• Title/Summary/Keyword: 건설기성

Search Result 92, Processing Time 0.022 seconds

1996년도 건설업 경기전망

  • 대한설비공사협회
    • 월간 기계설비
    • /
    • s.66
    • /
    • pp.30-33
    • /
    • 1996
  • 1996년도 건설공사 수주규모는 작년대비 $12.7{\%}$ 늘어난 67조 3,890억원으로 예측되었으나 증가세는 다소 둔화될 것으로 보이며 물가상승분을 제외한 실질성장률은 경제성장률보다 낮을것으로 추정된다. 건설공사 기성액은 작년보다 $19.6{\%}$ 늘어난 69조 8,100억원으로 추정되었으나 이월된 공사량의 변수가 매우 불안하여 동 금액보다 확대될 가능성이 크다 하겠다.

  • PDF

A Study on the Contractor's Liability for Defect in Public Construction Project - through comparing Civil Law with Government Contract Law - (공공건설사업 하자에 대한 수급인의 책임에 대한 연구- 민법과 국가계약법령의 비교를 통하여 -)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.69-79
    • /
    • 2001
  • Characteristics of Contactor's Defect Liability was too many discussed. But it's not clearly defined yet. Because recent Government Construction Projects are very complex and executed through long time, too many conflicts were appeared related to Contactor's Defect Liability. Therefore to analyse and to resolve the conflicts legal aspects of Contactor's Defect Liability stated in Civil Law and Government Contract Act was systematically compared. The result of this research is as follows : (1) Characteristic of Contactor's Defect must be regarded as a breach of Contract and be an incomplete contract implementation. (2) To decide the range of Damage, Characteristic of Defect must be regarded. (3) Contactor's Defect Liability must be effectual from the day of delivery. (4) Retainage must be added to secure the completion during the Contract Period and Defect Repairing Liability must be omitted in the Contract performance Security.

  • PDF

A Study on integration methodology for linking between the Owners' system and KONEPS in Public Construction Project (공공건설사업에서 발주청 내부시스템과 국가종합전자조달시스템간의 연계 방안 연구)

  • Kim, Seong-Jin;Kim, Nam-Gon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.1352-1353
    • /
    • 2012
  • 본 연구는 지방국토관리청의 시설공사의 계약 체결과 기성 준공금 지급 업무를 대상으로 발주청 내부시스템과 국가종합전자조달시스템간의 연계를 위한 업무절차 개선방안을 마련하고 관련 기능을 개발함으로서 건설사의 계약 및 기성 업무처리의 효율성을 제고하고자 한다.

법령과고시 - 건설산업기본법 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.264
    • /
    • pp.70-71
    • /
    • 2012
  • 건설산업기본법이 지난 6월 1일 개정되어 시행에 들어갔다. 이 중 대한설비건설협회가 하도급자의 권리 보호와 공생발전을 위해 그동안 국토해양부에 관련제도 개선을 지속적으로 건의한 결과 하도급자 보호를 위한 부당특약 유형 확대 등이 개정되었다. 하도급자 보호조치 강화로는 부당특약 유형 확대, 하도급공사 준공 기성 검사결과 통지 의무화, 선급금 지급기한 신설, 도급계약서 미교부시 과태료 부과 등이 개정되었고 부실 부적격 업체에 대한 제재 강화로는 건설업 등록의 결격사유 강화, 건설업 등록말소 기준 강화 등이 개정되었다. 또 건설업 신고대상 추가, 과징금 상향조정, 과태료 대상 등도 개정되었다.

  • PDF

댐 건설에 따른 환경 영향평가제도의 개선방향

  • 최용철
    • Water for future
    • /
    • v.37 no.4
    • /
    • pp.34-41
    • /
    • 2004
  • 우리나라와 같이 강우가 여름 한철에 집중되고, 지형적으로 하상계수가 큰 여건에서는 수자원의 효율적 확보와 관리를 위해 댐은 꼭 필요한 사회기반시설 중의 하나라고 생각한다. 돌이켜 보면, 한강수계에 댐이 없던 시대, 특히 소양강댐과 충주댐이 건설되지 않았던 시대에는 서울을 비롯한 한강 하류의 저지대에서의 물난리는 거의 연중행사였음을 기성세대들은 대부분 기억하고 있을 것이다. (중략)

  • PDF

Construction Progress Measurement System by tracking the Work-done Performance (내역물량 측정에 의한 건설공사진도율 산정시스템)

  • Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.137-145
    • /
    • 2003
  • The project control system based on the actual values of three objects shall be operated continuously in a timely manner. For collecting/tracking accurate actual performance data, a reasonable basis of measuring work performance and its related measuring methods are needed. Therefore, this research proposes a method of developing and operating the construction progress measurement system. The problem of the conventional method is the difficulty to construct control accounts and to define the basis of measuring the performance of each control account. Therefore, this research proposes the preferable, formal methodology that produces the progress value of the smallest work unit by surveying the installed quantities and estimates percent complete of groups of works or entire project by earned value concept. This research in connection with the hereafter research of the weight value of control accounts will contribute to apply in practice and to develop the scientific construction management technique in the construction industry. Further researches how to trend and forecast the project using the measured progress value are recommended for putting the prosed system of this research to practical use.

EVMS Database System Implementation for interworking of WBS & CBS based management in Construction Works (건설공사의 활동·내역 연동관리를 위한 기성관리운영시스템(EVMS) 데이터 모델링 및 구현)

  • Park, Hong-Tae;Lee, Bu-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.6
    • /
    • pp.2851-2858
    • /
    • 2011
  • The schedule management in construction project have been performed independently by two method, WBS base management and CBS based management, However, the integrated management model is needed according to efficiency of construction project management and introduction of new EVMS system of KOREA government. For this purpose, interworking database system is designed through efficient modeling of WBS based management data and CBS based management data and relation establishment between entities in this paper. WBS based management DB consists of 4 entities and CBS based management DB consists of 3 entity and one of the 4 WBS DB entities is used to play interworking role between WBS and CBS, Also, attributes of all entities are well defined so that data consistency, integrity and newest are guaranteed. The designed interworking database model was realized using Nex-Pert Pro and the efficiency of data interworking was proved.

Development of the Pilot Type Machine for Automation of PHC Pile Cutting Work (PHC 파일 두부정리 자동화를 위한 파일롯타입 장비의 개발)

  • Lee Jeong-Ho;Park Sang-Jun;Jeong Myung-Hoon;Kim Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.173-181
    • /
    • 2003
  • During the last few years, the use of Pre-tensioned spun high strength concrete piles(PHC pile) has been gradually increased in many construction sites. Cutting work of the concrete pile is an important task to crush a part of pile head which is compressed with more than 800$\cal{kg}f/cm^2$. It is usually performed by a crusher and three to four skilled workers. Recent analysis results of the pile cutting work reveal that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is labor-intensive work. The primary objective of this study is to propose conceptual designs for developing an automated pile cutting machine. It is anticipated that the development of the automated pile cutting machine would be able to bring improvements in safety, productivity, quality as well as cost saving.