• 제목/요약/키워드: 'build' project

검색결과 656건 처리시간 0.023초

프로젝트 환경요인을 고려한 Data Warehouse 구축방법의 선택 모형 (A Model to Decide the Approach to Build Data Warehouse considering Project's Environmental Factors)

  • 노규성;윤재희
    • 한국지능정보시스템학회:학술대회논문집
    • /
    • 한국지능정보시스템학회 1999년도 춘계공동학술대회-지식경영과 지식공학
    • /
    • pp.403-413
    • /
    • 1999
  • Today's businesses are experiencing intensive global competition and the most accelerating pace of change ever. Competitors have sprung up that were not even on the business's radar. This environment impacts all decisions and strategies as business try to dominate their market or their marker or their industry merely to survive. So recently most of organizations are considering on building the data warehouse system to pursuit the business intelligence. We need the proper model to guide the approach to plan building data warehouse system when we want to plan it in considering the organizational status. Therefore we suggest a model to decide the approach to build data warehouse considering the project's environmental factors. First we review Ronald S. Swift(1998)'s five environmental factors that we have to consider when planing to build data warehouse. Then we propose a model to decide DW approach by the degree of those factors to be measured. DW approaches in this model are classified in conservative approach, increasing approach, enterprise wide approach, and ideal approach.

  • PDF

A PCM PERFORMANCE EVALUATION SYSTEM FOR DESIGN/BUILD PROJECTS

  • Wen-der Yu ;Yin-shung Hsin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.397-402
    • /
    • 2005
  • Professional Construction Management (PCM) services have become more and more popular in Taiwan in the past decade. However, disputes between PCM consultant and the client on the performance of PCM services are also increasing. The evaluation of PCM performance is a tough task due to the lack of "physical product", such as the drawings finished by the architect. This paper is intended to propose a PCM performance evaluation system (PPES) based on Balanced Scorecard (BSC). A case study of PCM consultancy for a real world design/build project is conducted to demonstrate the applicability of the proposed BSC framework

  • PDF

BTL사업의 사업수행 절차 분석에 관한 연구 (On Analysis of Undertaking Accomplishment Process for the BTL Project)

  • 전진구;임종아;박용대
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.917-920
    • /
    • 2007
  • 우리나라의 민간투자 사업은 잦은 제도변경으로 많은 혼란을 격고 있지만, 2005년 1월 사회기반시설의 민간투자법 개정으로 공공서비스시설을 대중에게 제공할 수 있는 새로운 민간투자방식은 BTL(Build Transfer Lease)이 국내건설시장에 도입되었다. BTL사업은 계획에서 유지관리까지 사업의 수명주기 전 과정을 대상으로 포괄적 형태의 사업을 수행하는 것으로 사업자의 역할과 수행능력에 따라 사업의 성패가 좌우 된다. 따라서, 본 연구에서는 효율적인 BTL사업의 추진에 필요한 명확한 시스템 기준을 분석하여 사업수행의 정확성을 검증할 수 있는데 그 목적이 있다.

  • PDF

구축사례를 통한 효율적 공공기관 EA 구축 방법론 제안 (A Proposal of the Building Methodology for the Public Agency Enterprise Architecture thru the Project of MND-EA)

  • 이광제;안종득
    • 한국IT서비스학회지
    • /
    • 제7권3호
    • /
    • pp.87-95
    • /
    • 2008
  • The Law of effective building and operation for the information systems took effect at Dec. 2005. Every government and public agency have to build own enterprise architecture(EA), sometimes it's called the Information Technology Architecture(ITA), by this law. The Ministry of National Defense(MND) built the enterprise architecture(EA) during 2006. 12$\sim$2007. 11 by this law too. We knew the specific characters of the public sector thru the EA project. The public sector is less active than commercial sector and most members of the public sector are just looking on the project as a spectator. So the most of key for the success of EA is how to catch the Sponsorship and Participation of members. In this paper we propose the effective building methodology for the Enterprise Architecture of public agency applying the MND-EA. The other governments and public agencies can build own the EA easily by the proposed methodology.

AN EFFECT ANLYSIS OF RISK FACTORS FOR BUILD TRANSFER LEASE PROJECTS

  • Yang-Woo Lee;Soo-Yong Kim; Jung-Man Jung;Dae-Young Kim
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.498-508
    • /
    • 2007
  • The Build-Transfer-Lease (BTL) projects have rapidly increased under the Government support during recent years. This paper presents the risk analysis of factors affecting BTL projects in the initial phase. This study resulted in 10 significant risk factors influencing on each phase of BTL projects and then factors were grouped into each phase. The sensitivity analysis was also performed to identify risk factors with more significant influence on BTL projects. The results may useful to practitioners in order to cope with risks in initial phase of BTL projects. The paper resulted in the distribution of risks to project parties, thus it can be used as standards for risk assignment to competent authorities and private enterprises of BTL projects.

  • PDF

도시철도시설 표준화를 위한 관리체계 연구 (The Management Schema of Urban Transit Infrastructure for Standardization)

  • 이우동
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1824-1826
    • /
    • 2007
  • Since standardization project is composed of complicate system, such as vehicle, signal, electric power and railway, how to build management system of the project has influence on the success of the project for the first stage of the project. The computer system design tool supports to carry out requirement analysis, DB construction, and history and follow-up management efficiently. Therefore, the aim of this study is to investigate the method to optimize schema using computer system design tool.

  • PDF

A PROPOSAL OF CONSTRUCTABILITY REVIEW IN THE BASIC DESIGN STEP FOR DESIGN-BUILD PROJECTS

  • Sung-Wook Choi;Young-Woong Song;Yoon-Ki Choi;Dong-Woo Shin;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1150-1153
    • /
    • 2005
  • The orders of Design-Build Delivery System (DBDS) in a large and public construction project have been increasing. Single Source Responsibility (SSR) for design and construction, which contributes to quality improvement of design and construction, has been performed. The DBDS performs SSR for design and construction, but, it has not maximized effect because of the dissatisfied alternative analysis procedures which are based on constructability evaluation and the information system in the design step. In this research, Constructability Evaluation Factors (CEFs) that must be evaluated, investigated, and reflected in the basic design step for design-build projects. The CEF proposed and the business process of each conductor has been systematized. To propose constructability evaluation factors, first classify drawing information by the constructability evaluation sphere. CEFs must be proposed to evaluate factors according to interference among work items. Second, applicable CEFs must be classified by preference ranking and weight. Third, the values of constructability factors in accordance with building elements and work items, need to be calculated. Finally, the CEFs proposal will support rational decision making, design cost reduction, and quality improvement through the values for constructability of building elements and work items.

  • PDF

IMPACTS OF DESIGN-BUILD DELIVERY SYSTEM ON THE CONSTRUCTION INDUSTRY IN TAIWAN

  • Min-Ren Yan;Wei Lo;Chien-Liang Lin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1007-1012
    • /
    • 2005
  • Although the design-build (DB) delivery system has been taking great strides in the world and relevant researches have also been quite abundant, few studies have dealt with its potential impacts on the construction industry as a whole. This research first identified the potential entry barrier factors, which may hinder the market access, based on the theory of industrial economics and characteristics of DB project. Then through a nation-wide questionnaire survey involving 103 construction contractors and engineering consultants, the influences of each factor on company's competitiveness and corporate strategies were scrutinized, and consequently, the evolution of the construction industry was examined. It is found that as opposed to the traditional design-bid-build delivery system, the DB delivery system elevates competitive advantages of large organizations in terms of the financial capability, working experience, human resource, and administrative strength, and among them, the financial strength was concluded to be the most significant force in differentiating corporate strategies and widening the gap of competitiveness between companies. It is inferred if the government extensively adopts DB delivery system, large organizations that already possess the competitive advantage tend to obtain both design and construction abilities, and dominate the DB market. Small and medium sized companies will find little room to maneuver and be forced to become specialty sub-contractors.

  • PDF

설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구 (Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project)

  • 류혁준;박병주;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

주거부문(住居部門) BTL사업(事業)에서 프로젝트금용의 위험분석(危險分析)에 관한 연구(硏究) (on the Risk Analysis of Project Finance in BTL Project)

  • 송규열;정을규;임칠순
    • 한국주거학회논문집
    • /
    • 제17권6호
    • /
    • pp.83-90
    • /
    • 2006
  • The purpose of this study is to apply efficiently a successful Project Finance in BTL. To use Project Finance, it is necessary to Risk Analysis of each work step. This Risk Analysis have to repeatedly progress in overall Project Process. The differences between Corporate Finance and Project Finance are remarkably appeared in Risk Allocation and Limited Resource. To use successful Project Finance in construction industry, first, raising project confidence, second, technical : economical : lawful evaluation by Finance Expert, third, Income Guarantee for Lender or Consortium of Lending Banks, forth, Leverage Effect of Project Sponsor must be preceded.