• Title/Summary/Keyword: 건설문서

Search Result 243, Processing Time 0.029 seconds

Model Design and Applicability Analysis of Interactive Electronic Technical Manual for Planning Stage of Construction Projects (건설공사 기획단계 전자매뉴얼의 적용 모형 구성 및 효과 분석)

  • Kwak, Joong-Min;Kang, Leen-Seok
    • Land and Housing Review
    • /
    • v.12 no.2
    • /
    • pp.121-139
    • /
    • 2021
  • Technical documents in the construction field are changing from paper documents to electronic ones. As a result, the industry witnesses a trend of using portable electronic devices in searching or retrieving necessary information such as relevant regulations. Despite the improvement in the accessibility to general technical documents, a limitation is still found in accessing the electronic documents on the regulations. We see the barrier for field engineers to enhance their technical knowledge. One of major barriers is that videos, animations, and virtual reality information to enhance the visual understanding of technical content related to regulations are not linked. It is the interactive electronic technical manual (IETM) that can address such issues. The IETM is an electronic document system that enables real-time information acquisition while operating in the form of conversations with users by linking multimedia functions to document types such as specifications and guidelines. This study establishes a model of the IETM that can be operated in the planning stage of a construction project. The study also verifies its usability with a hypothetical case study. This study aims to improve the usability of the IETM in the construction project by analyzing the application effect of the IETM using the AHP technique.

Procedural Model of XML Schema Framework for Digitalizing Disaster Information Management for Construction Facility (시설물 재해정보관리 전자화를 위한 XML스키마 구축 방법의 절차적 모형 구성)

  • Kang, Leen-Seok;Park, Seo-Young;Moon, Hyoun-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.56-64
    • /
    • 2006
  • The current disaster management manual is being utilized as a book or document-based type. It causes a low applicability and interoperability in practical business because each information has a different document format and it is difficult to recycle those information as common disaster information. The information reading by text type without electronic data and visual object also has a limitations in guaranteeing a quickness of disaster management business. Accordingly, the electronic document management system with visual information is necessary and the system needs to tie framed by XML schema because the electronic document standard will be changed from DTD to XML schema. This study attempts to develop a procedural methodology of an electronic document management system based on XML for disaster management. The applicability of the proposed results is verified by the simulated scenario.

전력산업기술기준 KEPIC 가이드 -품질기술기준-

  • 우종운
    • JOURNAL OF ELECTRICAL WORLD
    • /
    • s.295
    • /
    • pp.50-58
    • /
    • 2001
  • 품질보증 기술기준은 지금까지 발전소의 건설, 운영에 있어 외국 기술기준의 적용에 수반하였던 외국 기술기준상의 품질시스템인증, 공인검사, 설계문서의 인증 등 제도적 요건의 적용에 대한 문제점을 해소하고 우리나라의 법체계와 산업여건 및 관행에 맞는 제도를 정립하고자 제도의 운영에 있어 필수적이고 상세한 요건인 원자력 품질보증계획, 공인검사기관 및 공인검사원 자격 인정 및 설계문서를 인증하는 등록기술자의 자격인정에 대한 기술기준을 범위로 하여 제정되었다.

  • PDF

Development of SVM-based Construction Project Document Classification Model to Derive Construction Risk (건설 리스크 도출을 위한 SVM 기반의 건설프로젝트 문서 분류 모델 개발)

  • Kang, Donguk;Cho, Mingeon;Cha, Gichun;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.841-849
    • /
    • 2023
  • Construction projects have risks due to various factors such as construction delays and construction accidents. Based on these construction risks, the method of calculating the construction period of the construction project is mainly made by subjective judgment that relies on supervisor experience. In addition, unreasonable shortening construction to meet construction project schedules delayed by construction delays and construction disasters causes negative consequences such as poor construction, and economic losses are caused by the absence of infrastructure due to delayed schedules. Data-based scientific approaches and statistical analysis are needed to solve the risks of such construction projects. Data collected in actual construction projects is stored in unstructured text, so to apply data-based risks, data pre-processing involves a lot of manpower and cost, so basic data through a data classification model using text mining is required. Therefore, in this study, a document-based data generation classification model for risk management was developed through a data classification model based on SVM (Support Vector Machine) by collecting construction project documents and utilizing text mining. Through quantitative analysis through future research results, it is expected that risk management will be possible by being used as efficient and objective basic data for construction project process management.

A Development Method for Standardized Document Model of Structural Calculation Document (구조계산서의 표준화된 문서모델 구축 방법)

  • Kim, Bong-Geun;Park, Sang-Il;Kim, Hyo-Jin;Lee, Sang-Ho
    • Journal of Korean Society of societal Security
    • /
    • v.1 no.3
    • /
    • pp.83-91
    • /
    • 2008
  • Most construction information is being recorded in the form of electronic document. However, design documents generated in current practice are not suitable in share and exchange of information for disaster management. This study proposes how to develop th e XML Schema based semantic model of structural calculation document (SCD) for systematic storage and management of SCD information. in addition, 5 basic data types are developed for various expression forms appeared in the structural calculation documents. A prototype semantic model for steel bridge superstructure is developed based on the proposed method, and it is observed that the proposed method can be effectively used to build a standardized semantic model of SCD.

  • PDF

해외건설공사 수행절차(4)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.9 s.218
    • /
    • pp.51-55
    • /
    • 2008
  • 제출된 입찰서는 대부분 공개적으로 개봉하며, 입찰자의 명칭과 입찰금액이 함께 공표된다. 감리자는 입찰서가 산술적으로 정확한지, 요구된 자재 및 입찰문서의 조건에 부합하는지를 검토하고, 입찰자와 면담 등을 통해 입찰서의 평가를 완료한 후 발주자에게 낙찰(계약)수여에 관해 추천을 한다. 발주자는 낙찰된 입찰자에게 낙찰통지서(Letter of Award) 또는 낙찰(계약)의향서(Letter of Intent)를 발급해 시공자가 작업준비를 할 수 있게 한다. 낙찰통지서를 받은 시공자는 공사이행보증서(Performance Bond) 및 선수금 보증서(Advance Payment Bond)를 제출하고, 입찰보증서(Tender Bond)를 반환 받으며, 계약체결을 완료한다.

  • PDF

A Study on XML Unqualified Data Type of Construction Information (건설정보의 XML 비한정 데이터 유형에 관한 연구)

  • Jeong, Seong-Yun
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2007.05a
    • /
    • pp.481-482
    • /
    • 2007
  • 건설분야에서 표준화된 정보체계에 따라 XML 전자문서를 개발할 수 있도록 UN/CEFACT의 핵심요소 개발 지침을 기반으로 XML 라이브러리를 개발하였고 XML 라이브러리에 핵심요소, 비즈니스 정보체계, 핵심요소 유형의 기초가 되는 한정어 데이터 유형(Unqualified Data Type)을 포함하고 있다. 본 연구는 건설정보의 특성을 반영한 16종의 한정어 데이터 유형과 속성정보를 정의하고 XML 스키마를 개발하였다.

  • PDF

Construction present state managerial system specification and implementation based on the WBIS (WBIS를 이용한 건설공사현황관리시스템 설계 및 구현)

  • 김남곤;강의석;서명배
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.10b
    • /
    • pp.397-399
    • /
    • 2003
  • 각 관공서나 공공기관에서 발생되는 각종 공사현황정보와 기술정보를 시설물 전체 수명주기동안 제대로 활용하기 위해서는 시설공사관리 업무를 전자처리체계로 전환하는 것이 시급하며, 사업계획에서 준공까지 일련의 과정에서 발생하는 문서들의 보관이 비체계적이므로 이를 잘 보관하고 재 사용하기 위한 관리체계가 필요하다. 따라서 본 연구는 공공건설분야를 담당하고 있는 지방국토관리청을 대상으로 사업단위별로 업무를 7가지로 세분화하고. 그 중에서도 핵심부분인 공공건설사업에 대한 체계적이고 효과적인 관리체계를 유지할 수 있는 웹 기반의 공사현황 정보시스템을 제안한다.

  • PDF

A Stduy on the Development of XML Schemata and STEP Model for Sharing Construction Drawings Information (건설도면정보 공유를 위한 XML 스키마 개발 및 STEP 연계기술에 관한 연구)

  • Kim, In-Han;Choi, Jung-Sik;Jo, Chan-Won
    • The Journal of Society for e-Business Studies
    • /
    • v.9 no.3
    • /
    • pp.57-77
    • /
    • 2004
  • The main purpose of this study is to develop XML schemata and related STEP model for sharing construction drawings information. To achieve this purpose, the authors have developed a drawing information model based on STEP/AP202, the data searching mechanism based on STEP, and XML schemata for sharing and exchanging information between vector data and non-shape attribute information. Finally, the authors have suggested the way of sharing drawing information through linked STEP data and a XML schema using test cases of construction material information and code checking. The study shows a way of optimized managing and sharing construction information through the drawing information and external data for the whole building life-cycle, from early design stage to the construction stage.

  • PDF

A Deep Learning Model to Predict BIM Execution Difficulty Based on Bidding Texts in Construction Projects (건설사업 입찰 텍스트의 BIM 수행 난이도 추론을 위한 딥러닝 모델)

  • Kim, Jeongsoo;Moon, Hyounseok;Park, Sangmi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.851-863
    • /
    • 2023
  • The mandatory use of BIM(Building Information Model) in larger Korean public construction projects necessitates participants to have a comprehensive understanding of the relevant procedures and technologies, especially during the bidding stage. However, most small and medium-sized construction and engineering companies possess limited BIM proficiency and understanding. This hampers their ability to recognize bidding requirements and make informed decisions. To address this challenge, our study introduces a method to gauge the complexity of BIM requirements in bidding documents. This is achieved by integrating a morphological analyzer, which encompasses BIM bidding terminology, with a deep learning model. We investigated the effects of the parameters in our proposed deep learning model and examined its predictive validity. The results revealed an F1-score of 0.83 for the test data, indicating that the model's predictions align closely with the actual BIM performance challenges.