DOI QR코드

DOI QR Code

An Analysis on Supply and Demand Status of Engineers in Middle·Small Construction Field and Its Improvement Measures

중·소규모 건설현장의 기술인력 수급실태 분석 및 개선방안

  • Received : 2022.11.24
  • Accepted : 2022.12.22
  • Published : 2023.01.30

Abstract

This study aims to analyze the supply and demand status of small and medium-sized construction sites to present practical improvement measures that address future issues involving the shortage of construction engineers. The analysis results indicated the overall supply and demand of manpower at these construction sites was unbalanced and construction companies were special, intermediate, and CM or Eng. These companies were identified as having a serious level of express and beginner level status. The main reasons for the imbalance were avoidance of employment in the construction sector, hiring non-regular workers such as field recruitment and PJ along with preferential hiring of experienced workers. To resolve this supply and demand imbalance at small and medium-sized construction sites, this study presented a plan to introduce new technical personnel, maintain existing technical staff, train technical workers, and develop a model for predicting manpower supply.

Keywords

Acknowledgement

본 성과는 정부(과학기술정보통신부)의 재원으로 한국연구재단의 지원을 받아 수행된 연구임(NRF-2021R1A2C2006065).

References

  1. Construction & Economy Research Institute of Korea (2012). A Study on the Estimation System for the Supply and Demand of Construction Engineers, Research Report, Ministry of Land, Transport and Maritime Affairs
  2. Kim, J. Y. (1998). Status of Supply and Demand of Construction Technology Personnel and Future Prospects, Research Report, Korea Research Institute for Human Settlements.
  3. Kim, M. H. (2018). A Study on the Actual Conditions of Supply and Demand of Construction Engineers and Factors Influencing Supply and Demand and Policy Issues, Research Report, Construction & Economy Research Institute of Korea.
  4. Kim, S. K., & Cho, Y. H. (2005). An analysis of Supply and Demand of Construction Professional Engineers, Korean Journal of Construction Engineering and Management, 6(3), 178-187
  5. Kim, S. T., Park, M. S., Lee, H. S., An, S. J., & Ryu, H. K. (2007). Supply-Demand Forecasting of Principal Engineers in Construction Industry using System Dynamics, Korean Journal of Construction Engineering and Management, 8(5), 161-172
  6. Park, H. P. (2005). Supply-Demand Forecast of Engineers according to the Change of Construction Boom in Construction, Journal of the Architectural Institute of Korea, 21(12), 199-207
  7. Park, M. S. (1997). Survey Report on the Demand and Supply of the Construction Technical Manpower and Policy Implications, Research Report, Construction & Economy Research Institute of Korea.
  8. Park, H. P., & Shin, E. Y. (2009). Supply-Demand Forecast of Engineers according to the Change of Construction Engineer Qualification System, Korean Journal of Construction Engineering and Management, 10(2), 46-54
  9. Park, H. P., Ji, S. W., Lee, K. S., & Park, S. H. (2002). A Study on the Supply and Demand of Technical Manpoer in Construction, Korean Journal of Construction Engineering and Management, 3(3), 58-65