Acknowledgement
This work was supported by the National Research Foundation of Korea(NRF) grant funded by the Korea government (MSIT)(No. 2021R1F1A1059478).
References
- Lee JH. Application of activity-based costing(ABC) for modular construction quality management. Journal of The Korea Institute of Building Construction. 2022 Oct;22(5):485-96. https://doi.org/10.5345/JKIBC.2022.22.5.485
- Shin HK, Kim SY, Ahn YH. A study on the potential risk analysis for the safety management in the formwork. Journal of the Korea Institute of Building Construction. 2021 Apr;21(2):121-8. https://doi.org/10.5345/JKIBC.2021.21.2.121
- Korea Iron and Steel Association. Understanding of Modular Construction. 1st ed. Seoul (Korea): Gumibook; c2021. Chapter 09. Modular construction filed work; p.189-226.
- Martilla JA, James JC. Importance-performance analysis. Journal of Marketing. 1997 Jan;41(1):77-9. https://doi.org/10.2307/1250495
- Kang SH, Kim DY, Lee, DU. Analyzing of construction safety planning tasks for performance improvement using importance performance analysis method. Journal of the Korea Institute of Building Construction. 2020 Feb;20(1):73-81. https://doi.org/10.5345/JKIBC.2020.20.1.073
- Lee UK, Kim JY. Evaluating essential aspects of novel architectural products: an in-depth application of importance-performance analysis. Journal of The Korea Institute of Building Construction. 2023 Jun;23(3):305-13. http://dx.doi.org/10.5345/JKIBC.2023.23.3.305
- Shin YS. A study on the potential risk analysis for the safety management in the formwork. Journal of The Korea Institute of Building Construction. 2021 Apr;21(2):121-8. https://doi.org/10.5345/JKIBC.2021.21.2.121
- Hampson K, Brandon P. A vision for Australia ' s property and construction industry. Construction 2020; 2004 Jun; Brisbane, Australia. Queensland (Australia): CRC Construction Innovation; 2004. pp. 24-5.
- Neelamkavil J, Shen W, Fung D, Hao Q, Xie H. Need for intelligent system for construction process automation. Canada: National Research Council Canada; 2008 Mar. 40 p. Report No.: RR-256.
- Westover L, Olearczyk J, Hermann U, Adeeb S, Mohamed Y. Analysis of rigging assembly for lifting heavy industrial modules. Canadian Journal of Civil Engineering. 2014 Apr;51(6):512-22. https://doi.org/10.1139/cjce-2013-0192
- Hyun HS, Park MS, Lee DY, Lee JH. Tower crane location optimization for heavy unit lifting in high-rise modular construction. Buildings. 2021 Mar;11(3):121-33. https://doi.org/10.3390/buildings11030121
- Dhanapal J, Ghaednia H, Das S, Velocci J. Structural performance of state-of-the-art VectorBloc modular connector under axial loads. Engineering Structures. 2019 Mar;183:496-509. https://doi.org/10.1016/j.engstruct.2019.01.023
- Helena J, John HM. Defects in offsite construction: timber module prefabrication. Construction Management and Economics. 2019 Jul;27:667-81. https://doi.org/10.1080/01446190903002797
- Westover L, Olearczyk J, Hermann U, Adeeb S, Mohamed Y. Analysis of rigging assembly for lifting heavy industrial modules. Canadian Journal of Civil Engineering. 2014 Jun;41(6):512-22. https://doi.org/10.1139/cjce-2013-0192