A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

한국경제 전망과 주류산업

  • On, Gi-Un
    • 주류산업
    • /
    • v.24 no.1
    • /
    • pp.1-8
    • /
    • 2004
  • 각종 통계 지표로 볼 때 한국경제는 지난해 3분기중 바닥을 치고 회복궤도에 접어든 것으로 판단된다. 우선 경기사이클을 나타내는 대표적 지표인 동행지수 순환변동치가 작년 7월에 바닥을 치고 다시 상승국면으로 진입한 점이다. 동행지수는 산업생산, 제조업가동률, 도소매판매, 수출액, 수입액, 비농가취업자수, 건설기성액 등 7개 지표를 하나로 묶어 실물경기 흐름을 파악하기 위해 작성하는 지표다. (중략)

  • PDF

The Cooling Effect of Fog Cooling System as Affected by Air Exchange Rate (환기회수에 따른 포그냉방시스템의 냉방효과)

  • 김기성;김문기;권혁진
    • Proceedings of the Korean Society for Bio-Environment Control Conference
    • /
    • 2000.10b
    • /
    • pp.84-88
    • /
    • 2000
  • 첨단유리온실의 건설이 증가하면서 여름철 온실내 환경의 적정화를 위하여 증발냉각시스템의 도입이 증가하고 있으며, 대표적인 증발냉각시스템은 패드-팬 시스템과 포그시스템 등이 있다. 포그시스템은 냉방효율이 높고 다른 시스템과 비교하여 저비용이며 온실내부공간의 활용면에서 우수한 장점이 있어 그 보급이 증가하고 있다. (중략)

  • PDF

A Case Study of Construction management for OO Cultural Welfare Center, BTL (OO문화복지종합타운 BTL사업 CM수행사례 발표)

  • Ha, Han-ki;Ha, Sin-Jae;Kim, Ki-sung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.13-18
    • /
    • 2008
  • The BTL and CM are main issues in Korea construction industry lately. The BTL applying CM is sufficient to have interest in terms of combination of BTL and CM. OO Cultural and Welfare Complex Town construction was the first cultural and welfare facility with the BTL applying CM. Because application of CM to the BTL project is at the early stage, there are many problems under the progress such as administration procedure from misunderstanding of the BTL and lack of communication between supporting Dept. and management Dept. This article focuses on those problems and advantages of CM services including negotiation, schedule management and cost management for the better CM service in the BTL project in the future.

  • PDF

A study on progress measurement method of a construction project (건설공사의 진도율 산정 방법에 관한 연구)

  • Park se-Jung;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-453
    • /
    • 2003
  • It is very important to examine and compare initial plan with earned value repeatedly in construction. For this purpose, progress measurement, which reflects the actual progress correctly, is required and it is necessary that accurate field data should be offered. To measure the progress, the entire project mutt be divided into unit works that have an accurate scope of work, and required information must be distributed to the all parties. Under the circumstances of domestic construction industry which focus on the specifications, progress measurement needs to reflect the information of schedule as well as cost that includes the quantity of unit work and construction expenses. Therefore this research proposes weighted method of progress measurement based on the information of cost and schedule.

  • PDF

Construction Contract Management Framework Using the Blockchain Technology (블록체인 기반의 스마트 건설계약 프레임워크)

  • Chui, Jinrui;Moon, Sungwoo
    • Journal of KIBIM
    • /
    • v.11 no.1
    • /
    • pp.1-10
    • /
    • 2021
  • Blockchain is a secure technology that enables transactions between parties without risking data corruption. Besides cryptocurrencies, blockchain technology is being widely adopted in various forms by diverse industries. One promising application is construction contracts. Given that construction projects are executed under strict contractual requirements, blockchain technology-based contracts can ensure that contractual requirements are executed among parties to the contract. The objective of this study is to apply blockchain technology to smart construction contracts and determine their potential feasibility in construction management. In this study, a prototype smart construction contract is presented and its applicability is explored. We conclude that smart construction contracts can be effective as a contractual tool to enhance payment flows in the construction process.

Development of the Automated Vertical Controllable Pilot-type Equipment for Improving Construction Performance of PHC Piles (PHC 파일 시공성능향상을 위한 연직 자동제어 파일롯타입의 개발)

  • Cho Chang-Yeon;Lee Junbok;Kim Han-Soo;Kim Jeoung-Tae;Cho Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.72-80
    • /
    • 2004
  • The objective of the research is to develop the automated vertical controllable pilot-type equipment for PHC piles. The motivation for the research is that inherent problems related to vertical control during pile driving. The paper explains the current vertical control methods and problems, design and manufacturing of the pilot-type automated equipment and its testing and discussions of the results.

A Development of the Automated Vertical Controllable Device for Improving Construction Performance of Pile Driver (파일드라이버 기계 시공성능 향상을 위한 연직 자동제어기의 개발)

  • Cho, Chang-Yeon;Lee, Jun-Bok;Son, Jae-Ho;Kim, Han-Soo;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.78-90
    • /
    • 2006
  • There is no specific code and/or standard described in the specifications to check verticality for Pre-tensioned Spun High Strength Concrete pile installation process. The most commonly used method for the vertical PHC pile installation is a naked-eye measurement or water level measurement conducted by assistant crew in the construction sites. The main objective of the research is to develop the automated vertical controllable prototype equipment for PHC piles in order to achieve uniform construction qualify as well as improving safety and productivity. The paper explains the literature review on PHC pile and pile installation process, development of prototype, field test of the prototype and its performance evaluation in terms of quality and safety as well as productivity. The results of the research will lead the further researches on the automated pile installation system.

Automation of Construction Management System for Bridge Construction Site (교량 건설현장의 시공관리 자동화 기술 연구)

  • Lee, Kee Sei;Choi, Jun Ho;Jiang, Meiling;Kang, Young Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.164-164
    • /
    • 2011
  • 최근들어 교량 건설 프로젝트는 그 규모가 방대해 졌을 뿐만아니라, 건설에 사용되는 장비 및 자재, 인력의 종류 또한 다양해 지고 있다. 이에 따라 종래 구조적 안전만을 추구하던 건설현장은 이러한 제반 요소들을 효율적으로 관리하여 경제성뿐만 아니라 시공의 효율성 까지 고려할 수밖에 없게 되었다. 따라서 건설 현장의 진도 및 자재, 인력관리는 현대 건설 산업의 주요 과제라 할 수 있다. 이에 따라 본 연구에서는 현장의 시공정보를 무선으로 송신할 수 있는 단말기 및 RFID를 이용하여 종래에 시행되던 작업을 자동화함으로써 작업의 편리성을 도모하고 이를 통하여 시간과 인력의 낭비를 줄일 수 있는 시공관리 시스템에 대한 모듈을 제안 하였다. 제안된 시스템은 3D모델을 기반으로 하여 진도 및 공비를 한눈에 알아볼 수 있는 방안을 제시한다. 사용자는 현재 진행되고 있는 공정을 3차원 모델에서 확인할 수 있으며, 현재까지 사용된 비용 및 공정률을 손쉽게 확인할 수 있다. 3D모델은 공사 시작 전 공정에 맞추어 분절된 형태로 제작되어 현장에서 송신한 위치정보가 통합관리 시스템에서 수신되면 해당 새그가 화면에 나타나게 된다. 3D모델은 공정시각화의 역할을 할 뿐만 아니라 각 새그에는 사용된 자재의 종류나 수량등이 DB화 되어 있어, 실시간으로 공사에 사용된 물량을 산출 할수 있도록 한다. 시공정보의 수신은 각 자재에 부착한 RFID태그를 직접 읽어서 송신하거나, 작업자가 시공상황을 단말기를 통하여 직점 송신함으로써 이루어지게 된다. 수집된 시공정보는 3D모델과 연계됨과 동시에 통합관리 시스템에 내장된 DB와 연결되어 사용 자재 및 물량에 대한 비용산출에 중요한 역할을 하게 된다. 현재 우리나라의 교량 시공 현장에서는 기성청구시 내역서를 기준으로 비용을 산정하게 되는데, 시공관리 통합 프로그램에서는 각 공정이 DB화된 내역서와 연계되어 3D모델에서 얻어진 물량으로 공비를 산출하는 과정이 자동으로 이루어지게 된다. 이러한 과정은 단일 현장뿐만 아니라, 공구 내의 여러 교량 현장에 대하여도 적용이 가능하므로, 방대한 현장의 공사관리에 소요되던 시간과 노력을 절감 할 수 있다. 본 연구를 통하여 현장에서 이루어지는 공사관리 작업에 대해 IT기술을 접목하여 자동화 할 수 있는 방법에 대한 알고리즘을 제시하였다. 이는 모바일 오피스 및 단말기를 이용하여 현 공정까지 사용된 물량, 인력, 장비 정보를 관리하는 한편, 현재까지 진행된 공사 내용을 3D모델을 통하여 한눈에 알아볼수 있는 교량 건설현장 통합관리 시스템의 모듈을 제공한다. 이에따라 공무 작업에 소모되는 인력 및 시간을 크게 절약 할 수 있을 것이라 판단된다.

  • PDF