• Title/Summary/Keyword: , AHP 분석

Search Result 1,881, Processing Time 0.026 seconds

Development of Analytic Hierarchy Process or Solving Dependence Relation between Multicriteria (다기준 평가항목간 중복도를 반영한 AHP 기법 개발)

  • 송기한;홍상연;정성봉;전경수
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.7
    • /
    • pp.15-22
    • /
    • 2002
  • Transportation project appraisal should be precise in order to increase the social welfare and efficiency, and it has been evaluated by only a single criterion analysis such as benefit/cost analysis. However, this method cannot assess some qualitative items, and cannot get a proper solution for the clash of interests among various groups. Therefore, the multi-criteria analysis, which can control these problems, is needed, and then Saaty has developed one of these methods, AHP(Analytic Hierarchy Process) method. In AHP, the project is evaluated through weighted score of the criteria and the alternatives, which is surveyed by a questionnaire of specialists. It is based on some strict suppositions such as reciprocal comparison, homogeneity, expectation, independence relationship between multi-criteria, but supposing that each criterion has independence relation with others is too difficult in two reasons. First, in real situation, there cannot be perfect independence relationship between standards. Second, individuals, even though they are specialists of that area, do not feel the degree of independence relation as same as others. This paper develops a modified AHP method for solving this dependence relationship between multi-criteria. First of all. in this method, the degree of dependence relationship between multi-criteria that the specialist feels is surveyed and included to the weighted score of multi-criteria This study supposes three methods to implement this idea. The first model products the degree of dependence relationship in the first step for calculating the weighted score, and the others adjust the result of weighted score from the basic AHP method to the dependence relationship. One of the second methods distributes the cross weighted score to each standard by constant ratio, and the other splits them using Fuzzy measure such as Bel and Pl. Finally, in order to validate these methods, this paper applies them to evaluate the alternatives which can control public resentments against Korean rail path in a city area.

선원의 고용 및 복지사업 우선순위 도출에 관한 연구

  • Kim, Tae-U;Ryu, Dong-Geun
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2016.05a
    • /
    • pp.232-234
    • /
    • 2016
  • 선원 직업 기피현상 및 선원복지혜택과 관련하여 한국선원복지고용센터에서 운영중인 사업과 추진해야 할 사업의 우선순위를 AHP기법을 이용하여 분석하고, 최우선적으로 개선방안을 제시하였다.

  • PDF

외항 상선 해기사의 이직의사 결정요인에 관한 연구

  • Kim, Yong-Du;Ryu, Dong-Geun
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2015.07a
    • /
    • pp.197-199
    • /
    • 2015
  • 장기간 선박이라는 공간에서 생활하면서 이가정성과 이사회성 등의 특성을 갖는 외항상선해기사들이 이직을 고려할 때 어떤 요인으로 의사결정하게 되는지에 대하여 AHP기법을 이용하여 분석하고, 이직율을 낮출 수 있는 대안을 모색하였다.

  • PDF

A Study on Function Weighting Values for the Rural Revitalization Support Center (농촌활성화지원센터의 업무 중요도 설정에 관한 연구)

  • Kim, Doo Soon;Kim, Sung Rok;Bae, Sung Eui
    • Journal of Agricultural Extension & Community Development
    • /
    • v.20 no.4
    • /
    • pp.937-952
    • /
    • 2013
  • The purpose of this study was to choice the efficient operation for the Rural Revitalization Support Center(RRSC) by using AHP method. AHP method is to assess the importance of the RRSC has come up with the weighting values. According to AHP analysis procedures, the two most important function for the RRSC are eliciting supports for the forum and human resources development management. And we must acknowledge each RRSC has the difference manpower or condition. Therefore, the RRSC need a focus on efficient and working in conjunction of related organizations, in order to promote the effective center of the function. Also, supraorganization need for integrated management.

A SWOT based ANP Application for Strategy Development to enter Overseas Water Market (해외 수처리 시장 진출 전략 개발을 위한 SWOT-ANP 적용 모델 개발)

  • Choi, Jae-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.305-316
    • /
    • 2014
  • The current global water market has been reshaped with a few multinational water companies, water-specialized companies, and other non-construction companies such as manufacturing and financial companies. Each has different business objectives along with the value chain of water industry. In this context, a SWOT-ANP model is proposed to prioritize strategic alternatives for a non-construction company in Korea and the result is validated through a comparison with the AHP model and real business strategies of the company examined from the recent news reports. The validation was confirmed that the company's strategies are very much similar to the priority list and the rankings of the strategic alternatives are identical with those from AHP model, while the weights are slightly changed from the weights in AHP result.

The Study on the Analysis of Factors Decreasing Construction Labor-Productivity Using AHP Method (AHP기법을 이용한 건설노동생산성 저하요인 분석에 관한 연구)

  • Pyo Young-Min;Bae Soo-Yong;Ryu Hyoung-Han;Lee Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.141-147
    • /
    • 2005
  • Usually, processing whole project or a part of frame work delays due to acceleration, changing orders, management, characters of project. overtime, worker crowding, early occupation in the field of construction. Through a whole project, these factors cause decreasing construction labor-productivity which is the most dependent in business of construction. These kind of decreasing of construction labor-productivity cause many negative effects, just as extension of time, increasing cost in project of construction. Regardless of characters of construction or decreasing labor-productivity, extension of time is a incident which needs acceleration, also it cause a high possibility of claim and dispute. The productivity has just a broad meaning in business of construction. That's why it's difficult to apply in the field of construction. Especially, factors increasing or decreasing labor-productivity is defined by analysis of working as qualitative and outlined evaluation. However, study of the each factor decreasing construction labor-productivity analysis has not researched, because of difficulty of systematic measurement and management. The existed studies about management of productivity are just focused on estimation of productivity, not on evaluation of productivity. It was true that I couldn't examine clearly about the analysis of how much important per each the factor which have influence on labor-productivity because of the characteristic as qualitative that the labor productivity have On this study, i tried to get the factors decreasing of labor- productivity with gathering opinions of panels of expert's studies about the factors decreasing of labor-productivity on project of construction through Delphi method and i evaluated the result factors as quantitatively and subjectively about importance of factors decreasing construction labor-productivity Analysis, using AHP Method by Saaty. Also, using Delphi and AHP method, 1 suggest substantiated method qualitative factors are measured by quantitative criteria.

  • PDF

Derivation of HRD Policy Direction in the Field of Green Technology Using AHP Methodology (AHP방법론을 이용한 녹색기술 인력정책 방향성 도출)

  • Lee, Jung-Mann
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.6
    • /
    • pp.350-359
    • /
    • 2011
  • The purpose of this study is to derive HRD programs for the government's priorities and HRD policy direction in the field of green technology to create green jobs. AHP methodology was employed by looking into "green job creation and HRD programs" announced by government. The empirical results showed that the most important one among 37 HRD programs was green education and research capacity building in engineering college and graduate school. And fostering green social enterprise, green education and research through university-research collaboration, green workers transition training, strategic partnership for green job are presented in order in terms of the importance. It suggested green creativity(0.384), green Industry growth (0.277), s정ustainable development (0.125), green technology spill-over effect (0.089), a global collaboration (0.084 ), and green cultural diffusion (0.042) as a green technology and HRD policy direction.

The Development and Application of the Indices of Evaluation for the Cultural Tourism Development Project Using AHP -focusing on Cultural and Ecological Tourism Infrastructure Project in Three Cultural Areas of Andong City- (AHP를 활용한 문화관광개발 사업의 평가지표 개발 및 적용 -안동시 3대 문화권 문화·생태 관광 기반조성 사업을 중심으로-)

  • Kwon, Gi-Chang
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.4
    • /
    • pp.399-407
    • /
    • 2016
  • This study is about setting the weighed value of evaluation items for cultural tourism development project using AHP and it analyzed the cultural and ecological tourism infrastructure project in three cultural areas of Andong City. As a result of examining the reliability of evaluation items, it turned out to be 0.9, an appropriate level. In the analysis of weighed value, the items valued highly were in the order of validity of the plan, economic validity, validity of the policy. As for the detailed indices for the three that showed the highest weighed value, for validity of the plan, distinction of contents; for validity of the policy, compatibility of regional characteristics; for economic validity, sustainability were given high values. In the end, it could be concluded that as the cultural and ecological tourism infrastructure project in three cultural areas was delayed a lot more than previously planned, in order to flexibly respond to changing environment, it would be desirable to change parts of the previous plan before pushing ahead with it.

Development Strategy and Priority Analysis of Korean Fabric Mills in Indonesia Using SWOT/AHP Analysis Theory (SWOT/AHP분석을 통한 인도네시아 진출 한국 섬유원단업체의 발전전략과 우선순위분석)

  • Jo, Myoung Rae;Lee, Min Jung
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.11
    • /
    • pp.288-296
    • /
    • 2019
  • The Korean textile industry faces a crisis, and overseas expansion is increasing. Indonesia, the third trading partner in the Korean textile industry, is the fifth largest country in terms of Korea's direct investment. This study intends to suggest a development strategy for Korean fabric mills to advance into Indonesia. First, the SWOT representative factors of the fabric mills considering the circumstances of Indonesia were derived through literature research and expert meeting. In order to derive the priority among these, AHP analysis was performed to derive the final weight and priority of the SWOT factors. Through this, I would like to suggest a management strategy that can be helpful to companies that have already entered Indonesia and are planning to enter the country in the future.