Small-Scaled Laboratory Experiments for Dynamic Stability Monitoring of Large Circular Steel Pipe Cofferdam of Marine Bridge Foundation (해상교량기초용 대형원형강관 가물막이의 동적 안정성 모니터링을 위한 실내모형실험)

  • Park, Min-Chul;Lee, Jong-Sub;Kim, Dongho;Yu, Jung-Doung
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.12
    • /
    • pp.123-134
    • /
    • 2019
  • This study presents dynamic responses of circular pipe models as a part of fundamental studies on dynamic stability monitoring of the large circular steel pipe cofferdam with the ship collision. Small-scaled laboratory experiments are performed with a single and bolted circular steel pipes with a diameter, thickness, and height of 30, 0.4, 90 cm, respectively. The bolted circular steel pipe is configured with three segments of 30 cm in height. Circular steel pipe models are embedded in a soil tank, all 1 m in length, width, and height. The thickness of soil in the soil tank is set at 23 cm. The ship collision is simulated with a hammer impacting. The dynamic responses are investigated with different water levels of 25, 40, 55, and 70 cm. Experimental results show that a signal energy decreases with increasing water level. More sensitive reduction in the energy appears for the bolted circular steel pipe. A predominant frequency decreases with increasing water level for both single and bolted steel pipes. The minor reduction in the frequency appears for the bolted circular steel pipe under the water level of 70 cm. This study suggests that the signal energy and frequency response is useful for the dynamic stability monitoring of the large circular steel pipe cofferdam.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

A Study of Discharge Rating Method in the Reach on River Works (하천공사 영향 구간 내에서 유량환산 기법 연구)

  • Kim, Chi-Young;Lee, Ki-Sung;Kwon, Dong-Seok;Oh, Chang-Ryeol;Jung, Sung-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.488-493
    • /
    • 2010
  • 하천 유량자료는 조사 목적에 따라 시간, 일, 월 등 다양한 시간범위를 갖는다. 이러한 특성을 갖는 유량 자료를 확보하기 위해 정해진 시간에 유량측정을 시행하는 것은 경제적, 기술적으로 매우 어려운 일이다. 따라서 연속적인 유량생산은 상대적으로 연속측정이 용이한 수위자료를 연속측정하고, 간헐적인 유량측정을 통하여 수위-유량관계를 수립하여, 수립된 관계를 연속적으로 측정된 수위자료에 대입하여 이루어진다. 그러나 준설에 의한 하상변동, 가물막이 등 하천횡단 구조물 설치에 따른 통제특성 변화, 공사 등에 의한 하천경사 변화 등에 의해 수위-유량관계의 연속적인 변화가 발생할 경우 하나의 수위-유량관계로 연속적인 유량환산이 불가능하게 된다. 따라서 자연현상 및 각종 공사에 의해 하도 특성이 변화할 경우 신뢰도 높은 유량을 신속하게 제공할 수 있는 새로운 기법 적용이 요구된다. 본 연구에서는 4대강 사업구간에 위치한 유량관측소에서 전통적인 수위-유량관계 곡선법, 기간분리에 의한 방법, Stout 방법, 비유량법 등 다양한 방법을 활용하여 연속 유량자료를 생산 기법을 제시하고자 한다.

  • PDF

A Case Study on Design and Construction of Cofferdam for Hydraulic Structure (수중구조물을 위한 가물막이 설계 및 시공사례에 대한 연구)

  • Cho, Joo-Hwan;Shin, Dong-Hoon;Jeong, Seung-Tai;Woo, Sang-Yoon;Nam, Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.124-143
    • /
    • 2010
  • Cofferdam is a temporary levee or dam structure built by using sheet pile or earth materials to prevent water infiltration during construction work of bridge, dam, harbour dock, or hydraulic structures in the river. In this regard, it is required to secure cutoff ability for dry work and workability for rapid installation and removal of the temporary dam or levee structures. In this paper, case studies for design and construction of cofferdam were performed, and water diversion method was briefed with some examples of cofferdam type as well. For the case study details of design and construction were reviewed based on cofferdams under construction related to 16 submerged weirs of "The 4-river restoration project" and dam type cofferdam respectively. From the review, it was known that the method for changing the water flow is selected based on the data from geological and geo-hydraulic site investigation in order to mitigate environmental effects by making sure if the design cross-sectional area of flow and maximum working days are sufficiently guaranteed. Finally, the primary findings and main conclusion derived are summarized that determination of applicable type of cofferdam should be checked by case study and meet design requirements such as water inflow control, constructability.

  • PDF

Runoff Characteristic Analysis of ManKyung River Basin in 2006 (2006년 만경강 유역의 유출특성 분석)

  • Shim, Eun-Jeung;Lee, Jae-Hyug;Oh, Chang-Ryeol;Lee, Jin-Won;Jung, Sung-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1839-1843
    • /
    • 2007
  • 현재 우리나라는 100년이 넘는 수문관측에도 불구하고 수문자료의 양과 질이 선진국에 비해 부족하며, 이를 해결하기 위해 IHP유역, 하천 시험유역 운영 등 각종 수문조사 사업을 시행하고 있다. 정확하고 신뢰성 있는 유량자료의 확보는 각종 수공구조물 설계, 하천의 이 치수 계획의 수립, 홍수 예 경보 시스템의 분석을 위한 기본적이고도 중요한 과정이다. 본 연구에서는 만경강 유역에 위치하고 있는 목천, 하리, 봉동, 소양, 효자지점을 대상유역으로 선정하고 2006년 저 평수기 및 홍수기에 걸쳐 유량을 측정하여 자료를 확보하였다. 측정된 성과의 적절성 검토를 위해 최대구간유량비와 불확실도를 산정하여 신뢰하였고 이들의 수리특성을 분석하였다. 일반적으로 수자원 분야에서 유출을 검토하기 위해 수위자료가 아닌 유량자료를 이용하여 해당 분야에 대한 분석을 시행한다. 이에 본 연구에서는 대상유역의 측정 성과를 바탕으로 수위-유량관계 곡선식을 개발하고 수위 수문곡선을 유량 수문곡선으로 변환하였다. 또한 유출특성을 분석하기 위해 연 유출률 분석, 상 하류 유량검토, 호우사상별 직접유출률 분석을 실시하였다. 그 결과 만경강 유역의 지점별 연 유출률은 하리 69.4%, 봉동 66.1%, 소양 54.1%, 효자 58.1%를 보여 주었다. 상 하류 유량검토를 통해서는 하리지점의 보 가물막이 공사 기간을 제외하고 전반적으로 적절한 상 하류 관계를 나타내었다. 본 연구는 대상유역의 유출특성을 분석하기 위한 것으로 강우자료의 산정은 전주지역의 기상청 자료를 이용하였으며, 평균강우량은 산술평균법에 의하였다.

  • PDF

The design of coffer dam utilized P.R.D. method (P.R.D. 공법을 활용한 가물막이 설계)

  • Park, Chal-Sook;Lee, Kyu-Tak;Yum, Kyung-Taek;Kim, Yoon-Ku;Kang, Bong-Gwon;Lee, Jae-Weon;Lim, Seok-San;Jeong, Ji-Yearl
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.869-887
    • /
    • 2008
  • Coffer dam for tunnel type spillway in inflow section of Dae-am dam was originally planned as 2 lines sheet piles with Water Zet method. But, the result of pilot test was caused of some problems that vibration during installation of pile could pollute water and water leakage could the lower part. So, sheet piles was not satisfactory for faculty of coffer dam. Structural instability of sheet pile system need to reinforcement. Characteristic of Dae-am dam was small reservoir capacity but wide drainage area, of which it was judgment that security of leakage and stability was difficult during excavation of inlet part. So, we consider that water curtain method utilized with in site pouring concrete pile method was designed at weir part of spillway. We were known about basement rock that geological boring was carried out in weir part. After taking a deep consideration, PRD method was accepted as a new method. Concrete pile by PRD was installed to below country rock. CJM method was carried out with PRD. After making concrete wall using Top-down method, earth anchors were installed for supporting it. According to the result of numerical analysis, as water level rises, wall is stable.

  • PDF

Experimental Study on the Wake Characteristics of a Perforated Vertical Wall with Gap in the 2-Dimensional Flow (2차원 흐름 중에 놓인 틈새를 갖는 수직벽 후류 특성에 관한 실험적 연구)

  • Jo Dae-Hwan;Oh Kyoung-Gun;Lee Gyoung-Woo
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2005.10a
    • /
    • pp.135-140
    • /
    • 2005
  • There are cofferdam and watertight wall to prevent of circulation or pollution during building of ocean structures like a dam and bridge in the harbors area and the sea. Inflow fluid and base of structure is important thing as one of the structural design factors for this interception wall like a cofferdam and watertight wall. In this study, it is revealed that at least 500 instantaneous velocity field data are required for ensemble average to get reliable turbulence statistics. The turbulent shear flow around a surface-mounted vertical wall was investigated by using the two-frame PIV(CACTUS 3.1) system and Mean velocity distributions have also been measured in the whole flow field.

  • PDF

Laboratory Mix Design of C.S.G Method (C.S.G 공법의 실내 배합설계)

  • Kim Ki-Young;Jeon Je-Sung;Kim Yong-Seong
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.5
    • /
    • pp.27-37
    • /
    • 2006
  • Cemented Sand and Gravel (C.S.G) method has become increasingly popular in Japan and throughout the world as a construction method and material. This method is favorably used for cofferdam and large dam because a quarry and aggregate plant facility can be diminished. Also, this method can reduce construction cost, work duration and destruction of environment. In this paper, a methodology for C.S.G mix design based on so-called soil mechanics approach is proposed for trapezoid-shaped dam. The methodology consists of selection of a suitable aggregate, introduction of compaction method, processing to prepare standard specimens, and determination of mix portions. Also, unconfined compressive strength tests and large triaxial compression tests are performed. From the results of the test, correlation equation among strength, elastic modulus and unit cement is proposed.