worker is the key delay factor in electrical work. (3) Incompletion of proceeding work is the key delay factor in mechanical work.

A Study on the Current Status and the Problem of Classification System in Agricultural Facilities (농업건축물 분류체계 현황 및 문제점 파악에 관한 연구)

  • Choi, Oh-Young;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee;Cho, Hyung-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.253-257
    • /
    • 2009
  • General technique and management technology of agriculture have development in every year to ensure the competitiveness of agriculture. Accordingly, Interested in using information systems management technology is improving. For information system, the first system of rural buildings category should be established. Classification system is set up through each specific code. and it takes advantage of the information system is to achieve the computerization of agricultural society. Therefore, in this study construction information classification system, quantity of output category, got to the standard classification system architecture, apply to agricultural buildings to review the situation and saw a problem. The result, it is the complexity and broad scope, and it is set to inappropriate setting of the Category item.

  • PDF

Development of Earned Value Management System by Using Visualization Index and WBS Map (시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발)

  • Lee, Woo-Sik;Kang, Leen-Seok;Park, Seo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.26-35
    • /
    • 2009
  • Work breakdown structure (WBS) can be used as an information center in earned value management system (EVMS) for the construction project. Because EVMS results, such as schedule variance and cost variance, are analyzed for the selected WBS code, the role of WBS code is important in EVMS. This study suggests a methodology for organizing WBS map with a quadrant. It can represent the project organization collectively by work level in a coordinate system. And the study developed an EVMS tool based on the WBS map and this tool can visualize various attribute indexes of EVMS by color symbols. Those methodologies can be used for improving practical application of EVMS.

A Study on the Life Cycle Cost Analysis of Light Railroad Transit Bridges (경량전철 교량의 생애주기비용 분석에 관한 연구)

  • Lee, Du-Heon;Kim, Kyoon-Tai;An, Dong-Geun;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.384-389
    • /
    • 2006
  • The needs for Light Railroad Transit(LRT) have been increased due to the heavy traffic congestions in large cities like Seoul, Korea. Korean government is seeking the LRT system development (including planning, designing, construction, and maintenance and operations) in terms of public-private-partnership (PPP). At the private sector side, it is crucial to estimate the life cycle cost (LCC) to project the cash flow during the O&M period. Since the most construction and O&M cost of LRT project is at the bridge construction, a cost analysis model and a cost breakdown structures (CBS) on LRT bridges are discussed through in depth literature reviews. Construction and maintenance cost of bridges are collected and analyzed. LCC is analyzed by types of bridge superstructures and historical data of repair and rehabilitation (R&R) is investigated. There have been scarce number of LCC analysis on railway bridges. This research delivers a well-defined CBS and maintenance cost data, which will be a great benefit to the systematic maintenance strategy development for railroad bridges.

  • PDF

A Model of Work Breakdown Structure for being applied to Historical Data in BTL Project for Educational Facilities (교육시설 BTL 사업의 실적공사비 적용을 위한 작업분류체계(WBS) 구축)

  • Kim, Sung-Kyum;Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.499-502
    • /
    • 2007
  • The government abolished the existing method to calculate the construction price by the quantity take-off and pricing. It has introduced a new estimating system which uses the actual cost data on the basis of actual contract unit price. However, in the case of the current method to calculate the estimate price of BTL educational facilities, it is difficult to prepare an accurate ground for calculating unit prices due to a lack of standardized work breakdown structure (WBS) and guidelines for the detailed bidding documents. Thus, this research aims to establish WBS using the actual construction price on the basis of the actual bidding documents for the previous construction of BTL educational facilities. This specific WBS can be differentiated from the general WBS which is not suited for construction of the educational facility. It makes possible to build the construction information classification system and it helps to systemize the maintenance and repair cost items.

  • PDF