A study on the development and performance evaluation of duct coupling for the minimized leakage of temporary ventilation duct (공사 중 환기덕트 누풍 최소화를 위한 접속부 개발 및 성능평가 연구)

  • Jo, Hyeong-Je;Jun, Kyu-Myung;Min, Dea-Kee;Kim, Jong-Won;Beak, Jong-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.145-160
    • /
    • 2018
  • Long subsea tunnel is subject to many restrictions in terms of spatial limitation when vertical or inclined shafts are built for tunnel ventilation. So, the construction of some artificial island is required to provide ventilation. But, because of construction difficulty and cost increase, it is necessary to minimize the artificial island construction. As a result, ventilation distance become longer and supply airflow becomes excessive due to air leakage, So, duct mounting for temporary ventilation is impossible or fan pressure and power increase exponentially. Therefore, in order to build a long subsea tunnel, it is necessary to overcome these practical problems and to develop technical solution that can keep the comfortable condition of tunnel environment during construction. In previous study, we have found that air leakage is the key factor in solving these problems and experimental results show that the new connection method has a leakage rate of about $1.46mm^2/m^2$ (Jo et al., 2017). In this study, we present the experimental results of the measurement of the leakage rate of the prototype with the new connection method, and analyze experimentally the improvement of the leakage rate when applying the flexible cover inside the duct to improve the leakage performance of the existing connection method.

On-Land Seismic Survey of Korea (한국의 육상 탄성파탐사)

  • Kwon, Byung-Doo
    • Economic and Environmental Geology
    • /
    • v.39 no.4 s.179
    • /
    • pp.441-450
    • /
    • 2006
  • The on-land seismic survey in Korea was begun in mid-1960s. Kim et al.(1967) of Korea Geological Survey reported on the result of gravity and seismic reflection surveys conducted in the Pohang area for the period of 1963-64 to assess its possibility of oil entrapment. Hyun and Kim (1966) carried out a refraction survey on the tunnel wall. Since then, the KGS geophysicists had conducted seismic surveys on Kyungsang sedimentary basin as a main project for several years. In 1970s, on-land seismic surveys had been conducted for various purposes such as site investigation for the nuclear power plants and industrial complex, exploration for ground water, mineral resources and underground tunnel. The first reflection survey with CMP acquisition was attempted in 1978 by using a digital recording system. But most of on-land seismic surveys had employed the refraction method until 1980s. In 1990s, high resolution reflection and various borehole seismic surveys such as tomography, uphole, downhole, cross-hole methods have been attempted by universities and engineering companies. The applications of on-land seismic surveys have been enlarged for both academic and industrial purposes such as investigation of geologic structure of the fault and tidal flat area, construction of highway, railroad and dam, geothermal energy and mineral resource exploration, environmental assessment for waste disposal sites and archaeological investigations. In 2002, the first crustal seismic survey was carried out on the profile of 294km length across the whole peninsular. It is expected that the advanced technology and experience acquired through offshore seismic surveys, which have been conducted in continental shelf of Korea and foreign oil fields, will stimulate the more active on-land seismic explorations.

A Study on the Optimal Installation of Ducted Fan Ventilation System in Long Mine Airways - Focused on the Wall Separation Distance and the Gap Length between Ducts (장대 광산갱도내 풍관 접속 통기선풍기 최적 설치 방안연구 - 벽면과 풍관간의 이격거리 중심으로)

  • Lee, Chang Woo;Nguyen, Van Duc
    • Tunnel and Underground Space
    • /
    • v.27 no.1
    • /
    • pp.12-25
    • /
    • 2017
  • In local underground mines heavily depending on the natural ventilation, ducted fan auxiliary ventilation system is strongly recommended instead of the total mine ventilation system requiring large capital and operating costs. Optimizing the installation of ducted fans in series in long large-opening mines is required to assure the economy and efficiency of the ventilation system. The two most critical design parameters for optimization are the wall separation distance and gap length between adjoining ducts. This study aims at deriving the optimal values for those two parameters concerning the economic and environmental aspects through the extensive CFD analysis, which minimizes pressure loss, leakage and entrainment of the contaminated air in the gap space. The ranges of the wall separation distance and gap length for study are selected by taking into consideration the existing recommendations and guidelines. The ultimate goal is to optimize the auxiliary ventilation system using ducted fans in series to provide a reliable and efficient solution to maintain clean and safe workplace environment in local long underground mines.

A study on the characteristics for temporary ventilation of long subsea tunnels - focused on the current situation and improvement requirements (초장대 해저터널의 공사중 환기 특성에 관한 기초연구 - 현황 및 개선필요사항 중심)

  • Jo, Hyeong-Je;Chun, Kyu-Myung;Kim, Jong-Won;Lee, Ju-Kyung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.2
    • /
    • pp.153-166
    • /
    • 2015
  • Long subsea tunnel to be built below the seabed, as compared to the general railway tunnel, is subject to many restrictions in terms of spatial limitation when vertical or inclined shafts are built for the purpose of ventilation and fire safety. So, the construction of some artificial island is required to provide ventilation. But, because of construction difficulty and cost increase, it is necessary to minimize the artificial island construction. The longer ventilation distance is, the more fresh air requirement is needed. When supply airflow becomes excessive, duct size is restricted by the limitations of structure clearance and fan pressure and power increase exponentially. Therefore, in order to build a long subsea tunnel, it is necessary to overcome these practical problems and to develop technical solution that can keep the comfortable condition of tunnel environment during construction. In this study, as on ventilation method development suitable for long subsea tunnel, through comparison of temporary ventilation capacity calculation methods during construction phase, domestic and abroad, the application of Swiss SIA 196 code is found suitable for long subsea tunnel. And, through experiment on leakage of the duct connector, we confirmed that the leakage ratio per 100 m of domestic duct connection type is between 1.5~3.0%. Based on S-class duct of SIA 196 code, ventilation distance is 10.2 km, So, ventilation distance can be longer if duct connection method is improved. So, we confirmed that the improvement of leakage ratio is key issue in the construction-phase ventilation of long subsea tunnel.

A Study on Optimum Ventilation System in the Deep Coal Mine (심부 석탄광산의 환기시스템 최적화 연구)

  • Kwon, Joon Uk;Kim, Sun Myung;Kim, Yun Kwang;Jang, Yun Ho
    • Tunnel and Underground Space
    • /
    • v.25 no.2
    • /
    • pp.186-198
    • /
    • 2015
  • This paper aims for the ultimate goal to optimize the work place environment through assuring the optimal required ventilation rate based on the analysis of the airflow. The working environment is deteriorated due to a rise in temperature of a coal mine caused by increase of its depth and carriage tunnels. To improve the environment, the ventilation evaluation on J coal mine is carried out and the effect of a length of the tunnel on the temperature to enhance the ventilation efficiency in the subsurface is numerically analyzed. The analysis shows that J coal mine needs $17,831m^3/min$ for in-flow ventilation rate but the total input air flowrate is $16,474m^3/min$, $1,357m^3/min$ of in-flow ventilation rate shortage. The temperatures were predicted on the two developed models of J mine, and VnetPC that is a numerical program for the flowrate prediction. The result of the simulation notices the temperature in the case of developing all 4 areas of -425ML as a first model is predicted 29.30 at the main gangway 9X of C section and in the case of developing 3 areas of -425ML excepting A area as a second model, it is predicted 27.45 Celsius degrees.

Stability Analysis of Multiple Thermal Energy Storage Caverns Using a Coupled Thermal-Mechanical Model (열-역학적 연계해석 모델을 이용한 다중 열저장공동 안정성 분석)

  • Kim, Hyunwoo;Park, Dohyun;Park, Eui-Seob;Sunwoo, Choon
    • Tunnel and Underground Space
    • /
    • v.24 no.4
    • /
    • pp.297-307
    • /
    • 2014
  • Cavern Thermal Energy Storage system stores thermal energy in caverns to recover industrial waste heat or avoid the sporadic characteristics of renewable-energy resources, and its advantages include high injection-and-extraction powers and the flexibility in selecting a storage medium. In the present study, the structural stability of rock mass pillar between these silo-type storage caverns was assessed using a coupled thermal-mechanical model in $FLAC^{3D}$. The results of numerical simulations showed that thermal stresses due to long-term storage depended on pillar width and had significant effect on the pillar stability. A sensitivity analysis of main factors indicated that the influence on the pillar stability increased in the order cavern depth < pillar width < in situ condition. It was suggested that two identical caverns should be separated by at least one diameter of the cavern and small-diameter shaft neighboring the cavern should be separated by more than half of the cavern diameter. Meanwhile, when the line of centers of two caverns was parallel to the direction of maximum horizontal principal stress, the shielding effect of the caverns could minimize an adverse effect caused by a large horizontal stress.

Case Study on the Type of Subsidence using Seismic Refraction Survey (탄성파 굴절법을 사용한 지반침하 형태분석 적용사례)

  • Yun Sang-Ho;Ji Jun;Lee Doo Sung
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2000.09a
    • /
    • pp.132-146
    • /
    • 2000
  • Seismic refraction survey was performed for 10 lines along NE-SW and NW-SE directions above Nampoong gallery at Makyo-ri, Dogye, Samcheok, Kangwon-do. 48 geophones were laid in line with the interval of 1m, and a 5Kg hammer was used as a source at 5 points for each line. Data processing was done using reciprocal time method, GRM, and traveltime tomography which utilizes wavefront expansion method for forward process and STRT for inversion. The result shows that the first layer has its lower boundary between 3.49m and 8.88m. The P-wave velocity of the first and the second layer were estimated as 270${\~}$360m/s and 1550${\~}$1940m/s respectively. When the boundary of the first and second layer is smooth enough and the velocity difference is large enough, GRM has little advantage over reciprocal time method. The result of reciprocal method and traveltime tomography shows consistency. The northeast part of the boundary has syncline structure, which is similar to the topography above. This implies that the collapse of the cavities of Nampoong gallery result in the subsidence of the ground surface. The subsidence is in progress across the Youngdong railroad, therefore a proper reinforcement work is required.

  • PDF

Chemical Components of Solidago virgaurea spp. gigantea, Aster glehni var. hondoensis and Aruncus dioicus var. kamtschaticus Grown on Ulleung Island, Korea (울릉도산 울릉미역취, 부지갱이 및 삼나물의 화학성분 특성)

  • Choi, Mal-Gum;Chung, Hun-Sik;Moon, Kwang-Deog
    • Food Science and Preservation
    • /
    • v.15 no.4
    • /
    • pp.576-581
    • /
    • 2008
  • The chemical components of the wild vegetables Solidago virgaurea spp. gigantea, Aster glehni var. hondoensis, and Aruncus dioicus var. kamtschaticus grown on Ulleung island, Korea were investigated. In dried powders of these three wild vegetables, the contents of moisture, crude protein, crude lipid, crude fiber, and crude ash were 3.77-5.72%, 15-29%, 3.50-6.68%, 4.00-6.01%, and 8.70-10.54%, respectively. There were differences in the levels and nature of organic acids in the vegetables; the major organic acids were succinic acid, citric acid, and malonic acid. The major free amino acids in the vegetables were glutamic acid, aspartic acid, arginine, and phenylalanine. Riboflavin contents were 90 mg% in Aruncus dioicus var. kamtschaticus and $2{\sim}3$ mg% in the other vegetables. The thiamin contents were 113 mg% in Aster glehni var. hondoensis, 85 mg% in Aruncus dioicus var. kamtschaticus, and 71 mg% in Solidago virgaurea spp. gigantea. The major fatty acids in the three vegetables were linolenic acid, linoleic acid, and palmitic acid; 60% of total fatty acid was linolenic acid. Catechins were present at 5.37 mg% in Aruncus dioicus var. kamtschaticus, 2.46 mg% in Solidago virgaurea spp. gigantea, 1.29 mg% in Aster glehni var. hondoensis.(-) ECC was detected in only Aruncus dioicus var. kamtschaticus. The contents of Ca, P, and Na in the three vegetables were higher than the contents of other minerals.

A study on the air leakage performance improvement of duct coupling for temporary ventilation of long subsea tunnel (초장대 해저터널의 공사중 덕트 접속부의 누풍 성능 개선에 관한 연구)

  • Jo, Hyeong-Je;Min, Dea-Kee;Kim, Jong-Won;Lee, Ju-Kyung;Beak, Jong-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.319-333
    • /
    • 2017
  • The construction of long sub-sea tunnel does not provide the favorable condition for the installation of ventilation system to be used during construction due to the constrained construction space. For the ventilation system required during construction, the artificial island where ventilation shaft is located is constructed at some location along the sub-sea tunnel route, which requires a high construction cost. Therefore, it is intended, as much as possible technically, to minimize the construction of artificial island. However, this requires a longer distance between ventilation shafts, there-by causing increased air leakage at the ventilation duct connection points due to the higher fan pressure being required to deliver ventilation air. Previously the air leakage was studied as an important issue. In this study experiments were carried out to develop the improved duct connection method considering various conditions such as, tunnel length, etc. Additionally, its performance results with leakage rates are shown and compared to the "S" class leakage rate of SIA. As a result, the new duct coupling type of improved method is analyzed as applicable to such a 30 km long tunnel with the leakage rate of $1.46mm^2/m^2$, which is better performance than SIA leakage rates.

Study on Recovery of Au from Flotation Tailing of Gold (금(金) 浮選(부선) 광미(鑛尾)로부터 금(金)의 회수(回收)에 관한 연구(硏究))

  • Shin, Seung-Han;Kang, Hyun-Ho;Hong, Jong-Won;Lee, Jin-Soo;Park, Je-Hyun;Han, Oh-Hyung
    • Resources Recycling
    • /
    • v.19 no.6
    • /
    • pp.61-69
    • /
    • 2010
  • S.M.C (DSME), only operating gold mine in Korea, is processing about 160 ton/day to recover gold and more than 150 ton/day of tailing is produced. Some portion of the tailings are used as a filler material after drying, but most of them are stored on the tailing dam. As a result of chemical analysis by a fire assay method, it contained Au 1.5~2.0 g/ton and 225~300 g per day of gold is getting discarded. It is urgent to develop a technology to recover and reutilize Au. In the present study, flotation tests were carried out to recovery gold for the tailings. Test results show that products with gold grade 21.31 g/ton(Au grade) and 62.73% (Au recovery) were obtained under the optimal conditions including KAX addition rate 97.2 g/ton, frother AF 65 (0.248 l/ton) and depressant sodium silicate (4 kg/ton), it's possible to recover one of the most valuable metal Au, by re-feeding to rougher flotation.