• Title/Summary/Keyword: 'build' project

Search Result 656, Processing Time 0.026 seconds

A study of the functional requirements to management tool for software development projects (소프트웨어 개발 프로젝트를 위한 요구관리도구의 기능요건 연구)

  • Park, Koo-Rack
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.12
    • /
    • pp.113-120
    • /
    • 2011
  • Information system gradually increases the complexity and scale of the project, while if the project fails to occur. To analyze the causes of failure of the project a lack of understanding of your project, unclear requirements and requirements change, etc. of the software development life cycle from requirements analysis phase is to find the source of most. In this paper, a software development project needs analysis derived from the traceability between features and functionality, and development needs throughout the life cycle requirements during the ongoing change management tool was designed to allow. And among those related to the project through consultation with a sufficient consensus to build a common understanding of effective communication will discuss the features required to support.

THE KEY SUCCESS VEHICLES FOR FAST-TRACK IN PUBLIC DESIGNBUILD PROJECTS

  • Kyu-Man Cho;Kyo-Jin Koo;Chang-Taek Hyun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1094-1099
    • /
    • 2005
  • Nowadays the Design-Build Delivery Method in public sector has been remarkably grown up in applying owing to its merits such as shortening construction duration. The Fast-Track is the wide-using method for accelerating schedule at Design-Build projects. But the public agency is in trouble to execute Fast-Track because of the lack of guideline for its process. As a result, in some cases applying Fast-Track methods, cost and construction duration are increased more than cases of non-Fast-Track projects. In this study, through the questionnaire surveys to professionals having actual implementation experiences as a construction manager, owner or general contractor, key success vehicles of Fast-Track are induced.

  • PDF

Value Management of Private Finance Initiative Projects (민간투자사업을 위한 VE 적용방안)

  • Lim, Jong-Kwon;Kim, Seoung-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.123-130
    • /
    • 2006
  • Recently, Korean government promotes BTL(Build-Transfer-Lease) for their public construction project to apply private sector's experience and finance initiatives. Many of public buildings and civil infrastructure projects were planned to be delivered by BTL and it helps to continue public projects under tight budget conditions. Since the characteristics of BTL projects, creative ideas for the project function, performance and its LCC (Life Cycle Cost) become more important than usual public work project. This paper introduces the systematic "VE job Plan" application techniques for BTL project and shows the process. This study shows the application of "VE job Plan" for BTL project to help decision making and value improvement. Also, Project cost was estimated by LCC (Life Cycle Cost) analysis. Technical "FAST diagram"was developed and used to find major functions of the project. So, it helps to improve performance of functions and make creative ideas. FAST diagram also help to find relationships between functions and cost. A case study (Daegu Art Gallery BTL Project) was conducted using proposed "VE job Plan. Study demonstrates how value management helps save money and increase functional performance. Researcher found that project can save cost and improve performance of functions significantly by using appropriate VE analysis process at appropriate time.

  • PDF

Evaluation on the Relationship between Software Engineering Level and Schedule Deviation in Software Development (SW 공학수준과 SW 프로젝트 납기성과와의 관계)

  • Kim, Seung-Gweon;Ko, Byung-Sun
    • Journal of Information Technology Services
    • /
    • v.10 no.4
    • /
    • pp.191-204
    • /
    • 2011
  • Recently, many software companies are trying to improve the software quality and project outcome with more costs and efforts in development time. In the software convergence and integration environments, it is required efforts to gain high quality of software. In other words, it is required to utilize software engineering knowledge and technology for higher software quality and better software project productivity. The Software development productivity can be varied by software process capability according to building a framework for software development, selection and use of appropriate technology, human resource management. Software process capability will influence software project outcome which is the general opinion. This study provides empirical evidence about software engineering efforts and investment approach to lead software project performance. We measured the software engineering efforts by SW engineering level and analyzed the corelation between software engineering level and schedule deviation. And, we verified that this performance is affected by the size of software company. As a result, software process capability is important to build a infrastructure and develop systematically software project. The higher software engineering level can lead to improved software project performance.

A Construction of Database System for Automation of Project Quantity Survey (공사물량 산출의 자동화를 위한 데이터베이스시스템 구성)

  • Lee, Min-Nam;Lee, Sang-Burm
    • The Transactions of the Korea Information Processing Society
    • /
    • v.2 no.2
    • /
    • pp.137-147
    • /
    • 1995
  • In the construction project, the design and the construction have been divided strictly. Because the design files of CAD library cannot be used directly in project quantity survey, we depend on manual handling.. It's because there has no interface between the system of the design and that of the construction. In this paper, by using the sizes and quantites of project design, we construct database model for automation of project quantity survey, and analyze the interface among the structure design files stored in design library of CAD system and the information of quantity survey, build a system which can survey the project quantity efficiently and evalulate the performance of this system.

  • PDF

A Study on the Linkage Strategy for Urban Regeneration Considering Local Characteristics (지역특성을 고려한 기성시가지의 연계적 재생전략 연구)

  • Kim, Cheol-Su;Jung, Byung-Doo;Kang, Seung-Kyu
    • Journal of the Korean housing association
    • /
    • v.23 no.5
    • /
    • pp.87-94
    • /
    • 2012
  • The primary purposes of this study are to suggest a medium-sized regeneration project which includes the excluded small sites near existing regeneration site, to identify urban improvement type which fits local conditions, and to suggest proper regeneration strategies for the improvement type. Main findings of this study are follows. First, the size of the living environment improvement project in urban area should be larger than 3ha and government's incentives are required for parcel merges to make the medium-size project site. Second, independent type of urban regeneration project should consider local characteristics while center-spread type of urban regeneration project should build a center by providing neighborhood facilities and proper housings. Third, urban regeneration project should be able to utilize local assets, such as cultural heritages, natural landscapes, transportation facilities. Fourth, standards for public support should be prepared to improve local competitiveness. Last, further studies are required for urban regeneration system improvement.

Project-based Learning Method to Reorganize the NCS Training Program: Focusing on the 4-Year-Course University (NCS 교육과정 개편을 위한 프로젝트기반 학습법: 4년제 대학을 중심으로)

  • JUNG, Dae-Hyun;WEONG, Jong-Ha
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.4
    • /
    • pp.1057-1067
    • /
    • 2016
  • National Competency Standards are the major administrative project to build a competence-based society. The manpower for the global society should be recognized by performance rather than educational records. Therefore, all colleges should first nurture NCS-type manpower based on field needs. This study comparatively analyzed the differences between the lecture style of four-year colleges and the outcomes of problem-solving and project-based learning method to prove why it is necessary to introduce the NCS program. Especially, It will review the constraints and measures of NCS introduction to overcome in a four-year university. Through this, it can be used as a means to help improve the field conformity of a four-year college curriculum by presenting the development and utilization of curriculum-based NCS in a four-year university. As a result, it was found that the overall satisfaction with the problem-solving and project-based learning method was above average. Many students were dissatisfied with the traditional teaching methods and the new project-based learning method was relatively effective in college education. Students' participation also improved. Based on the evaluation of learning performance, the new method was found more satisfactory than the old teaching method in terms of comprehension of professional knowledge in various fields, nurturing of logical thinking skills, acquisition of analytical skills, comprehensive thinking skills, creative problem recognition, and open-minded thinking skills.

A Study on the Efficiency of Execution of the Private Subsidy for Environmentally Friendly Aquaculture (친환경양식어업육성 민간보조사업비 집행효율 증대 방안)

  • Kim, Kuk-Ju
    • The Journal of Fisheries Business Administration
    • /
    • v.51 no.1
    • /
    • pp.53-66
    • /
    • 2020
  • The Ministry of Maritime Affairs and Fisheries is supporting the "Environmentally Friendly Fisheries Promotion and Private Assistance Project" to increase production of eco-friendly, high-value-added foods. Private-backed operators selected for the project will have an economic opportunity to build, expand or refurbish eco-friendly fishing grounds. To facilitate this, the scope of project support was expanded after 2015 and an opportunity was prepared for private subsidy projects to grow to a new level in terms of quality and quantity by switching to a public offering project. However, starting in 2017, demand from the private sector will plunge and selected projects will be delayed or the project implementation rate will be lowered. It was a time for subsidy-related laws and systems to be reinforced but private subsidy projects do not temporarily shrink simply due to the increased administrative burden on private subsidy operators on subsidy management. It plans to review the correlation between laws and systems related to the construction of fish farms and suggest ways to enhance the efficiency of implementation so that economic advantages, the biggest advantage of the private subsidy project, can be recovered within the current legal system.

A Study of Game Project Curriculum for Integrated Subject (통합교과로서의 게임 프로젝트 교육과정 운영방안 탐구)

  • Choi, Seung-Kwan
    • Journal of Korea Game Society
    • /
    • v.16 no.5
    • /
    • pp.111-122
    • /
    • 2016
  • The purpose of this study is to suggest an curriculum model of teaching scheme which performs team project learning based on Integrated project with different fields. To address this goal, the present study suggests a practical game project model under the same game-making circumstances as game industry by consisting of real case of convergence parts(game graphic, game design, game program). This project-based learning case has been conducting Integrated project education since 2008 in A educational Institute in Korea. The results of study suggest a standard of Integrated-based curriculum model and it is constructed with two parts. The first part is what students learned during project processing, such as responsibility, communication. The other part is how to construct the educational environment for integrated project. It explains how to organize and build teams, plan of integrated project, rule the role of team task, perform collaborative task, present interim/final presentation, evaluate grade. This study is expected to be utilized as a framework for the instructional design and the guideline for improving learner competency in team project learning.

Effect of Multyparty Contract in IPD Project Case study of USA and Korean Projects (IPD 계약은 IPD 프로젝트의 필수조건인가 - 국내외 사례조사를 통하여 -)

  • Yoo, Seungeun;Kim, Taewan;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.3-16
    • /
    • 2017
  • Integrated project delivery (IPD) is suggested as an alternative to traditional delivery methods such as design-build (DB), design-bid-build (DBB), and construction management at risk (CMR). Many foreign research studies have approached IPD not only in the contractual aspect but also the work implementation method aspect. However, most research projects in Korea have focused on the contractual aspect of IPD for asserting that the characteristics are the critical matter. The Korean institutional and legal system does not permit the multi-party agreement; therefore, it is difficult to adopt IPD in Korea's construction industry. The researchers do not wait the system to be changed, but we do identify the possibility of adopting IPD in Korea in the perspective of work implementation method, except the contractual characteristics. Thus, the goal of this research is to identify one project that does not include IPD agreement but utilizes other IPD characteristics whose contractual results have similar performance to those that utilize all characteristics of IPD including agreement. This research is expected to enhance performance of the construction project in a Korean construction environment by embracing IPD characteristics as overcoming limits and bounds of the traditional delivery method.