Development of Risk Breakdown Structure of Nuclear Power Plant Decommissioning Project: Focusing on Structural Damage / Work Process Risks (원전 차폐 콘크리트 구조물 제염해체공사 리스크 분류체계 구축: 구조적 / 작업 리스크를 중심으로)

  • Kim, Byeol;Lee, Joo-Sung;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.3
    • /
    • pp.38-45
    • /
    • 2018
  • The purpose of this study is to deduct the structural damage / work process risks factors which can be occurred during the decommissioning in the NPP containment concrete structure. To achieve these purpose, risk profile specified in the construction industry is analyzed, and the work process of NPP decommissioning and the construction project were matched based on the similarity of each works. Accordingly, human and physical risk factors are classified. Finally, the risk associated with the building structure and work process was classified as per their process activities, and risk typology explaining the disaster which put the structure, equipments, machine and workers in serious danger was developed.

A Study on Ecotope Diversity Transition Analysis in the Middle of Mankyung River (만경강 중류 에코톱다양성 추이분석 연구)

  • Kim, Woo Ram;Kim, Ji Sung;Kim, Kyu Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.480-480
    • /
    • 2016
  • 에코톱은 생태학적 지휘체계(Niche)와 서식처(Habitat)가 결합된 환경을 의미하며 도면에서 최소한의 단위로 일반적인 구성요소의 상태, 잠재자연식생, 잠재생태계 기능으로 균일하게 분류가 가능한 요소로서 천이단계 또는 토지이용이 서로 다른 패치들로 이루진 생태공간을 의미한다. 따라서 에코톱과 비오톱은 식물과 동물의 특정 군집에 요구되는 서식공간의 개념에서는 의미가 같지만 비오톱은 서식공간의 일부분 또는 한 개 이상의 생물이 서식가능한 공간의 개념으로 사용된다. 현재 네덜란드, 스페인을 포함한 유럽국가에서는 에코톱분류를 통한 하천을 관리하는 방안을 제시하고 있으며 이에 대한 많은 연구가 진행되고 있다. 본 연구에서는 만경강 중류 소양천 합류점에서 전주천 합류점까지 약 3.5km 구간의 제외지포함 제내지 1km 폭을 대상으로 1918년 고지도 토지피복을 분류하고, 1948년 해방이전 항공사진, 2003년 2014년 항공사진을 활용한 에코톱을 분류하여 이에 대한 에코톱 다양성지수를 추이분석하여 하천으로부터 떨어진 거리 별 에코톱다양성지수 변화를 분석하였다. 분석결과 과거 제방축조 이전인 1918년 에코톱 다양성 지수는 하천으로부터 멀어질수록 안정적으로 감소하였으나 1948년 이후의 하천은 제내지에서부터 지수값이 급격히 감소한 것을 알 수 있었다. 이는 1948년 이후의 만경강은 과거 1918년 하천에 비해 구하도 공간이 농경지 증가, 보설치 등으로 인한 인위적 교란에 의한 감소로 분석되어지며 에코톱다양성과 밀접한 연관이 있는 생물종다양성 역시 감소하였음을 유추할 수 있다.

  • PDF

건설산업의 중요성과 건설기술 정책의 위상

  • 박병무
    • 월간 기계설비
    • /
    • s.45
    • /
    • pp.45-54
    • /
    • 1994
  • 건설산업은 국민경제에서 차지하는 비중이 높으며, 향후 지속적으로 대상영역이 확대되고 기능 및 규모가 커질 전망이다. 우리나라 건설기술의 현위치는 선진국 수준을 100을 할때 70정도에 불과하며, 발전속도의 관점에서 국내 제조업에 비해서도 저조한 실정이다. 이는 정부의 기술개발사업에서 건설기술 개발 필요성에 대한 인식의 부족으로 과학 및 산업기술의 개발 필요성에 대한 인식의 부족으로 과학 및 산업기술의 분류에서 독자적인 항목으로 설정되지 않고 있으며, 적절한 예산지원이 이루어지지 않고 있다는 데 문제의 원인이 있다. 민간부분의 경우는 매출액 대비 기술개발비용이 일본과 비슷한 비율이지만, 매출액 규모를 고려해 볼 때, 부가가치 창출 효과를 논하기는 이른 실정이다. 한편, 건설산업의 성격 역시 자본절약형으로 선진국에 비해 장비수준 및 자본생산성이 떨어지고 있어, 기술수준의 낙후를 시사하고 있다. 앞으로 국제화, 개방화, 지방화의 시대가 도래할 것이고, 자유경쟁원리에 토대를 둔 경영효율, 기술혁신, 품질 등에 의해 경쟁력의 우위가 결정될 것이다. 향후, 건설기술정책은 건설기술개발의 체계화, 신기술 활용의 극대화, 건설산업의 종합화 및 전문화, 생산체계의 효율화 등을 지향해야 한다.

  • PDF

Patterns and Trends in Schedule Control Practice of Korean General Contractors (건설기업 공정관리 패턴의 현황 및 변화 분석)

  • Jung, Young-Soo;Kim, Hee-A
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.88-96
    • /
    • 2011
  • Schedule control is an exceedingly fundamental and important construction business function. Even though enormous research efforts have been exerted in this area, there has been no comprehensive and quantitative study exploring detailed cost control practice of construction companies in terms of practical patterns and trends. In this context, this paper surveyed the patterns and trends of schedule control practice of Korean general contractors. Schedule control process as compared to schedule reduction is focused in this paper. The variables for practical schedule control process were identified first. A survey questionnaire was then developed and used in order to collect data from Korean general contractors. Survey results analyzing responses from 45 companies show that scheduling processes in practice have been significantly enhanced in terms of software tools, manuals, and capabilities of engineers.

Application of BIM technologies for maintenance of subway structures (지하철 구조물 유지관리를 위한 BIM 기술 활용)

  • Shim, Chang-Su;Kim, Seong-Wook;Yun, Nu-Ri;Song, Hyun-Hye
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.91-94
    • /
    • 2011
  • 시설물 전생애주기에 걸쳐 정보가 공유되고 피드백 될 수 있는 BIM(Building Information Modeling) 기술의 등장은 유지보수 관리자들에게 가장 필요한 유지관리점검 도구의 의미를 지님과 동시에, 정보모델을 기반으로 주요 기술영역 및 사업주체간 원활한 의사소통이 가능해지도록 한다. 효율적인 지하철 터널의 유지관리를 위해서는 체계적으로 조직된 데이터가 필수적이다. 설계, 시공, 유지관리 단계별로 효과적인 협업을 위한 유기적인 단일 모델이 요구된다. BIM기반의 지하철 터널 구조물의 유지관리를 위해 건설정보분류체계 및 이를 보안한 유지관리점검 표준분류체계를 적용한 정보모델을 개발하였다.

  • PDF

A Study on Development of Bridge Maintenance and Management System Using GSIS (GSIS를 이용한 교량 유지보수 이력관리 체계 개발에 관한 연구)

  • Yeu, Bock-Mo;Joo, Hyun-Seung
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.7 no.2 s.14
    • /
    • pp.133-141
    • /
    • 1999
  • Collapse of a huge structural material has brought about enormous loss of lives and property. Every construction may be destroyed by the nature's power and careless mistake of human as well as its own defect. So a great number of concern and detailed managing technique are demanded not in constructing work but also in management of constructed material. The Interest of construction safety has Increased rapidly and a plenty of effort has been attempted to manage systematically. In this study, the use of FM(Facilities Management) as a branch of GSIS(Geo-spatial Information System) was developed to offer the users convenient managing achievement and establishment of history managing system in the bridge management system. This study accomplished dividing all information of images, photos, drawing and etc. into their items of time, material and the person in charge, and developed to stue and maintain those items in database. Related database which is composed of recording of check, retrieving and adding the data was accomplished to an easy access of database, and by using these data as output for example images, m display, report and hard copy, this system was proved to help manage efficiently in bridge management system.

  • PDF

A Case on the Applying QDB based Schedule·Cost Data Management for Road Construction (디지털 수량산출정보 기반 도로분야 공정·공사비 정보 관리 시범적용 사례)

  • Moon, Jin Seok;Yoon, Hoi Soo;Han, Choong Han;Kim, Seong Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.1428-1429
    • /
    • 2012
  • 건설분야 수량산출정보의 연계 및 교환을 위한 디지털 수량산출정보 교환표준과 지방국토관리청의 도로관리관점에 따라 구성된 작업분류체계를 바탕으로 도로분야 수량산출정보를 지원도구를 통해 생성한다. 건설사는 지원도구에서 작성한 도로공사 수량산출정보를 건설사업관리시스템에 등록함으로써 공정 공사비 관리에 활용하고 있다. 본 연구는 공정 공사비의 통합관리를 통해 실질적인 사업관리가 가능하도록 10개 도로건설공사 시범사업을 선정하여 문제점과 개선방안을 도출하였다.

A study on the Information for the Schedule Management of the Construction based BIM (BIM기반 건설공사 일정관리를 위한 정보에 관한 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of Digital Contents Society
    • /
    • v.16 no.4
    • /
    • pp.555-564
    • /
    • 2015
  • Since the size of the construction project has become massive, complicated and specialized, the use for a substantial amount of information provided from diverse participants is considered important. Schedule information obtained from a variety of sources is key during the construction project. Misunderstanding of schedule management information causes delay of construction period and low quality of construction. Currently, interest in BIM (Building Information Modeling) that produces the necessary data for the entire life cycle of the building process is rising. The study is to construct the BIM-base-information system in order to systematically manage schedule information of the construction work. For this purpose, the study established a BIM-base-schedule-management-business process and drew a classification system for the work for schedule-information construction. The study also drew information that can be extracted from the BIM model among properties required to build certain information. The schedule is made upon consideration of information needed for schedule management, and information required to schedule a timeline of the construction project by process is established.

Strategies for Activating BIM-data Sharing in Construction - Based on cases of defining practical data and a survey of practitioners - (건설분야 BIM 데이터 공유 활성화 전략 - 건설 실무분야의 데이터 연계방법과 실무자 설문을 기반으로-)

  • Kim, Do-Young;Lee, Sung-Woo;Nam, Ju-Hyun;Kim, Bum-Soo;Kim, Sung-Jin
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.72-80
    • /
    • 2022
  • It has become mandatory to designs by BIM in construction. It is urgent to make accurate decisions through the linkage between complex and various types of data in projects. In particular, block-chain based data sharing process (using BIM files, general construction submitted files) is essential to support reliable decision making in complex data flood systems. Prior to developing data sharing system based on block-chain, in this paper, a data linkage method is proposed so that practitioners can simultaneously utilize existing construction information and BIM data. Examples are shown based on the construction classification system and file expression, and incentive strategies are explored through a survey so that heterogeneous information can be used at the same time in overall projects.

Development of a Risk Management Procedure Model for the Construction Project Using Construction Risk Management System (CRMS를 활용한 건설공사의 리스크관리 절차모형 개발)

  • Kim, Chang Hak;Kang, Leen Seok;Park, Hong Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.423-432
    • /
    • 2010
  • This study suggested CRMS (construction risk management system) which is a new risk analysis model after analyzing existing risk management process for to guarantee a successful performance at the construction planning and work phase. CRMS is risk management procedures in order that the contractor identify, analyze and administrate the risk during performing construction project. This model may give much help to quantify and be ready the right managing methods about identified risk by the contractor. Especially, the most important and difficult things of all risk management may be to identify risk in the project. This study make more focusing on the developing a procedure that can identify risk more easily in the construction project. The risk is divided into global risk and local risk of a project. Also, this study suggests methods which are using the RBS (risk breakdown structure) related with WBS. This result will be useful as basic materials for developing computerizing system for risk management.