Acknowledgement
이 연구는 2022년도 국토교통부/국토교통과학기술진흥원의 지원에 의한 결과의 일부임. 과제번호:23AATD-C163269-03 이 연구는 2022년도 정부 미래창조과학부의 재원으로 한국연구재단의 지원을 받아 수행된 이공분야기초연구사업임. 과제번호 2019R1A2C2006983
References
- Barbosa, F., Woetzel, J., Mischke, J., Ribeirinho, M., Sridhar, M., Parsons, M., Bertram, N., & Brown, S., (2017). Reinventing construction: a route to higher productivity. McKinsey Global Institute.
- Choi, C., Ju, K., Cho, J., Seo, M., Won, J., Moon, H., Park, H., Park, S., Jung, S., Shin, J., Lee, S., & Kim, J. (2019). Analysis of Construction Automation Capability and Establishment of Future Leading Strategy. Korea Institute of Civil Engineering and Building Technology. (Report No. OTKCRK200237).
- Choi, J., Lee, D., & Kim, D. (2021). Operational Status and Improvement Issues of District Unit Planning System. KRIHS Policy Brief, 1-6.
- Eom, S. (2017). 4th Industrial Revolution, Construction Industry, and CM. Construction Engineering and Management, 18(4), 3-7.
- Hong, S., Kim, D., Gu, H., & Choo, S. (2022). Establishment of database for automated building codes compliance checking in the pre-design phase. eCAADe, 40(2), 329-338. https://doi.org/10.52842/conf.ecaade.2022.2.329
- Jun, J., & Kim, C. (2021). Developing the district unit plan simulation using procedural modeling. Journal of the Korea Academia-Industrial Cooperation Society, 22(3), 546-559. https://doi.org/10.5762/KAIS.2021.22.3.546
- Kim, Y. (2007). Changes and Roles of District Planning-Related Systems. Planning and Policy, 6-15.
- Kim, Y., Kim, H., & Kim, M. (2016). A study on the ranging of phased BIM introduction into the architectural information system. Journal of the Korea Academia-Industrial Cooperation Society, 17(10), 131-138. https://doi.org/10.5762/KAIS.2016.17.10.131
- Korea Institute of Registered Architects. (n.d.). Korea insititute of registered architects of design work process. Retrieved October 12 2022 from https://www.kira.or.kr/jsp/main/06/new7.jsp
- Koo, J. (2000). Birth and understanding of district unit plan. Journal of Urban Information Service of Korea, 41(2), 3-13.
- Lee, C., Shim, U., & Ahn, Y. (2012). A basic study on review the classification system and the process of BIM information for an automatic review of building code. Korean Journal of Construction Engineering and Management, 13(5), 45-52. https://doi.org/10.6106/KJCEM.2012.13.5.045
- Lee, H., Park, S., Kim, I., & Lee, J. (2015). A logical rule-based approach to the korea architecture code sentences for BIM-enabled design assessment systems. Journal of Korea Design Knowledge, 34, 101-110.
- Lee, S., & Kim, Y. (2011). An efficiency evaluation of the design stage in large architectural firms based on waste factors analysis. Journal of the Architectural Institute of Korea Structure & Construction, 27(1), 197-204.
- Park, I., & Park, Y. (2001). A study on the establishing concept of pre-design in design process. Journal of the Architectural Institute of Korea Planning & Design, 17(8), 67-74.
- Park, J., Lee, Y., Cho, M., & Lee, B. (1993). A study on the systematization of building regulations related to a mass housing site planning. Journal of the Architectural Institute of Korea, 9(3), 3-10.
- Seoul City Planning Portal. (n.d.). Seoul City Planning Portal Retrieved December 15, 2021 from http://urban.seoul.go.kr/4DUPIS/index.do/
- Song, S., Kim, E., & Seo, S. (2022). A study on the scope of architectural planning service and institutionalization. Journal of the Architectural Institute of Korea, 38(1), 15-24. https://doi.org/10.5659/JAIK.2022.38.1.15