• Title/Summary/Keyword: 강지보

Search Result 83, Processing Time 0.026 seconds

A Study on the Rock Mass Classifications and Reinforcement in Unconsolidated Sedimentary Rock Tunnel (미고결 퇴적암 터널에서의 암반분류 및 보강에 관한 연구)

  • Kim, Nakryoong;Jeong, Sangseom;Ko, Junyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.655-666
    • /
    • 2013
  • A number of highway projects are in progress in Korea to accommodate increasing transportation demands. As the highway route becomes more complex, some projects include tunneling through unconsolidated sedimentary rock. Since an unconsolidated sedimentary rock mainly consists of rock and ground mass, the behavior and characteristics in unconsolidated sedimentary rock tunnel are quite different from typical rock tunnel. However, construction case histories and rock classifications method on unconsolidated sedimentary rock tunnel had not been developed or studied domestically. Consequently the case studies and rock classification system for unconsolidated sedimentary rock are required to better understand its behavior for tunneling. In this study, rock mass classification method is proposed to identify unconsolidated sedimentary rock based on point load and slake durability tests. Based on this, the proposed method of unconsolidated sedimentary rock can be applied well through comparisons with the results of convergence measurement.

Evalution for Mechanical Property and Durability of Miner's Shotcrete (광산용 숏크리트의 역학적 특성 및 내구성 평가)

  • Nam-Gung, Kyeong;Ma, Sang-Joon;Lee, Kyeo-Re;Yun, Kyong-Ku
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.2
    • /
    • pp.1461-1468
    • /
    • 2015
  • Mostly mine support(Rock bolt and Support) which is currently general for reinforcements of a large scale tunnel is applied, Some executing a reinforcement to Poor ground by cast-in-place shotcrete. However On domestic mine conditions that couldn't having every time after mine tunnel excavation, it couldn't ensure the field batch plant which is a fixed in an issue of economies and site security, constructing it by supply gets from shotcrete materials combined in neighborhood ready mixed concrete manufacturing plants. carried shotcrete in ready mixed concrete manufacturing plants as migration length and time are falling off in quality. But, it is difficult for construction quality control By quality control arbitrariness absence at on-scene. In the present study, carry out Laboratory Test by kinds and percentages of accelerating agent for evalution of Mechanical Property and Durability of Shotcrete.

Stability Estimation of the Pillar between Twin Tunnels Considering Various Site Conditions (다양한 현장조건을 고려한 병설터널 필라의 안정성평가)

  • Kim, Ju-Hwan;Kim, Jong-Woo
    • Tunnel and Underground Space
    • /
    • v.27 no.2
    • /
    • pp.109-119
    • /
    • 2017
  • A lot of twin tunnels were modelled with different pillar widths, rock mass classes and stress ratios in order to consider various site conditions, and the stabilities of the pillars were estimated by numerical analyses and scaled model tests. The strength-stress ratios of the pillar were obtained from three different methods which were using the stresses appeared at the middle point, the whole average and the left/right edges of the pillar. The strength-stress ratio of the pillar edges showed relatively conservative values among them, and it was also practically consistent with the tunnel excavating steps comprising the construction sequence analyses which included the partial excavation and the support system. Scaled model tests were also performed to investigate the tunnel stability, where it was found that cracks were progressively generated from the pillar edges toward the middle point of the pillar. Therefore, in order to both prevent the local damage of pillar and conservatively estimate the tunnel stability, it was thought to be an appropriate method using the strength-stress ratio obtained from the left/right edges of the pillar.

석탄층을 협재한 연암을 대상으로 한 도로터널 시공사례

  • 김주화;김선기;신경진
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2002.10a
    • /
    • pp.1-15
    • /
    • 2002
  • 동복터널의 현장지질은 편마암과 석탄층(Coal Beds)이 협재된 암질이 매우 불량한 편암으로 구성되어 있으며, 설계 시에는 석탄층의 발달이 확인되지 않아 그 영향을 충분히 고려되지 않았다. 석탄층(두께 2~8m)은 편암의 Rock Cleavage와 같은 방향과 45~55도의 경사를 가지며 pinch out and swelling 형태로 발달이 불규칙하다. 하행선굴착 중 약 290m구간에 걸쳐 석탄층이 나타났으며, 90m 구간은 천단 및 측벽부에서 집중 발달되어 쳐대일변위가 20mm이상인 지점이 발생하는 등 상반굴착 시 111.2mm의 수평방향 내공변위가, 하반굴착 시에는 최대 127.8mm의 내공변위가 발생하였고 하반관통이후 수렴되었다. 내공변위 과다발생에 대한 대책으로 지보타입을 하향 조정하였고 측벽부는 하향 록볼트를 포함한 추가록볼트 보강을 실시하였다. 한편 터널 바닥부의 석탄층은 도로포장 후 침하문제가 예상되어 인버트를 기존 강지보공과 H-beam으로 연결.폐합한 후 콘크리트로 치환(140m구간)하여 추가변위를 최소화하였으며 무근콘크리트로 설계된 라이닝은 철근콘크리트 라이닝으로 변경 시공하였다.

  • PDF

Concrete-Panel Retaining Wall anti-crack sleeve inserted (균열방지 슬리브가 매설된 패널식 옹벽)

  • Jang, Sung-Ho;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.3
    • /
    • pp.345-349
    • /
    • 2019
  • In Korea, the mountainous area occupies more than 70% of the whole country, cutting of earth slope that cuts a part of the ground surface is widely used when building infrastructures such as road, railroad, and industrial complex construction. In recent years, regulations on environmental damage have become more strict, and various methods have been developed and applied. Among them, Concrete-Panel Retaining Wall technique is actively applied. Concrete-Panel Retaining Wall is a method to resist horizontal earth pressure by forming a wall by attaching a precast retaining wall to the front of the support material and increasing the shear strength of the disk through reinforcement of the support material. Soil nailing, earth bolt, and ground anchor are used as support material. Among them, ground anchor is a more aggressive reinforcement type that introduces tensile load in advance to the steel wire, and a large concentrated load acts on the front panel. This concentrated load is a factor that creates cracks in the concrete panel and reduces the durability of the retaining wall itself. In this study, steel pipe sleeves and reinforcements were purchased at the anchorage of the panel to prevent cracks, and by applying bumpy shear keys to the end of the panel, the weakness of the individual behavior of the existing grout anchors was improved. The problem of degraded landscape by exposure to front concrete of retaining wall and protrusion of anchorage was solved by the production of natural stone patterns and the construction of sections that do not protrude the anchorage. In order to verify the effectiveness of anti-crack sleeves and reinforcements used in the null, indoor testing and three-dimensional numerical analysis have been performed, and the use of steel pipe sleeves and reinforcements has demonstrated the overall strength increase and crack suppression effect of panels.

Determination of equivalent elastic modulus of shotcrete-tetragonal lattice girder composite (사변형 격자지보재-숏크리트 합성부재의 등가물성 결정 기법)

  • Kang, Kyung-Nam;Song, Ki-Il;Kim, Sun Gil;Kim, Kyoung Chul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.2
    • /
    • pp.145-154
    • /
    • 2020
  • Steel set is a structure that stabilize the NATM tunnel until the installation of shotcrete, and it is combined after the shotcrete is installed to improve stability. In this study, determination approach for the equivalent elastic modulus of shotcrete-lattice girder composite is newly suggested for tunneling simulation. Also, a method was presented to calibrate the equivalent elastic modulus through the comparison of the full 3D model and equivalent model. When the conventional equivalent elastic modulus is used for shotcrete-lattice girder composite, the flexural strength of equivalent model is 130% smaller than that of full 3D model. Equivalent elastic modulus is adjusted considering the error of flexural strength. It is found that the error of flexural strength obtained from adjusted equivalent model using adjusted equivalent elastic modulus is reduced less than 1%.

Optimal Reservoir Operation Systems During Flood Season Considering the Downstream Effects (홍수기 저수지의 최적연계운영)

  • Han, Kun-Yeun;Kim, Keuk-Soo;Cho, Wan-Hee;Yook, Jong-Hwa
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1708-1712
    • /
    • 2008
  • 본 연구에서는 낙동강 수계 안동댐과 임하댐의 홍수시 연계운영시스템을 구축하여 안동댐과 임하댐의 하류부인 안동시에서의 피해를 최소화하기 위해서 HEC-5모형을 이용한 모의기법을 통해 해석을 실시하였다. 모의운영을 실시하여 얻어진 결과를 FLDWAV모형에 적용하여 댐하류부의 홍수추적을 실시하였다. 홍수시 안동댐과 임하댐의 연계운영을 위해 안동댐과 임하댐에 대해서 각각 100년 빈도조건, 200년 빈도조건, PMF 조건, 200년 빈도와 PMF가 조합된 조건을 적용하여 분석을 실시하였다. 저류지 모의기법을 적용한 모의운영을 위해서 안동댐의 경우 안동댐 치수능력 증대사업 기본 계획보고서에서 제시된 일정률-일정량 방식의 댐 운영률을 이용하였고, 임하댐의 경우는 임하댐 치수능력 보고서에 제시된 일정률-일정량 방식을 적용하였다. 하류부 하천 제방의 여유고를 확보하기 위해 안동댐 운영의 대안으로서는 기존의 일정률을 조정하여 100년 및 200년 빈도하에서 기존 3,800m3/s를 3,490m3/s으로 최대 방류량을 변경한 100년 빈도조건, 200년 빈도조건, PMF 조건, 200년 빈도와 PMF가 조합된 조건을 적용 분석하여 댐의 방류량을 결정하였다. 댐 하류부의 홍수추적을 위해서 안동댐 및 임하댐 하류부로부터 지보수위표 지점까지의 53.9 km 구간에 대해서 FLDWAV 모형을 적용한 부정류 해석을 실시하였다. 댐 하류부에서의 시나리오별 홍수위를 산정하여 기존의 제방고와 비교함으로써 안동시 구간에서의 제방 안전성을 평가하였다.

  • PDF

A Numerical Study on the Behavior of Steel Pipes in Umbrella Arch Method (Umbrella Arch 공법 적용시 강관의 거동에 관한 수치해석적 연구)

  • 차민웅;이승도;문현구
    • Tunnel and Underground Space
    • /
    • v.14 no.1
    • /
    • pp.26-34
    • /
    • 2004
  • The effectiveness of UAM is generally accepted, but there has not been much rigorous study on UAM and its mechanical support mechanism is yet to be established. Also, most of UAM installations depend on empirical judgement rather than on engineering knowledge. In this study, an attempt to confirm the support effects and to understand the support mechanism of UAM has been made by analyzing the mechanical behavior of umbrella pipes installed in various ground conditions. The effects of overburden thickness, pipe size, overlap length and the placement of steel arch are studied using a three-dimensional finite element method. From the numerical parametric study, the support mechanism of UAM has been confirmed by analyzing the structural forces in the umbrella pipes due to the excavation.

A Study on the Performance Evaluation of Polypropylene Fiber Reinforced Concrete (폴리프로필렌섬유보강 콘크리트의 성능평가 연구)

  • Lee, Soo-Yul;Park, Yeon-Jun;Kim, Su-Man;You, Kwang-Ho;Jang, Sung-Il;Suh, Young-Ho
    • Tunnel and Underground Space
    • /
    • v.20 no.5
    • /
    • pp.378-389
    • /
    • 2010
  • Submarine tunnels are affected by the surrounding environments more than regular tunnels. Especially, they are often vulnerable to damage by salt in seawater. Seawater is more likely to affect reinforcing rods and steel fibers than concrete. Recently the usage of anti-corrosive fibers increases in the tunnel which is subject to the possibility of damage. By comparing the capability of polypropylene fibers with that of steel fibers, the proper mixture ratio is decided and the supporting capability of polypropylene fibers was tested using round panel and beam specimens. The results of this study can be of great use in selecting the fiber material and designing of fiber reinforced shotcrete of submarine tunnels.

Prediction of Long-term Behavior of Tunnel in the Presence of Geological Anomalies (지질이상대가 존재하는 구간에서의 터널의 장기거동 예측)

  • Hoki Ban;Heesu Kim;Jungkuk Kim;Donggyou Kim
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.8
    • /
    • pp.13-20
    • /
    • 2023
  • Tunnelling through the geological anomalies has widely known to have many difficulties such as bottom heave, crack of lining, squeezing and so on. To stabilize the tunnel during the construction or after construction, various reinforcing methods have been introduced and applied such as micropiling at the bottom of tunnel to prevent the bottom heave. In this study, long-term behavior of tunnel in the presence of geological anomalies was predicted using numerical analyses. To this end, material properties for swelling rock model capable of representing the rock swelling behavior was obtained using matching process with measured data to validate the adopted model. After the model validation, simulations were performed to predict the long-term behavior of tunnel in the geological anomalies.