International PMC Project Competency Enhancement Strategies for Domestic Engineering Companies (국내 엔지니어링 기업의 해외 PMC 사업 역량강화 방안)

  • Lee, Baul;Lee, Changjun;Han, Seung Heon;Lee, Jeonghun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.1
    • /
    • pp.121-132
    • /
    • 2018
  • Korea's construction engineering companies are facing difficulties in deterioration of international construction profitability because they focus on traditional engineering fields such as design and construction supervision. Therefore, it is necessary to strengthen competency of high-add-value engineering field such as Project-Management-Consultancy (PMC). This paper aims to suggest the strategies to enhance the international PMC competency. This study identified the competency factors for international PMC, using Borich needs assessment and Locus for focus model. As a result, step-by-step strategies were suggested according to the competency level in domestic engineering companies. The results of this study will assist Korean engineering companies to consider the important competencies for international PMC projects. Furthermore, enhancement strategies are going to be proper references for domestic engineering companies which prepare the international PMC project.

4S Framework Construction Structure for Interoperability of Spatial Information (공간 정보의 상호운용성을 위한 4S 기반 프레임워크 구축)

  • Oh, Byoung-Woo;Kim, Min-Soo;Joo, In-Hak;Lee, Jong-Hun;Yang, Young-Kyu
    • Journal of Korea Spatial Information System Society
    • /
    • v.3 no.1 s.5
    • /
    • pp.95-108
    • /
    • 2001
  • The provision of spatial data is a key infrastructural requirement for the promotion of economic growth, environmental quality, social progress, etc. 4S technology integrates 4 kinds of systems that process spatial data: GIS (Geographic Information System), GNSS (Global Navigation Satellite System), ITS (Intelligent Transport System), and SIIS (Spatial Imagery Information System). Spatial data processing field is expected to get synergy effect and overcomes development limit of individual unit technology via 4S technology. This paper discusses both the development of 4S-kernel technology and the construction of 4S-based framework, In the development of 4S kernel technology, we will concentrate on the following issues: the development of 4S base components for reciprocity integration among GIS, SIIS, GNSS and ITS technologies, the development of 4S-Mobile S/W and H/W, 4S-Van components, and national LBS technologies. And in the construction of 4S-based framework, we will especially concentrate on the ISP for overall 4S technologies, the international cooperative research center, and the guide model deduction for supervision and certification of 4S projects. Finally, we examine about how the construction of 4S-baed framework affects 4S industry.

  • PDF

Correlation Analysis between Organization Conflict and Job Stress of Construction Manager in Construction Site (건설현장 건설사업관리기술자의 조직갈등과 직무스트레스 상관관계 분석)

  • An, Sung-Hoon;Bitamba, Bauma Frigeant
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.367-373
    • /
    • 2020
  • As the supervision in site is integrated into construction management, the organization's work is expanded, and the perspective and goals of the work have changed, so there is a high possibility that the conflict situation within the organization will increase. Organization conflict increase a job stress of workers, so it acts as a negative factor in deriving organizational performance. Therefore, the purpose of this study is to analyze the correlation between organization conflict and job stress of construction manager in construction site. As a result of the study, the organization conflict of the construction manager was generally low, and the job stress was also less than that of other area's workers. In addition, correlation analysis revealed that organization conflict and job stress were related. The results of this study may help to improve the organization structure in the construction management site organization.

A Study on the Development of Web Based VE Management System (웹기반 VE 관리시스템 개발)

  • GOH IL-DU
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.143-148
    • /
    • 2001
  • Digital documentation is now becoming a must throughout a building process including design, construction, inspection, procurement and even facility management. The Internet is a backbone of such process, and web-based information exchange is the standard among other mainstream technologies. The current information management techniques, however, is heavily dependant on the server-side processing, which naturally results in the overload of the overall system. This paper proposes an XML-based approach in order to resolve such problems. A VE system was developed to demonstrate the efficiency of the XML solution, in term of efficient VE data management and fast decision making. also in this paper suggests 1) introduce XML based DBMS to improve data management efficiency and 2) introduce Mobile Computing to improve data accessibilities on sites.

  • PDF

Public Infrastructure Practitioner's Recognition on Project Performance (공공토목공사 실무자의 성과요인 인식차이 분석)

  • Park, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.93-100
    • /
    • 2007
  • Performance measurement and evaluation is a critical issue in public funded civil infrastructure projects in recent years. As a results, Korean government has introduced the related policies and regulations based on the foreign cases to evaluate public construction projects. However, construction circumstances are different from other countries and the results from adopted regulations are not satisfied. Therefore this research proposes the critical success factors(schedule, cost, productivity, change order, safety, quality) for public construction projects based on previous related research outputs to successfully implement construction performance evaluation. Then, this paper also proposes the weights for the critical success factors. The proposed weights are developed by AHP of construction experts. Furthermore, the paper shows the difference of the weights of the critical success factors by project participants (owner, constructor, engineering, and inspector). This efforts will enhance the ability to develop an effective performance evaluation process and system for public construction projects.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

Construction Status and Proposal for Information Communication Facility of Childcare Center -After COVID19, focusing on IT Technology Utilization- (어린이집 정보통신설비 구축현황 및 제안 -COVID19 이후 IT기술활용 중심으로-)

  • Lee, Jae-Yong;Shin, Seung-Jung
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.4
    • /
    • pp.43-50
    • /
    • 2020
  • The purpose of this study is to examine the case of constructing information and communication facilities in daycare centers and to propose an educational environment that can foster young talents who can lead the era of the fourth industrial revolution. In particular, after COVID19, a method was proposed to create an information and communication environment suitable for children to receive personalized education, and to create an environment for experiential education if possible, and at the same time to enable averaging of customized learning. Since there has been no research on information and communication facilities in daycare centers, we intend to place significance on starting, and in the future, to foster creative and contextual children, we will reduce the movement of teachers through smart speakers and mobile devices, and tailor the educational environment through AI data. I think that the design of the daycare center should be changed in the direction of making the product. To this end, the CM role of information and communication supervision is needed, and it is hoped that it will become a design standard for daycare centers after COVID19 by developing research on daycare centers.

Strategy Improvement of Construction Management in the Owner's View Point (발주처의 관점에서 바라본 토목사업 CM 제도 활성화 방안)

  • Lee, Sang-Ok;Park, Jin-Hong;Jang, Won-Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.463-472
    • /
    • 2012
  • Exemplary contracts of construction management (CM) including highway projects have been carried out in the civil engineering area over the past ten years. However, practical and administrative challenges as transitional circumstances have been revealed in the different participants of supervision, inspection and construction management. Thus, it is important to internally overcome problems and negative perception encountered in civil engineering, and to promote the efficiencies in construction cost and quality. In addition, external efforts should be put to market opening, globalization, and technology development for competitiveness and high value industry. While it is critical to establish the concrete CM system by collaborating with various participants, proven architecture and system have not been provided because of incorrect measurement of CM accomplishment, overlap of responsibility between CM and supervision, and slow deployment in construction field. This paper analyzed the current CM practices and business environments, and presented the possible solutions for strategy improvement of CM in the owner's view point.

A Study on the Safety Management of High Pressure Underground Pipeline in Industrial estate (산업단지 고압매설배관 안전관리 고찰)

  • Choi, Hyun-Woong;Chung, Se-Kwang;Kim, Jin-Jun
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.6
    • /
    • pp.30-38
    • /
    • 2017
  • Established in the 1960s, high pressure underground pipelines in Ulsan and Yeosu industrial estate are underground as toxic gas as well as combustible gas that is heavier than city gas and low combustion range. Especially, industrial pipelines occupy more than 20 years old pipes. In this way, the industrial estate pipeline was installed before the introduction of the supervision of construction, However, unlike the city gas pipeline, the pipeline is managed without any legal obligation. In this study, the safety management status of high pressure underground pipelines and urban gas underground pipelines in the industrial estate is analyzed and comparison of laws, extent of damage impact, using the pipe inspection model for pipe inspection of high pressure piping system with the existing piping system. it is intended to cuntribute to improving the safety of industrial estate are underground pipeline.

Evaluation Model for the Stability of the Diagnostic Information System Incorporating the Quantitative Evaluation (정량적 평가를 도입한 정보시스템 안정성 진단 평가 모델)

  • Im, Hyeong-Do;Park, Dea-woo
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.05a
    • /
    • pp.313-316
    • /
    • 2016
  • Highly probable cause of the current turmoil critical national infrastructure and private enterprise information systems failures or national event of an accident, it is inevitable huge hit in corporate business as well as a significant impact on the national benefit. This is a trend subject to the stability of the national management information system has a significant impact on people and society, such as banking, telecommunications, transport and energy, which can be extended into a private institution. However, public and private ICT business through the development of Information system Audit or CMMI(Capability Maturity Model Integration) certification check the quality of the target system, but quality check on the reliability of the information system operations after construction is either not promoting met for some safety test results a situation that does not enabled by insufficient. By preventing the disorder or an accident of this study, the diagnostic reliability information systems through inspection and evaluation system development of information systems being established, and to minimize service confusion and study ways to ensure customer - oriented service.