• Title/Summary/Keyword: 건설노무

Search Result 215, Processing Time 0.022 seconds

Interaction Analysis between Construction Business Indicators and Business Performance Indicators of Specialty Contractors providing Labors (노무중심 전문건설업체의 건설경기지표와 경영성과지표의 상관성 분석)

  • Kim, Nam-Sik;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1893-1899
    • /
    • 2014
  • This study is to suggest strategies of specialty contractors that provide labors oriented engineering service by interaction analysis between construction business indicators and business performance indicators. For specialty contractors that mainly provides labor oriented engineering service, the amount of construction orders imposes lasting impact to the turnover ratio of current assets supposedly because they are operating current assets to secure labor. In other words, this type of specialty contractors are focused on mobilization of labor not materials or equipment. So, it is determined that they will be able to increase revenue by operating current assets to address current liabilities and labor mobilization.

Development of Labor Management System Based on RFID Technology for Construction Field (RFID기술을 활용한 건설현장의 노무관리시스템 프로토타입구축)

  • Han, Jae-Goo;Kwon, Soon-Wook;Cho, Moon-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.853-858
    • /
    • 2007
  • Construction industry is traditionally labor intensive. And construction site is also in densely populated environment. So accurate labor monitoring is one of important issues for site management. Labor cost shares large amount of part in total construction cost. Therefore, it is a major element in site management and control. In this article, we explained development of prototype system for labor monitoring based on RFID technology and results of field tests using the system. According to the results, the system is able to expected to improve effectiveness of Labor management in construction site

  • PDF

An Application of PDA and Barcode Technology for the Improvement of Information Management in Construction Projects (건설프로젝트 정보관리 효율화를 위한 PDA 및 Barcode 적용기술 개발)

  • Oh Se-Wook;Kim Young-Suk;Lee Jun-Bok;Kim Han-Soo;Sung Nak-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.553-558
    • /
    • 2003
  • The information of works performed by labors can be used for analyzing project status related to schedule, cost and productivity, etc. The purpose of this research is to develop a computer-based system by the application of PDA and barcode technology in order to measue and monitor the amount of workforce resources, works done and productivity. It is anticipated that the effective use of the devepoped system would be able to effectively assist the schedule planning and management for present and prospective construction projects.

  • PDF

법령과 고시 (3): 2011년 건설업 적용 노무관련 요율

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.247
    • /
    • pp.32-33
    • /
    • 2011
  • 2011년도 건설업 적용 각종 노무 요율이 고시되었다. 고용노동부는 국민건강보험을 비롯하여 국민연금보험요율, 고용보험요율, 건설업 산재보험요율, 건설업 월 평균 임금, 장애인 의무고용, 최저임금 등을 발표했다. 2011년에 적용될 국민건강보험요율은 5.64%이고 국민연금보험요율은 9%, 건설업 산재보험요율은 36/1,000, 건설업 월 평균임금은 3,007,852원, 장애인 의무고용은 공사 실적액이 70억4천9백만원, 장애인 고용부담 기초액은 560,000원(1인당/월), 모든 산업의 최저 임금은 4,320원이다.

  • PDF

A Study on the Method of Estimating Indirect Labor Cost Rate Using the Analysis of Cost Items in Complete Works (완성공사 원가구성 분석에 의한 간접노무비율 산정방법에 관한 연구)

  • Jung Soon-Kil;Lee Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.81-89
    • /
    • 2001
  • Construction industry has particular properties of non-continuity of production, and non-stability of market comparing to other industries. Because of them, the practical construction cost is more difficultly recognized than in manufacturing industry, so, that is various according to many projects. Therefore, it is very hard work to standardize construction cost, and it is worthy of analyzing and measuring exactly construction cost. On this study, the trouble in producing expected construction cost with original cost calculation method is progressed by the data of cost items in complete works. On the basis of analyzing data, as expected cost of practical construction is measured, it can be referred to the method and the standard of indirect labor cost rate in construction.

  • PDF

Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work (공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.182-189
    • /
    • 2008
  • In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.

Trend Analysis of Labor Input Ratios by Work Types in Apartment Housing Constructions (공동주택 건설공사에서 공종별 실투입 노무비율의 추이분석)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.97-104
    • /
    • 2015
  • Apartment Housing 25 in the field of construction since 2000 collected by types of labor: reinforced concrete, plaster, internal, equipment, electrics communication, the other work. And the performance of labor input was collected in the amount of construction work performed on a monthly basis. After changing the construction period in the standardization work that is 100% of the construction period, the amount was converted into labor ratio by type. Analysis of the input flow rate and the amount of labor conclusions were as follows: (1) The size of the labor rate is reinforced concrete work (38.25%), plastering work (5.10%), internal work (5.67%), equipment work (9.10%), electrics communication (8.76%), the other works (33.12%) and the size of labor rate is the largest work in reinforced concrete work. (2) The peak of labor input ratio was from 52.5% month to 62.5% month. This was when the labor rate of 3.6%. (3) The period month of the largest labor ratio% is 35% month by reinforced concrete construction, and this time it was 2.12% per month labor rate, and reinforced concrete construction is finishing from 65% month to 80% month. This showed the greatest congestion of mutual interference between each works is being continue. The results of this study are the greatest congestion in apartment housing construction has informed the high period(%months), which is essential to a successful project.

Integrated Manpower Information Systems on Construction Site - Using RFID and QR-Code - (RFID와 QR-코드를 활용한 건설현장 통합노무정보관리 효율화 체계 구축)

  • Choi, Yun-Gil;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.106-116
    • /
    • 2011
  • It is very important to collect and manage labor information in the construction industry that is labor-intensive. Although research and cases that utilize RFID are increasing for more effective labor management, labor management is limited to the checking-in and -out information management at the entrance of a construction site due to high expense of an RFID reader. Labor and safety information is still managed based on the redundant process that is hand-written in a book and re-input of information by using a personnel-computer. Therefore, the objective of this paper is to develop more effective and efficient process for labor information record and management. This paper presents a prototype application that supports integrated labor information management by incorporating QR-code into RFID-based labor management system and verifies the application through a pilot test and comparison with the existing labor management syste.

Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors - (공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 -)

  • Jeon, SangHoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.110-118
    • /
    • 2015
  • The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.