DOI QR코드

DOI QR Code

Identifying Risk Factors at Various PF Business Stages and Investigating Risk Management Measures

PF 사업단계별 리스크 인자 식별 및 위험 관리 요인에 관한 연구

  • Lee, YunHong (Dept. of Real Estate Graduate School of Real Estate Convergence, Hanyang University) ;
  • Seo, Wonkyoung (Dept. of Architectural Engineering, University of Seoul)
  • 이윤홍 (한양대학교 부동산융합대학원 부동산학과) ;
  • 서원경 (서울시립대학교 건축공학과)
  • Received : 2024.01.19
  • Accepted : 2024.03.16
  • Published : 2024.05.30

Abstract

The real estate market faced a downturn with declining sales, exacerbated by increased construction costs due to conflicts in Russia and Ukraine. Additionally, interest rates on PF loans surged following the Bank of Korea's base interest rate hike. Given these challenges, ongoing real estate development lacks feasibility as sales dwindle and business expenses soar. These risks extend beyond development firms, affecting mid-sized construction companies, second-tier financial institutions, and trust companies, posing broader risks to society. To mitigate these risks, PF risk factors were identified through credible literature and expert opinions. Using ANOVA variance analysis, key PF factors considered by each organization were examined and high-risk items were pinpointed by assessing the correlation between risk factors.

Keywords

References

  1. Chin, W., & Todd, P. (1995). On the use, usefulness, and ease of use of structural equation modeling in mis research: A note of caution, MIS Quarterly: Management Information Systems, 19(2), 237-246.  https://doi.org/10.2307/249690
  2. Go, S., & Ryu, G. (2009). Analysis on the importance of real estate project financing risks from the angle of financial institutions, Korea Real Estate Analysts Association(Kreaa), 15(1), 155-173. 
  3. Joreskog, K., & Sorbom, D. (1989). LISREL 7: A guide to the program and applications, SPSS.
  4. Kim, K. (2006). A Study on the sensitivity analysis of the financial analysis Item in apartment project. Korean Journal of Construction Engineering and Management (KJCEM), 7(1), 100-109. 
  5. Kim, S. (2006). A Study on the Management Plan Though the Analysis of Financial Risk case Studies for Housing Development Projects. Thesis, Chung-Ang University Graduate School of Construction. 
  6. Kim, S. (2008). A Study on the Determinants of Project Financing Decision and Management. Thesis, Dankook University Graduate School. 
  7. Lee, Y. (2009). Identification of risk factors and risk management in the housing development project, Ph.D. Dissertation, Hanyang University. 
  8. Lee, C., & Kim, S. (2009). Analyzing risk factors of the real estate project financial. Journal of the Architectural Institute of Korea Structure & Construction (JAIK), 25(2). 159-166. 
  9. Lee, Y. (2014). Identification of Risk Factors and Establish of Management Strategys in the Stage of Real Estate Project Financing. Ph.D. Dissertation, Hanyang University. 
  10. Lee, Y. (2020). Study on the plan for reduction of credit risk of medium-size construction companies preparing for restructuring. Korean Journal of Construction Engineering and Management (KJCEM), 21(5), 64-73. 
  11. Ong, T., & Musa, G. (2012). Examining the influences of experience, personality and attitude on SCUBA divers' underwater behaviour: A structural equation model, Tourism Management, 33(6), 1521-1534.  https://doi.org/10.1016/j.tourman.2012.02.007
  12. Park, J., & Kim, H. (2022). Analysis of success factors of real estate PF Loans by stakeholder. The Korea Reglonal Development Assoclation, 34(1), 91-108. 
  13. Shin, D. (2012). Risk Analysis Model for Apartment Complex Projects. Thesis, Kyunghee University. 
  14. Steiger. (1990). Structural model evaluation and modification: An interval estimation approach, Multivariate Behavioral Research, 25(2), 173-180.  https://doi.org/10.1207/s15327906mbr2502_4
  15. Yoo, J., & Ro, S. (2021). "A Study on the determinants of real estate project financing asset quality of savings banks." SH Urban Research & Insight (SHURI), 11(3). 169-188.  https://doi.org/10.26700/shuri.2021.12.11.3.169