Application of Non-Open Cut H.A.S Method to Improve Constructability

시공성 향상을 위한 비개착 H.A.S 공법 적용에 관한 연구

  • 최정열 (동양대학교 건설공학과) ;
  • 장성호 ((주)유니트엔지니어링) ;
  • 정지승 (동양대학교 건설공학과)
  • Received : 2022.09.29
  • Accepted : 2022.11.01
  • Published : 2022.11.30

Abstract

This study is a study on the application of a horizontal excavation machine system to improve constructability. In this study, the structural stability of non-covered temporary facilities was evaluated by comparing field measurements and numerical analysis. In addition, the appropriateness of the measurement results was analyzed by comparing and analyzing the results of numerical analysis with the analysis results applying the Gaussian probability density function to the measurement results. In this study, structural safety and long-term durability of the linkage were analyzed based on numerical analysis. As a result of the study, it was analyzed that the non-open cut method (H.A.S. method) of this study secures structural safety and constructability as the behavior in the actual construction process is more safe than the numerical analysis results, even if the uncertainty of the ground condition is taken into account.

본 연구는 시공성 향상을 위한 수평 굴착 기계 시스템이 적용된 비개착 공법(H.A.S. 공법)에 관한 연구로서 현장 계측과 설계 시 해석한 구조계산과 지반과 일체화된 수치해석을 비교하여 비개착 가설시설물의 구조적 안정성을 평가하였다. 또한 측정결과에 대한 가우시안 확률밀도함수를 적용한 분석결과와 수치해석 결과를 비교·분석하여 계측결과에 대한 적정성을 분석하였다. 본 연구에서는 비개착 시설물 시공 시 사용되는 강관 연결고리에 대한 구조적 안전성 및 장기 내구성을 수치해석을 바탕으로 분석하였다. 분석결과, 강관 및 강관 연결고리는 충분한 구조적 안전성 및 장기내구성을 확보할 수 있는 것으로 분석되었다. 따라서 본 연구에서 제시한 비개착 공법(H.A.S. 공법)은 지반조건의 불명확성을 감안하더라도 설계 시 고려한 수치해석결과보다 실제 현장에서의 거동이 보다 안전측으로 나타나 구조적 안전성 및 시공성 확보가 가능한 것으로 분석되었다.

Keywords

References

  1. G.Y. Lee, "A Study on Surface Settlement Prediction Method of Trenchless Technology Pipe Jacking Method", Journal of the Korea Geo-Environmental Society, Vol 16, No. 11, pp. 29-37, 2015
  2. C, J. Jang. "A Study on the Stability Analysis of the Urban Railway Structures due to the Application Non-Excavation Pipe Roof Structure Method", Master thesis, Hoseo University, 2016.
  3. W, J. Jung. "A Study on the Ground Movement Induced the Penetration Square Pipes in a Trenchless Tunnel Construction", Master thesis, DongYang University, 2021.
  4. K.Y. Eum, C.Y. Choi, J.Y. Cheon G. S. "Heaving and Settlement Test of Scale Model Depending on Shape of the Pipe during Pipe Roof Excavation" Journal of the Korean Geosynthetics Society, Vol. 9, No. 4, pp.9-15, 2010
  5. G.K. Kim, K.H. Kim, H.J. Kim, S.H. Lee, "Study on the Structural Safety for the Non-Open excavation method by Using Steel Tubular Roof", Korean Society of Disaster & Security, Vol. 2, No. 4, pp.49-57, 2009
  6. J.Y. Choi, H.S. Kim, J.S. Chung, "A Study on Track Deformation Characteristics of Turnout System by Adjacent Excavation Work on Urban Transit", Journal of the Convergence on Culture Technology(JCCT), Vol. 8, No. 5, pp. 477-482, 2022. http://dx.doi.org/10.17703/JCCT.2022.8.5.477
  7. J.Y. Choi, S.H. Kim, H.H. Lee, J.S. Chung, "Improvement of Automatic Measurement Evaluation System for Subway Structures by Adjacent Excavation", Materials, Vol. 14, No. 24, pp. 1-20, 2022. https://doi.org/10.3390/ma14247492
  8. Ansys Inc. ANSYS 2022 ANSYS Workbench 2022 R2; ANSYS Inc.; Cannonsberg, PA, USA, 2022