DOI QR코드

DOI QR Code

Development of 3D Visualization Tool of Construction Management Information for OSC-based Precast Concrete Buildings

OSC 공법 도입 활성화를 위한 공사정보 관리 3D Visualization Tool 개발 - PC 공사 적용 현장을 중심으로 -

  • Bae, Subin (Dept. of Architectural Engineering, Ajou University) ;
  • Cha, Heesung (Dept. of Architectural Engineering, Ajou University)
  • 배수빈 (아주대 건축학과 건축공학전공) ;
  • 차희성 (아주대 건축학과)
  • Received : 2022.08.22
  • Accepted : 2022.11.24
  • Published : 2023.03.30

Abstract

Currently, the domestic construction industry is facing issues in a shortage of skilled laborers, an increase in labor costs, a limitation of on-site work hours, and an aging population, which prolongs the construction period and reduces productivity. To resolve these issues, an off-site construction (OSC) method that produces, and transports manufactured components in a factory and assembles them at the site is drawing attention. The precast concrete (PC) method, one of the OSC methods, can handle a larger amount of information at each production stage than the conventional concrete pouring method. For this reason, clear information delivery is greatly needed. However, most PC manufacturing plants and construction sites exchange information by phone, text message, and email; this causes inefficiency and inaccuracy in information exchange. Therefore, it is necessary to develop a new system that enables project managers to transmit relevant information to PC members. In this study, a color visualization method based on the 3D/BIM system was developed for each stage of fabrication, curing, shipment, field and assembly of the PC members. The construction field managers could easily grasp the current state of building elements instantly. In addition, a pop-up function was incorporated in the system to recognize the status of construction in terms of PC member installation. This system was developed to help project managers conduct a simple yet systematic site management. As a result of this study, it is believed that it will improve the difficulty of transmitting information related to PC members, contribute to clearer information exchange, and lower the barriers to the introduction of the OSC method.

Keywords

Acknowledgement

이 연구는 2022년도 국토교통부/국토교통과학기술진흥원의 지원으로 수행되었음. 과제번호:22ORPS-C158129-03

References

  1. Abanda, F. H., Tah, J. H. M., & Cheung, F. K. T. (2017). BIM in off-site manufacturing for buildings. Journal of Building Engineering, 14, 89-102. https://doi.org/10.1016/j.jobe.2017.10.002
  2. Akmam Syed Zakaria, S., Gajendran, T., Rose, T., & Brewer, G. (2018). Contextual, structural and behavioural factors influencing the adoption of industrialised building systems: a review. Architectural Engineering and Design Management, 14(1-2), 3-26. https://doi.org/10.1080/17452007.2017.1291410
  3. Bakhshi, S., Chenaghlou, M. R., Rahimian, F. P., Edwards, D. J., & Dawood, N. (2022). Integrated BIM and DfMA parametric and algorithmic design based collaboration framework for supporting client engagement within offsite construction. Automation in Construction.
  4. Li, C. Z., Zhong, R. Y., Xue, F., Xu, G., Chen, K., Huang, G. G., & Shen, G. Q. (2017). Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction. Journal of cleaner production, 165, 1048-1062. https://doi.org/10.1016/j.jclepro.2017.07.156
  5. Li, C. Z., Xue, F., Li, X., Hong, J., & Shen, G. Q. (2018). An Internet of Things-enabled BIM platform for on-site assembly services in prefabricated construction. Automation in construction, 89, 146-161. https://doi.org/10.1016/j.autcon.2018.01.001
  6. Castillo, T., Paredes, M., Andrade, A., Arroba, V., & Guerrero, J. (2022). Off-Site Construction of Concrete Housing in the Andean Region: Advantages and Disadvantages.
  7. Ergen, E., & Akinci, B. (2008). Formalization of the flow of component-related information in precast concrete supply chains. Journal of Construction Engineering and Management, 134(2), 112-121. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:2(112)
  8. Liu, G., Nzige, J. H., & Li, K. (2019). Trending topics and themes in offsite construction (OSC) research: The application of topic modelling. Construction innovation.
  9. Ramaji, I. J., & Memari, A. M. (2015). Information exchange standardization for BIM application to multi-story modular residential buildings. In AEI 2015 (pp. 13-24).
  10. Jang, Y., Lee, J. M., & Son, J. (2022). Development and application of an integrated management system for off-site construction projects. Buildings, 12(7), 1063.
  11. Jiang, R., Mao, C., Hou, L., Wu, C., & Tan, J. (2018). A SWOT analysis for promoting off-site construction under the backdrop of China's new urbanisation. Journal of Cleaner Production, 173, 225-234. https://doi.org/10.1016/j.jclepro.2017.06.147
  12. Kwahk, G. J., Sohn, J. R., Kim, K. R., Sohn, C. B., & Kim, J. J. (1998). A Logistics Information Management System for the Prefabricated Precast Concrete Panels. Journal of the Architectural Institute of Korea Structure & Construction, 14, 87-94.
  13. Kim, T. W., Son, J. W., & Lee, J. S. (2019). Offsite Construction-Based Innovation of Apartment Houses Production System. Review of Architecture and Building Science, 63(12), 44-48.
  14. Lee, J. M., Seok, W. G., & Park, S. J. (2020). OSC-based Construction Project Integrated Management Platform. Construction Engineering and Management, 21(6), 29-32.
  15. Mun, S. H. (2021). Analysis on construction management tasks and information flow for precast concrete construction, Doctoral dissertation, Chosun University.
  16. Nawari, N. O. (2012). BIM standard in off-site construction. Journal of Architectural Engineering, 18(2), 107-113. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000056
  17. Niu, S., Yang, Y., & Pan, W. (2019). Logistics planning and visualization of modular integrated construction projects based on BIM-GIS integration and vehicle routing algorithm. Modular and Offsite Construction (MOC) Summit Proceedings, 579-586.
  18. Razkenari, M., Fenner, A., Shojaei, A., Hakim, H., & Kibert, C. (2020). Perceptions of offsite construction in the United States: An investigation of current practices. Journal of Building Engineering, 29, 101138.
  19. Sohn, J. R., Kwahk, G. J., Sohn, C. B., Kim, J. J. (1997). Information Support System for Controling the Life Cycle of Prefabricated Building Elements -Building Datebase for Managing Precast Concrete Panels. Proceeding of Annual Conference of the Architectural Institute of Korea, 17(2), 1355-1361.
  20. Sohn, J. W., & Lee, J. S. (2019). Off-Site Construction: Innovation in Construction Production System, Korean Journal of Construction Engineering and Management. 20(5), 3-7.
  21. Safapour, E., Kermanshachi, S., Kamalirad, S., & Tran, D. (2019). Identifying effective project-based communication indicators within primary and secondary stakeholders in construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 11(4), 04519028.
  22. Tam, A. (2007). Advancing the cause of precast construction in Kwai Chung. Hong Kong Engineer, 35(11), 9.
  23. Wang, Z., Wang, T., Hu, H., Gong, J., Ren, X., & Xiao, Q. (2020). Blockchain-based framework for improving supply chain traceability and information sharing in precast construction. Automation in construction, 111, 103063.
  24. Yin, X., Liu, H., Chen, Y., & Al-Hussein, M. (2019). Building information modelling for off-site construction: Review and future directions. Automation in Construction, 101, 72-91. https://doi.org/10.1016/j.autcon.2019.01.010
  25. Jeong, Y. S., Eastman, C. M., Sacks, R., & Kaner, I. (2009). Benchmark tests for BIM data exchanges of precast concrete. Automation in construction, 18(4), 469-484. https://doi.org/10.1016/j.autcon.2008.11.001
  26. Zhao, H., Liu, H., & Al-Hussein, M. (2015). Automation of Quantity Take-off for Modular Construction. Modular and Offsite Construction (MOC) Summit Proceedings, 458-465.