Comparison of Operation Strategies Considering Costs in a Railway Vehicle Assembly Shop with Flow Line Layout

흐름라인 방식의 철도차량 의장공장에서 비용을 고려한 운영전략 비교

  • Received : 2022.07.01
  • Accepted : 2022.08.16
  • Published : 2022.09.30

Abstract

Due to the characteristics of the railway system, a fleet consists of multiple railway vehicles, and a project contract is made by supplying multiple fleets to the customer. If the project fails to meet the due date, the manufacturer must compensate for the delay to the customer. In this paper, we analyze the operation strategies of the railway vehicle manufacturing factory using simulation, in which the layout adopts the concept of the flow lines, and when shortages of parts are considered. If there is a shortage of parts, the subsequent assembly process cannot proceed due to the nature of the assembly process. Thus, in order to overcome this problem, three strategies for performing assembly work are presented when the events of shortages are occurred. We also compare the strategies with respect to reduce the total cost which includes labor costs and compensation costs for delay.

철도차량은 제품의 특성상 일정한 수량의 차량이 결합되어 편성이 구성되며, 프로젝트는 복수의 편성을 고객에게 납품하는 것으로 계약이 이뤄지는데 만일 납기를 지키지 못하면 생산자가 지체보상금을 고객에게 지불해야 한다. 이 논문에서는 부품의 결품이 발생하는 상황에서 흐름라인 방식으로 운영되는 철도차량 의장공장의 운영전략에 대해 시뮬레이션을 이용하여 분석한다. 만일 부품의 결품이 발생한다면 조립공정의 특성상 후속 조립공정이 진행될 수 없다. 따라서 이 문제를 해결하기 위해 부품의 결품이 발생했을 때 조립작업을 수행하는 3가지 전략을 제시하였고, 인건비와 지체보상금을 합한 총 비용이 전략에 따라 어떻게 변화되는지 비교하였다.

Keywords

Acknowledgement

이 논문은 2021~2022년도 창원대학교 자율연구과제 연구비 지원으로 수행된 연구결과임.

References

  1. Baek, J. W. and S. K. Moon (2014) "The M/M/1 Queue with a Production-inventory System and Lost Sales", Applied Mathematics and Computation, 233(1), 534-544. https://doi.org/10.1016/j.amc.2014.02.033
  2. Baek, J. W. and S. K. Moon (2016) "A Productioninventory System with a Markovian Service Queue and Lost Sales", Journal of the Korean Statistical Society, 45(1), 14-24. https://doi.org/10.1016/j.jkss.2015.05.002
  3. Becker, C. and A. Scholl (2006) "A Survey on Problems and Methods in Generalized Assembly Line Balancing", European journal of operational research, 168, 694-715. https://doi.org/10.1016/j.ejor.2004.07.023
  4. Gershwin, S. B. (1994), Manufacturing Systems Engineering, Prentice-Hall, New Jersey, U.S.A.
  5. Ko, S. S., J. Kang, and E. Y. Kwon (2016) "An (s, S) Inventory Model with Llevel-dependent G/M/1-type Structure", Journal of Industrial and Management Optimization, 12(2), 609-624. https://doi.org/10.3934/jimo.2016.12.609
  6. Krishnamoorthy, A., D. Shajin, and B. Lakshmy (2015) "On a Queueing- inventory with Reservation, Cancellation, Common Life and Retrial", Annals of Operations Research, 247(1), 365-389. https://doi.org/10.1007/s10479-015-1849-x
  7. Moon, D.H., H.I. Cho, H.S. Kim, H. Sunwoo and J.Y. Jung (2006) "A Case Study of the Body Shop Design in an Automotive Factory Using 3D Simulation", International Journal of Production Research, 44(18-19), 4121-4135. https://doi.org/10.1080/00207540600806430
  8. Moon, D.H., D.S. Shon, Y.H. Lee and Y.W. Shin (2018) "Comparison of Flow Line Layout and Fixed-Position Layout in a Rail Vehicle Assembly Factory", Journal of the Korea Society for Simulation, 27(3), 117-129. https://doi.org/10.9709/JKSS.2018.27.3.117
  9. Moon, D.H., G.M. Baek, D.O. Kim and Y.W. Shin (2020) "Approximation of Unreliable Flow Line Considering Parts Supply and Assembly", Journal of the Korean Institute of Industrial Engineers, 46(4), 369-381.
  10. Papadopoulos, C. T., J. Li, and M. E. J. O'Kelly (2019) "A Classification and Review of Timed Markov Models of Manufacturing Systems", Computers & Industrial Engineering, 128, 219-244. https://doi.org/10.1016/j.cie.2018.12.019
  11. Tompkins, J. A., J. A. White, Y. A. Bozer, E. H. Frazelle, J. M. A. Tanchoco and J. Trevino (1996) Facilities Planning(2nd Ed.), John Wiley & Sons, New York, USA.
  12. Saffari, M., S. Asmussen, and R. Haji (2013) "The M/M/1 Queue with Inventory, Lost Sale, and General Lead Times", Queueing Systems, 75(1), 65-77. https://doi.org/10.1007/s11134-012-9337-3
  13. Schwarz, M., C. Sauer, H. Daduna, R. Kulik, and R. Szekli (2006) "M/M/1 Queueing Systems with Inventory", Queueing Systems, 54(1), 55-78. https://doi.org/10.1007/s11134-006-8710-5