References
- Chon, H.T., Lee, S.G., Park, H.D. (1990), "Engineering geological properties of the Seoul granites for weathering grades", Journal of the Korean Institute of Mineral and Energy Resources Engineers, Vol. 27, No. 3, pp. 145-153.
- Dongbuk LRT (2019), Dongbuk line subway private participants' investment construction work (spot 1) construction drawings, pp. 1-512.
- Hanwha Corporation (2022), Hanwha electronic blasting system.
- Hwang, N.S., Lee, D.H., Lim, I.S., Kim, J.S. (2019), "A case study on the construction at near verge section of secure objects using electronic detonators", Explosives and Blasting, Vol. 37, No. 2, pp. 22-30. https://doi.org/10.22704/KSEE.2019.37.2.022
- Jung, S.W., Song, J.H., Hwang, N.S., Kim, N.S., Jung, M.S. (2022), "A case study on the applicability evaluation of electronic detonator for non-vibration excavation section", Explosives and Blasting, Vol. 40, No. 4, pp. 47-56. https://doi.org/10.22704/KSEE.2022.40.4.047
- ME (2019), Enforcement regulations of noise and vibration control act, Ministry of Environment.
- MOLIT (2006), Design and construction criteria of surface mine blasting for road works, Ministry of Land, Infrastructure and Transport.
- NSB NOW E&C (2023), Review of the excavation method for the intersection of subway line 6, pp. 1-24.
- Oh, S.Y., Lee, C.S., Lee, K.K., Lee, D.H., Lee, S.J., Park, J.H. (2017), "A study on the tunnel blasting technique with a combined application of electronic detonators and low vibration explosives in a close proximity to a safety things", Explosives and Blasting, Vol. 35, No. 4, pp. 36-47.
- YETAN ENG Co., Ltd. (2022), Dongbuk line subway private participants' investment construction work (spot 1) test blasting report, pp. 1-58.