과제정보
This research was supported by the Basic Science Research Program through the National Research Foundation of Korea (NRF) funded by the Ministry of Education (NRF-2022R1F1A1065540).
참고문헌
- Afradi, A., Ebrahimabadi, A. and Hallajian, T. (2021), "Prediction of the number of consumed disc cutters of tunnel boring machine using intelligent methods", Mining of Mineral Deposits.
- Bruland, A. (1988), "Hard rock tunnel boring", Dissertation, Norwegian University of Science and Technology.
- Butt, S. and Meschke, G. (2021). "Interaction of cutting disc with heterogeneous ground", PAMM, 20(1). https://doi.org/10.1002/pamm.202000060.
- Connors, R. (2017), "The challenges of tunnelling with slurry shield machines in mixed ground", The David Sugden Young Engineers Writing Award.
- Ellecosta, P., Kasling, H. and Thuro, K. (2018), "Tool wear in TBM hard rock drilling-backgrounds and special phenomena", Geomech. Tunn., 11(2), 142-148. https://doi.org/10.1002/geot.201800006.
- Fang, Y., Yao, Z., Xu, W., Tian, Q., He, C. and Liu, S. (2021), "The performance of TBM disc cutter in soft strata: A numerical simulation using the three-dimensional RBD-DEM coupled method", Eng. Fail. Anal., 119, 104996. https://doi.org/10.1016/j.engfailanal.2020.104996.
- Farrokh, E. (2013), "Study of utilization factor and advance rate of hard rock TBMs", PhD Thesis. PSU.
- Frenzel, C., Kasling, H. and Thuro, K. (2008), "Factors influencing disc cutter wear", Geomech. Tunn., 1(1), 55-60. https://doi.org/10.1002/geot.200800006.
- Gehring, K. (1995), "Leistungs- und Verschleissprognose im maschinellen Tunnelbau", Felsbau., 13(6), 439-448.
- Jeong, H., Zhang, N. and Jeon, S. (2018), "Review of technical issues for shield TBM tunneling in difficult grounds", J. Korean Tunn. Undergr. Sp. Assoc., 28(1), 1-24.
- Karami, M., Zare, S. and Rostami, J. (2021). "Tracking of disc cutter wear in TBM tunneling: a case study of Kerman water conveyance tunnel", Bull. Eng. Geol. Environ., 80, 201-219. https://doi.org/10.1007/s10064-020-01931-7.
- Kovari, K. and Ramoni, M. (2006), "Urban tunnelling in soft ground using TBMs", Proceedings of the International Conference and Exhibition on Tunnelling and Trenchless Technology: Tunnelling and Trenchless technology in the 21st century, Subang Jaya-Selangor Darul Ehsan, January.
- Kohavi, R. and Provost, F. (1998). "Glossary of terms", Editorial for the Special Issue On Applications of Machine Learning and the Knowledge Discovery Process.
- Kim, D., Khanh, P., Park, S., Oh, J. and Choi, H. (2020), "Determination of effective parameters on surface settlement during shield TBM", Geomech. Eng., 21(2), 153-164. https://doi.org/10.12989/gae.2020.21.2.153.
- Kim, K., Oh, J., Lee, H., Kim, D. and Choi, H. (2018), "Critical face pressure and backfill pressure in shield TBM tunneling on soft ground", Geomech. Eng., 15(3), 823-831. https://doi.org/10.12989/gae.2018.15.3.823.
- Kim, Y., Hong, J., Shin, J. and Kim, B. (2022), "Shield TBM disc cutter replacement and wear rate prediction using machine learning techniques", Geomech. Eng., 29(3), 249-258. https://doi.org/10.12989/gae.2022.29.3.249.
- Lislerud, A. (1997), "Principles of mechanical excavation", Tamrock Corp. POSI VA 97-12.
- Macias, F.J. (2016), "Hard rock tunnel boring: Performance predictions and cutter life assessments", Dissertation, Norwegian University of Science and Technology.
- Mahmoodzadeh, A., Mohammadi, M., Ibrahim, H.H., Abdulhamid, S.N., Ali, H.F.H., Hasan, A.M. and Mahmud, H. (2021), "Machine learning forecasting models of disc cutters life of tunnel boring machine", Automat. Constr., 128, 103779.
- Ministry of Construction & Transportation. (2007), "Development of an optimal excavation design model for rapid tunnel mechanization construction", Construction & Transportation R&D report.
- Ren, D.J., Shen, S.L., Arulrajah, A. and Cheng, W.C. (2018), "Prediction model of TBM disc cutter wear during tunnelling in heterogeneous ground", Rock Mech. Rock Eng., 51, 3599-3611. https://doi.org/10.1007/s00603-018-1549-3.
- Rezaei, A.H., Shirzehhagh, M. and Golasand, M.R.B. (2019), "EPB tunneling in cohesionless soils: A study on Tabriz Metro settlements", Geomech. Eng., 19(2), 153-165. https://doi.org/10.12989/gae.2019.19.2.153.
- Rostami, J. (1997), "Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure", Dissertation, Colorado School of Mines.
- Tharwat, A. (2020), "Classification assessment methods", Appl. Comput. Inform., 17(1), 168-192.
- Xiaokang, S., Yusheng, J., Zongyuan, Z., Zhiyong, Y., Zhenyong, W., Jinguo, C. and Quanwei, L. (2023), "TBM disc cutter ring type adaptability and rock-breaking efficiency: Numerical modeling and case study", Geomech. Eng., 34(1), 103-113. https://doi.org/10.12989/gae.2023.34.1.103.
- Yang, Z., Sun, Z., Fang, K., Jiang, Y., Gao, H. and Bai, Z. (2021), "Cutting tool wear model for tunnel boring machine tunneling in heterogeneous grounds", Bull. Eng. Geol. Environ., 80(7), 5709-5723. https://doi.org/10.1007/s10064-021-02298-z.
- Yu, H., Tao, J., Huang, S., Qin, C., Xiao, D. and Liu, C. (2021), "A field parameters-based method for real-time wear estimation of disc cutter on TBM cutter head", Automat. Constr., 124, 103603. https://doi.org/10.1016/j.autcon.2021.103603.