• Title/Summary/Keyword: 건물 안전 확인

Search Result 126, Processing Time 0.025 seconds

A Study on the Fire Spread Risk of Resident Buildings With Pilotis (필로티 건물 이격거리에 따른 화재확산 위험성 연구)

  • Choi, Seung-Bok;Choi, Doo-Chan;Choi, Don-Mook
    • Fire Science and Engineering
    • /
    • v.31 no.4
    • /
    • pp.103-110
    • /
    • 2017
  • With the common tendency in the accordance with the trend, low-stories built edifices that are Pilotis-oriented structured exponentially and constantly increasing its number of buildings. It inevitably contains its risks of facing conflagrations as most of its part is used as parking lots. In the parking lots, the length of the flame has a heavy-weighted possibility that it would get increased because the heat release rate gets relatively high due to the vehicle insulation. Following on top of that, due to the nature of the Pilotisconsisting of pillars, there is a risk of flame spread to the adjacent building if the same Pilotis-structured buildings are adjacent to each other, if the flame spreads to the surroundings due to the influence of the wind. Because the most of the pilotis-structured-buildings have this entrance that makes the residents be able to enter, if the entrance were plugged the resident get a serious risk of a poisonous gas and a flame. Therefore, if the parking-lots of the pilotis-structured-buildings are adjacent to each other it requires a space to prevent the place from the spread of flame. This research studied how far is appropriate to prevent flame spreading with FDS. As a result, the study found that the distance at least 3.0 m is required.

Pool proof safety through the old apartments redesigned to ensure safety study (노후아파트 안전관리를 통한 풀 푸르프 재설계로 안전성 확보에 관한 연구)

  • Baek, Dong Seung;Lee, Jong Hyun;Park, Sung Bong
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.3
    • /
    • pp.280-287
    • /
    • 2018
  • Purpose: The study is based on comparative review of the actual inspection of apartments and aims at proposing easy accessible and useful safety control which is enhanced from pre-existing safety apparatus. Method: On the basis of preceding research data of apartment buildings, the study presents reported problems and real condition of apartment buildings based on Housing Related Legislation and Housing Act. Results: Safety management plans and safety inspection for buildings are needed. When conducting a safety check, traceability management system for internal/exterior facilities should be available. Most important of all, 24 hour a day of self-management system for elevators, fire protection, and security cameras is necessary. Conclusion: Through the study, there should be a process of confirming problems of building security management; such as checking the management condition through apartments' resident representatives, and seeking improvement measures.

A Study on Facilites Safety of Long-Term Care Facilities for Elderly :Focused on the Factual Survey of Seoul Metropolitan Area (장기요양시설의 노인보호를 위한 시설안전에 관한 연구 : 수도권 시설안전 실태조사를 중심으로)

  • Moon, Yongpil
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.10
    • /
    • pp.308-325
    • /
    • 2020
  • This study examines factual facilites safety of long-term care facilities for eldery, for improvement of Korean policy. So, This study reviewed policies of facilites safety of long-term care facilities on main OECD countries. We analyzed factual survey of facilites safety of long-term care facilities in Seoul metropolitan area. The results of the study were as follows: First, There were differences of law and rule of facilites safety of long-term care facilities in comparison with those of social welfare facilities, child day-care center, hospital. Second, it was the result of location condition analysis. Long-term care facilities in the Seoul metropolitan area were located on more than six floors of buildings. The location conditions of private facilities are weak compared to those of corporations and local governments. Third, there were the result of internal structure of facilities. Overall, the placement status was insufficient. For instance, there are smokeproof masks/fireproof blankets, smoke windows(fire safety windows), smoke smothering. In addition, there were places where legal essential installation structures were insufficient. Private facilities were generally insufficient in facility structures compared to those of local governments and welfare corporations. Fourth, there were the result of safety management. It was confirmed that private facilities were insufficient compared to local government facilities. For instance, there are safety management analysis, response manuals, fire preparedness training, etc. Finally, implications and future directions policies of facilites safety of long-term care facilities were discussed based on the finding of the study.

Study on safety performance evaluation of stationary SOFC stack (건물용 고체산화물연료전지 스택 안전성능평가 연구)

  • Park, Tae Seong;Lee, Eun Kyung;Lee, Seung Kuk
    • Journal of Energy Engineering
    • /
    • v.27 no.4
    • /
    • pp.1-12
    • /
    • 2018
  • The code and standards related to fuel cells were analyzed to derive the SOFC(Solid Oxide Fuel Cell) stack safety performance evaluation items and evaluation methode. Safety performance evluation of the SOFC stack was tested by quoting derived test items. The stack used in the test is an anode-supported type 2 Cell stack (Active surface area : 220cm) manufactured by MICO Inc, and SOFC stack safety performance evaluation system used for the test is self-manufactured. We conducted a leakage test, current voltage characteristic test, rated output test, and power response characteristics test. In the safety performance evaluation test, the stack showed no gas leakage, the maximum output and rated output was recorded to 65.6 W(1.41 V, 46.5 A, $422mA/cm^2$), 62.3 W(1.57 V, 40 A, $363mA/cm^2$). In the power response characteristics test verified that the output is kept stable within two seconds. At the maximum load (40 A) and the minimum load (8 A), the output was recorded 62 W and 16W in $750^{\circ}C$. This study will contribute to the universalization and to provide much safe environment of operating the solid oxide fuel cell system.

A Study on the Selection of Hydrogen Refueling Station Locations within Military Bases Considering Minimum Safe Distances between Adjacent Buildings (인접 건물 간 최소 안전거리를 고려한 군부대 내 수소충전소 위치선정 연구)

  • Dong-Yeon Kim;Hyuk-Jin Kwon
    • Journal of Internet Computing and Services
    • /
    • v.24 no.6
    • /
    • pp.171-180
    • /
    • 2023
  • Hydrogen energy technology is gaining importance in the era of the Fourth Industrial Revolution, offering military advantages when applied to military vehicles due to its characteristics such as reduced greenhouse gas emissions, noise, and low vibration. Korea's military has initiated the Army Tiger 4.0 plan, focusing on hydrogen application, downsizing, and AI-based smart features. The Ministry of National Defense plans to collaborate with the Ministry of Environment to expand hydrogen charging stations nationwide, anticipating increased deployment of military hydrogen vehicles. However, considering the Jet Fire and VCE(Vapor Cloud Explosion) nature of hydrogen, ensuring safety during installation is crucial. Current military guidelines specify a minimum safety distance of 2m from adjacent buildings for charging stations. Scientific methods have been employed to quantitatively assess the accident damage range of hydrogen, proposing a minimum safety distance beyond the affected area.

A Study on the Fire Life Safety Improvement in Deteriorated Buildings - Focus on the Jongro Goshiwon Fire Analysis (노후 건축물의 화재인명안전 개선방안에 관한 연구 - 종로 고시원 화재사고의 분석을 중심으로 -)

  • Choi, Doo Chan
    • Fire Science and Engineering
    • /
    • v.32 no.6
    • /
    • pp.63-68
    • /
    • 2018
  • In this study, to recognize the limitations and problems of fire safety in existing deteriorated buildings in Korea, and to analyze the fire case of Jongno Gooshiwon, the fire life safety assessment was performed and analyzed through fire egress simulation and analyzed the domestic and foreign related codes and regulations. In order to secure the fire safety of existing deteriorated buildings, it is necessary to adopt the systematic introduction and application of fire safety performance evaluation of buildings based on quantitative and objective indicated method for performance maintenance and management for fire life safety.

Earthquake Resistant Design of a Steel Framed Structure in Low Seismic Regions Based on the Dynamic Behaviour (동적거동에 기초한 약진지역 철골뼈대구조물의 내진설계)

  • 국승규
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.5 no.2
    • /
    • pp.59-66
    • /
    • 2001
  • 구조물 내진설계의 개념은 기존요구조건이라는 조항으로 시방서에 규정되어 있으며 구조물이 지진발생시에 안전성과 경제성을 최대한 확보할 수 있으며 비선형시간 이력해석을 수행하여 자진시의 동적거동을 기술함으로써 확인할 수 있다. 내진설계에 보편적으로 적용하는 응답스펙트럼해석법은 선형해석법으로 구조물의 비선형동적거동의 영향을 거동계수로 반영하므로 파괴메카니즘 및 기본 요구조건의 만족여부를 거동계수를 구하는 과정으로 결정할 수 있다. 이 연구에서는 내진설계방식에 의해 설계된 약진지역에 의한 화학공장건물의 모델인 3차원 철골뼈대구조물을 선정하고 거동계수를 결정하는 과정을 수행하여 지진시의 동적거동을 확인하였다. 이 연구의 결과, 현 시방서의 응답스펙트럼해석법에 적용되는 거동계수는 강진지역의 구조물의 경우 기능성 및 안정성 한계를 제시하지만 약진지역 구조물의 경우는 실제 동적거동과 무관하다는것과 약진 지역에 위치한 구조물의 내진설계에는 시방서가 제시한 내진설계방식을 적용하는 것이 주요한 사항임을 확인하였다.

  • PDF

Analysis on Risk Factors of Reactor Containment Building Construction using Analytic Hierarchy Process (계층 분석 방법을 이용한 원자로 격납 건물 시공의 리스크 요인 분석)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.425-431
    • /
    • 2015
  • Since the construction of Kori 1 was completed in 1978, the construction projects for nuclear power plant are increasingly expanded into domestic and foreign sites. However, some of construction sites of nuclear power plant have the problems of process delay and cost loss due to lack of ability of risk management. The construction of reactor containment building in nuclear power plant is especially dotted with many risk factors because it needs professional skills and large-scale resources due to long duration compared with different construction phase. Therefore, it needs the study that analyzes risk factors expected in construction of reactor containment building and suggests way of stable performance of projects. So, this study assesses risk factors of construction of reactor containment building. For the objectives, this study uses survey for group of minority specialists of 36 experts. The risks of 24 factors is classified by criterions of process, cost, safety, and quality and the results of assessment is analyzed by analytic hierarchy process. As the results, the importance and priority of risk factors classified by each criterion were calculated and the applicability of analytic hierarchy process was identified to analyze risk factors of nuclear power plant construction. These will be baseline data for risk management in construction phase of reactor containment building.

Seismic Performance of Reinforced Concrete Shear Wall Buildings with Piloti (필로티를 갖는 철근콘크리트 전단벽식 건물의 내진성능)

  • Kwon Young-Wung;Kim Min-Su
    • Journal of the Korea Concrete Institute
    • /
    • v.17 no.4 s.88
    • /
    • pp.587-594
    • /
    • 2005
  • The purpose of seismic design is to ensure the serviceability of buildings against earthquake, which might be occurred during the service life of buildings, and to minimize the loss of life by preventing their failure under strong earthquake. The lack resistance of walls resulting from a tendency toward high-rise apartment buildings with shear walls and use of piloti would lead to a concentration of inelastic behaviors in their weak story. In this study, the seismic performance of reinforced concrete shear wall buildings haying piloti was analyzed by using the evaluation techniques which was proposed by FEMA 273 and ATC-40. The results from comparison with these two techniques are summarized as follows.; The results of elastic analysis method for seismic performance evaluation show that the effect of piloti and building height decrease performance index. In case of shear wall building, the state of insufficient shear stress governs their overall performance and it becomes evident in the case of the buildings with more than 25 stories. For the buildings of piloti, the change of mass, weak story, as well as insufficient shear stress, decrease the performance index rapidly compared with the performance index of the buildings without piloti. The results, obtained from the nonlinear static analysis using capacity spectrum method, indicate that the performance Point increases for the structure having Piloti and high story. Also, deformation limits of buildings satisfy the allowable criteria at the life safety level, but the immediate occupancy level is exceeded in buildings which have more than 25 stories.

Seismic Performance Evaluations of RC Bearing Wall Systems with Coupling Beams - For Apartment Buildings in 1990s (연결보가 있는 철근콘크리트 내력벽시스템의 내진성능평가 -1990년대 공동주택을 중심으로-)

  • Lee, Young-Wook;Chae, J.-Yong
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.15 no.4
    • /
    • pp.23-31
    • /
    • 2011
  • To investigate the performance of apartment buildings which were built in the 1990s and which have RC bearing wall systems with coupling beams, construction drawings of 13 buildings were collected and analyzed. To evaluate the seismic performance, FEMA 356 and FEMA 440 were selected as guidelines. For the demand curve, the seismic design spectrum in KBC 2009 is used. For each building, the performance points for life safety and the collapse prevention state are calculated. It was found that 9 out of 13 buildings (about 70%) showed damage more severe than the collapse prevention level at the performance point and more damage could be seen at the coupling beams than the walls. However, the story drift limit of FEMA 356 was satisfied for all buildings. Through the analysis of performance points, it was shown that the spectral acceleration has an inverse relationship with the natural period.