초록
The welding part of the valve needs immediate action when leakage occurs due to cracks or damage. In order to repair leakage of the welding part, the valve must be separated from the pipe or replaced with a new valve. However, it is difficult to remove the valve while operating the power plant. This study presents a method to remove leakage by precisely processing the gap between the clamp and the incision part within 0.1mm while installed in the pipe system. If the external leakage is removed using a clamp on the welding part without removing the valve during operation, the time and cost required for maintenance can be reduced.