Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing -Focusing on One Cycle Time Scheduling Mechanism of Typical Floor- (아파트 골조공사의 공기단축 및 효과적 공정운영 방안 -기준층 사이클 공정분석을 중심으로-)

  • Han Choong-Hee;Bang Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.87-96
    • /
    • 2004
  • The construction duration in apartment construction is an important factor which affects project cost. Henceforth, the time shortening is essential to retrench project cost and project risk when there adopt Five-Day Workweek and introduce apartment sales after completion of construction. Therefore, the purpose of this study is to examine closely the affecting factors on the duration of framework which forms about $40\sim50\$ percent of total time in apartment construction by analyzing the schedule mechanism of typical floor and to show the reasonable time shortening methods by case study. The shown schedule mechanism and basic schedule table can utilize as a guideline in case of scheduling of framework in the existing construction method. Also, the shown time shortening methods by three case studies will guide the direction and process of time shortening while there need time shortening in many-sided projects.

A Study on the Estimate Criteria and Influence Factors of Construction Duration of Domestic Firms -Focused on the Apartment Building Firms- (국내 건설 업체 공기산정 기준 및 영향요인 연구 -공동주택 중심으로-)

  • Kim Sun-Yeop;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.447-450
    • /
    • 2004
  • The domestic construction industry have focus on duration than construction cost. But recently it have interesting to The domestic construction industry, social requirement is changing. At the moderate speed duration has other angle of reducing cost and management of efficiency. specially Apartment building construction process is similar to other construction industry so it Is obtain a strong Point. This study on, A Target of construction industry is short duration than other it, general construction duration in summary schedule of level is studied, is based and construction duration for the point it is indicated reduction duration

  • PDF

Competitive Advantage Strategy of Construction Duration by SWOT Analysis (SWOT 분석을 통한 건설기업의 공기경쟁력 강화 전략)

  • Kim, Sun-Kuk;Lee, Hyun-Soo;Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.109-117
    • /
    • 2006
  • Recent rapid changes such as construction market reduction, lowest bidding system of construction cost, five days per week system, and post-construction sale system are inevitably accelerating the competitiveness between construction companies. Those rapid changes of construction environment require construction companies, which are main participants of construction industry, to adapt to the changes and more to lead new construction environment. However, there are many construction uncertainties which could delay construction completion. Without the proper identification of construction uncertainties, structured strategy establishment and management of construction schedule, the competitive advantages of construction duration could not be made. Thus this paper limited the research boundary to construction duration competitiveness instead of general strategy establishment. Recognizing the importance of proper calculation of construction duration, requirements of construction duration reduction and limited researches related to construction schedule strategy, we established the 25 strategies for construction duration competitivenss by internal and external construction environment analysis and SWOT analysis, and then elicited the first considerations to accomplish the strategies through concensus of all the staffs by questionnaire, brainstroming and face-to-face interviews.

A Study on the Improvement of Railway Construction Schedule Using KTX Construction Case (경부고속철도 사례분석을 통한 철도건설공기 개선에 관한 연구)

  • Yang, Yeonjong;Chung, Byunghyun
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.662-669
    • /
    • 2012
  • In 2004, KTX operated in Korea on the 5th in the world. But there are various factor on planed schedule delay of Big National Construction Project like Seoul-Busan High Speed Rail Project(Seoul-Busan HSR). For example, Often change of government policy, project management control problem of design and construction, conflict of interested party like environmental organization/resident are the main delay factors. The suggestions for improvement of the construction schedule through the Seoul-Busan HSR will help to make a new leap forward in rail construction.

A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims (해외 대형건설공사 공기지연클레임의 공기연장기간 입증방법)

  • Kim, Young-jae;Kim, Tae-kyoung;Jo, Duk-sang;Lee, Hwang-ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.165-176
    • /
    • 2015
  • Recently many Korean large-sized construction companies as well as specialty contractors have been expanding their business in the overseas market to mitigate impacts from long-term stagnation in the domestic market. Such as a result, it has been arisen as a major issue that contractors effectively manage the delays which have been commonly faced with in international mega-projects. Therefore it can be said that the ability of the delays management leads a success of project. This paper presents a review of literature for delay analysis methods such as time impact analysis(TIA) and raises practical problems to rationally substantiate the duration of extension of time(EoT) in international mega projects which have wide scope of works as well as complicated and detailed contract baseline programs by taking theoretical approaches. We suggest the two improvement concepts to substantiate the EoT claims which are effectively applicable to practical projects. The first is to sort out dominant delays among numerous delays in advance of applying a delay analysis. The second is to set up the delay sections with the advanced concept for analysing delays' effects by TIA. This study performed a case study on an actual international mega-project. to confirm the effectiveness of improvement concepts that this practical approach is applicable for the assessment of EoT. In conclusion, this paper supposes to provide practitioner in charge for an EoT claim with an advanced substantiation methodogy when they not only analyse the construction delays by using TIA, but also negotiate with stakeholders about with the assessment of EoT.

A Basis Study on Assessment Method of Influence Factors about the Shortening of the Construction Time Applying FMEA in Apartment Housing (FMEA를 활용한 공동주택 공기단축 영향요인 평가방법에 관한 기초연구)

  • Ha, Hee-Yoon;Ahn, Byung-Ju;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.383-386
    • /
    • 2007
  • Recently, The percentile of the apartment housing within the apartment construction of domestic is increasing daily. Especially the construction duration in apartment construction is an very important factor which affects project cost. Therefore the construction companies the effort to shorten construction duration. The influence factors of the construction duration are analyzed to shorten construction duration through this tendency. The shown factors are needed to assessment method efficiently. This study is to suggest a method for the assessment of influence factors about the shortening of the construction time in apartment housing based on the FMEA(Failure Mode and Effect Analysis) method.

  • PDF

A Case Study on Delay Analysis Methods in the Construction Projects (건설공사 공기지연 분석방법의 사례연구)

  • Kim, Young-Jae;Lee Woo-Chang;Hong Jung-Suk;Kim Kyung-Rai;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.129-137
    • /
    • 2004
  • When we consider the present state of construction delay claim analysis, the delay analysis methods generally used from the abroad construction industries are not applied to our industry. By reviewing the existing methods of delay analysis, this study investigated the important concepts and characteristics of the delay analysis methods. Selection of the delay analysis methods could be decided among 1)As-planned versus as-built comparison method,2)What-if method,3)But-for method.4)CPA method, and 5)DAMUDS method. In order to make clear the characteristics and mechanisms of the analysis methods, this study performed a case study.

Analysis of Actual Duration by Effecting Elements to Duration Estimate - Focused on Standard Duration of the Office Building Construction - (공기산정 영향요인별 실적공기 비교분석 - 사무소 건축공사 공기산정기준을 중심으로 -)

  • Hwang Hyo-Sang;Kim Kyung-Rai;Suh Sang-Wook;Kim Chang-Duk;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.84-93
    • /
    • 2002
  • It is important to reduce construction duration in private sales and lease business for management of cash now in the owner's aspect. However, because the concept of standard duration hasn't been established in the domestic construction industry, it is difficult to present the standard of duration estimate. To solve this problem, this paper (1) grasped the effecting elements considered in the duration estimate through referring the existing literature related to the schedule management, (2) accomplished a comprehensive research on actual duration based on office buildings through the questionnaire survey and the expert interview, (3) presented the collected research data analyzed by effecting elements as standard duration, (4) compared standard duration with actual duration of countries advanced in construction projects as well as analyzed them, and then (5) raised the necessity of duration reduction in the domestic construction industry.

Improvement of Apportioning Responsibility for the Time Extension in Construction Projects (건설공사 공기연장 책임구분의 문제점 및 개선방안 제시)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.60-67
    • /
    • 2007
  • Cases of the time extension have continuously transpired in the public construction projects. The potential of economical loss and claims is increased because the concerned parties such as an owner or a contractor have not properly performed their own responsibility for the time extension. Therefore, this paper aimed to improvement of apportioning responsibility for the time extension in construction projects.

  • PDF

A Study on the Reformation of the Contract Time Extension Process in the Public Construction projects (공공건설사업에서 계약기간 연장처리방법 개선에 관한 연구)

  • Cho Young-Jun;Lee Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.81-89
    • /
    • 2005
  • Delay schedule coming about duration extension is happening essentially because public construction project consist of many sub contractor. The method which can calculate delay day is suggested by many studies in case of happing delay schedule, but It is difficult to apply to real construction project because there is no mention about the control of The law of contract according to delay schedule. The law of Contract which is cost of account has more uncertain problem than FIDIC condition of contract. This study suggests method which can make extension of duration procedure clear in case of happing the reason of design change related with activity duration during carrying on construction, and a submission process of the reason of duration extension and modify schedule making way about section which is basis of calculating contract amount clear.