Application of Partnering in Construction Project (건설프로젝트의 파트너링 적용에 관한 연구)

  • Chung Byoung-Hwa;Kim Sung-Chirl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.149-156
    • /
    • 2004
  • This paper presented the risk identification and the risk response of the construction project executed by mean of questionnaires/interview, significant risk factors are identified for construction contracts. The purpose of study is to improve the contract method for construction project. Therefore, partnering is increasingly being used on construction project. Partnering involves the parties to a construction project working together in an environment of trust and openness to realize the project efficiently and conflict. Partnering can bring significant benefits, including fewer adversarial relationships and increased end-customer satisfaction, to the construction industry if all parties involved in a project strive for its success.

Improvement of Non-Working Day Estimation Affected by Weather Conditions in the Construction Projects in Korea (국내 건설공사의 기후조건에 의한 작업불능일 예측방법 개선)

  • Lee, Keun-Hyo;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.100-108
    • /
    • 2006
  • Non-working days affected by weather conditions of the construction-sites have been estimated without proper data. They are usually estimated based on project engineer's own experience and intuition. As a result, they cause not only economic loss to time-adjustment but also conflicts among project participants. It becomes more difficult to predict the weather nowadays than before due to tendency of recently weather change. Therefore, this paper presents an improved estimation method for non-working days, which could minimize estimation errors. The estimation method is developed based on analysis of regional characteristics and weather conditions which affect project duration.

Problem Analysis and Improvement Strategy for Feasibility Analysis of Overseas Plant Construction Projects (해외 플랜트 건설사업의 타당성 분석 문제점 및 개선방안)

  • Lee, Won-Gyu;Park, Moon-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.3-14
    • /
    • 2010
  • This study investigated and analyzed feasibility analysis case studies, carried out by contractor of EPC LSTK projects in the planning stage to suggest the strategies to solve problems for project improvement. For this, five feasibility analysis case studies of gulf cooperation council (GCC) countries were reviewed and investigated. The results can be summarized as follows: 1) Those factors needed to be analyzed, including cost increase, project delay, quality decrease were insufficiently considered when assessing feasibility. 2) And improvement strategies for three problems mentioned above were suggested based on findings in feasibility analysis. 3) Lastly the process of the project feasibility analysis that can be applied to overseas plant construction project was suggested step by step.

Enhancement of combustion efficiency of a air-cooled combustor system with single F.D. Fan Using CFD (전산유체역학을 이용한 단일 송풍기가 적용된 공냉식 연소설비의 효율개선)

  • Kim, Min-Choul;Shon, Byung-Hyun;Lee, Jae-Jeong;Park, Hung-Suck
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.6
    • /
    • pp.460-468
    • /
    • 2021
  • This study investigated the enhanced combustion efficiency of an "air-cooled combustion system" with single F.D. fan, and performed a numerical analysis for the operation and design conditions to increase the combustion efficiency. The combustion efficiency in an actual combustor was compared before and after the structure modification. Numerical analysis for application of a single fan revealed the difficulty of forming a turbulence for circular combustion conditions. This is because the supply ratio of combustion air supplied into 2 flow paths becomes irregular in the combustion furnace due to a change in friction force and pressure in each flow path. Subsequently, two methods of supplying air into the combustion furnace were analyzed numerically to obtain the optimal combustion conditions of an air-cooled combustion system. The first method involved injecting the preheated combustion air after a 180~360 degree rotation from the outer wall, whereas in the second method, the combustion air was injected into the combustion furnace in a tangential direction after primary heat exchange outside the combustion furnace, by applying a rotatable vane structure in the combustion furnace. Results reveal that application of a single F.D. fan to the air injection into a rotatable combustion furnace is desirable for optimization of the combustion conditions for applying a duct structure having a dual cooling wall for the cooling of the outer wall of the combustion furnace, and for maintaining perfect mixing in the combustion furnace. We therefore confirmed enhanced combustion efficiency by comparing the actual combustion efficiency before and after structure modification.

전력플랜트 건설의 최신기술동향

  • KOREA ELECTRIC ASSOCIATION KOREA ELECTRIC ASSOCIATION
    • JOURNAL OF ELECTRICAL WORLD
    • /
    • s.310
    • /
    • pp.67-72
    • /
    • 2002
  • 미쓰비시(삼릉)전기 플랜트건설총괄부의 전력플랜트 건설공사는 수력$\cdot$화력플랜트 및 변전설비를 대상으로 하고 있으며, 수차$\cdot$수차발전기$\cdot$가스절연개폐장치(이하 ''GIS''라 한다), 변압기, 배전반 및 관련 제어기기 등의 설치 및 기기간의 배선공사 설계$\cdot$시공을 담당하고 있다. 최근의 전력플랜트를 둘러싼 일본의 시장환경은 신설 플랜트는 감소하고 갱신$\cdot$기기개수(개조, 수선) 공사의 비율이 커지고 있으며, 신설$\cdot$개보수 공사를 불문하고 공사품질의 유지와 공사비 저감을 위한 공법$\cdot$작업의 개선과 설계$\cdot$계획 업무의 합리화를 추진하여 왔다. (1) 기자재 개발에 의한 공법$\cdot$작업 개선 대형수력발전기의 로터조립용 다브테일키 박아놓기(타입)장치, 스테이터코일 분해(갱신)용 코일 엔드절단 및 코일뽑기공구, 터빈발전기 센터링용 유압잭, GIS 설치용 작업용발판을 개발하여 적용함으로써 공법 개선과 작업효율의 향상을 실현하였다. (2) 공사계획 방법의 개선 변전플랜트에서의 공기단축을 목적으로 하는 현지 설치 최적공정 책정방법의 개발$\cdot$적용, 또한 화력플랜트에서의 공사물량의 저감과 설계작업의 효율 향상을 목적으로 하는 케이블 배선 설계$\cdot$계획 방법의 개발 및 적용으로 설계업무의 개선, 공사비 저감을 도모하였다.

  • PDF

Optimal Period by Calculating and Appling Correction Factor based on Setting of Non-Working Days of Construction Projects (건설공사의 작업불능일 기준설정에 의한 보정계수 계산 및 적용을 통한 최적공기 산정)

  • Lee, Pil-Yoon;Lee, Seong-Won;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.669-676
    • /
    • 2018
  • Schedule management in construction work is an important step for determining the construction period. On the other hand, there is a difference between the planned schedule and execution schedule because the estimation and calculation of Non-Working days, in which possible at the design stage is not performed properly. This paper proposes a method for estimating the working days by analyzing characteristics of the major work type and estimating the Non-Working days reflecting the Chuseok and New Year Holidays, which is the closest method to the actual work in the schedule planning. By applying the correction factor of the existing method and the improved method for the same construction in the same site, improved method was reduced by 22 days (9.1%) based on the actual working days. The importance of schedule management was confirmed as an example by comparing the data before and after the application of the standard (plan). These results show that the schedule delays, which are caused by the inconsistency between actual working days calculation that had been practiced conventionally and the working days on the schedule table, can be prevented. In addition, it will help to establish a schedule plan that is closer to reality.

Evaluation of Early Compressive Strength of Concrete Using Early Strength Improvement Type Cement and Early Strength Activator (조기강도 개선형 시멘트 및 초기수화 촉진 혼화제를 사용한 콘크리트의 조기압축강도 발현특성 평가)

  • Park, Gyu-Yeon;Kim, Gyu-Yong;Choe, Gyoeng-Choel
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.322-328
    • /
    • 2014
  • In this study, revelation performance of concrete at early age according to types of cement, water reducing ratio of high performance superplasticizer and mixing of accelerator for early hydration was examined aiming for reduction of construction period of framework through securing strength at early age of concrete. It was observed that strength at early age, 5MPa in 12hours, 14MPa in 18hours, is secured by early strength improvement type cement and using promotion admixture for early hydration which are Sodium persulfate, Potassium hydroxide. Therefore cost reduction is expected to be possible in construction site by reducing construction period of frame work.

Properties of Water-based Paint mixed with Photocatalyst for Indoor Air Quality Improvement (실내 공기질 개선을 위한 광촉매를 혼입한 수성도료의 특성)

  • Choi, Byung-Cheol;Park, Chae-Wool;Kyoung, In-Su;Lee, Sang-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.29-30
    • /
    • 2020
  • As the modern society enters, the building becomes sealed and the public's interest in the environment increases, so the interest in indoor air pollution increases and the environmental pollution is raised as an important issue not only outdoors but also indoors. In addition, the emergence of sick house syndrome (SHS) has increased the interest in formaldehyde and is a cause of deteriorating indoor air quality. Accordingly, this study prepared a functional paint by incorporating a photocatalyst in an aqueous paint, and conducted formaldehyde adsorption experiments and functional evaluation. As a result of the experiment, as the photocatalyst was added, the formaldehyde adsorption performance tended to increase. In addition, as a result of measuring the impact resistance and alkali resistance according to the KS standard, there is no difference in residual cracks and cracks between the water-based paint without the photocatalyst and the water-based paint with the photocatalyst added. Therefore, it is considered that the water-based paint added with a photocatalyst can improve the indoor air quality by adsorbing formaldehyde and can be used as a functional paint because the functionality is not different from that of a general water-based paint.

  • PDF

An Introduction of Development for Next Generation Logistics Management System in Construction Project (건설산업의 물류관리 체계 개선을 위한 차세대 지능형 건설 물류관리 시스템 개발 현황)

  • Kwon, Soon-Wook;Chin, Sang-Yoon;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.99-105
    • /
    • 2008
  • For large-scale projects, supply chain management of construction materials is a key to a successful construction project. Inefficient management would cause significant loss in project cost, quality problems (and possible re-work), delayed delivery, claims, etc. On the other hand, efficient supply chain management system can reduce risks even the given project suffers from tricky details and frequent changes thanks to reduced material loss, shortened delivery time, and the quality outcome; this is a win-win situation for both clients and contractors. This paper presents a next-generation intelligent supply chain management system, which is intended to support large-scale construction projects such as urban high-rise buildings, as a strategic vision of the future construction logistics.

  • PDF

Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension (공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구)

  • Jeong, Ki-Chang;Lee, Jae-Seob;Park, Yang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.33-44
    • /
    • 2012
  • This study is as to payment improvement method of additional incidental cost to be occurred upon extension of public construction time. According to the result of analysis about the cause of non-payment of additional incidental cost of construction time extension through site examples, it was found that difficulties exist in disputes & proofing over the scope of actual cost recognition, and in this regard the result of experts opinion indicated that a construction extension pre-agreement system can be executed which agrees the scope of recognition of additional incidental cost of construction time extension once the statistical standard is clear and accurate. Accordingly, in this study, by totalling multiple sites data, calculations were implemented in terms of type of construction projects, amount of constructions, period of constructions. According to the result of calculation, the element of type of construction project and construction period appears to have none direct effect to the occurrence of additional cost of construction time extension, but direct relationship was indicated related to the contract amount element. In view of above, in this study a standard additional incidental cost of construction time extension was proposed, and presented a system improvement plan to implement the construction extension pre-agreement system.