References
- Akintoye, A. S., & MacLeod, M. J. (1997). Risk analysis and management in construction. International Journal of Project Management, 15(1), 31-38. https://doi.org/10.1016/S0263-7863(96)00035-X
- Bing, L., Akintoye, A., Edwards, P. J., & Hardcastle, C. (2005). The allocation of risk in PPP/PFI construction projects in the UK. International Journal of Project Management, 23(1), 25-35. https://doi.org/10.1016/j.ijproman.2004.04.006
- Bing, L., & Tiong, R. L. (1999). Risk management model for international construction joint ventures. Journal of Construction Engineering and Management, 125(5), 377-384. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:5(377)
- Dang, C. N., Le-Hoai, L., Kim, S.-Y., Van Nguyen, C., Lee, Y.-D., & Lee, S.-H. (2017). Identification of risk patterns in Vietnamese road and bridge construction. Built Environment Project and Asset Management. https://doi.org/10.1108/BEPAM-11-2015-0065
- Do, S. T., Likhitruangsilp, V., Tran, K. T., & Nguyen P. T. (2017). Risk assessment for international construction joint ventures in Vietnam. International Journal of Advanced and Applied Sciences, 4(6), 104-114. https://doi.org/10.21833/ijaas.2017.06.015
- Kapila, P., & Hendrickson, C. (2001). Exchange rate risk management in international construction ventures. Journal of Management in Engineering, 17(4), 186-191. https://doi.org/10.1061/(ASCE)0742-597X(2001)17:4(186)
- Ke, Y., Wang, S., & Chan, A. P. (2012). Risk management practice in China's Public-Private Partnership projects. Journal of Civil Engineering and Management, 18(5), 675-684. https://doi.org/10.3846/13923730.2012.723380
- Lee, J. W., & Xuan, Y. (2019). Effects of technology and innovation management and total factor productivity on the economic growth of China. Journal of Asian Finance, Economics and Business, 6(2), 63-73. https://doi.org/10.13106/jafeb.2019.vol6.no2.63
- Likhitruangsilp, V., Do, S. T., & Onishi, M. (2017). A comparative study on the risk perceptions of the public and private sectors in public-private partnership (PPP) transportation projects in Vietnam. Engineering Journal, 21(7), 213-231. https://doi.org/10.4186/ej.2017.21.7.213
- Likhitruangsilp, V., & Ioannou, P. G. (2009). Risk allocation in standard forms of general conditions for tunneling contracts. Paper presented at the Construction Research Congress 2009: Building a Sustainable Future. https://doi.org/10.1061/41020(339)127
- Likhitruangsilp, V., & Ioannou, P. G. (2012). Analysis of riskresponse measures for tunneling projects. Paper presented at the Construction Research Congress 2012: Construction Challenges in a Flat World. https://doi.org/10.1061/9780784412329.027
- Luong, D. L., Tran, D. H., & Nguyen, P. T. (2019). Hybrid multiple objective evolutionary algorithms for optimising multi-mode time, cost and risk trade-off problem. International Journal of Computer Applications in Technology, 60(3), 203-214. doi:10.1504/IJCAT.2019.100299
- Luong, D. L., Tran, D. H., & Nguyen, P. T. (2018). Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution. International Journal of Construction Management, 1-13. https://doi.org/10.1080/15623599.2018.1526630
- Mathew, S., Tran, D., & Nguyen, L. D. (2018). Examining impact of risk on cost growth in design-build projects using structural equation modeling. Paper presented at the Construction Research Congress 2018. https://doi.org/10.1061/9780784481271.064
- Mulholland, B., & Christian, J. (1999). Risk assessment in construction schedules. Journal of Construction Engineering and Management, 125(1), 8-15. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:1(8)
- Nguyen, H. M., & Bui, N. H. (2020a). Energy consumption - Economic growth nexus in Vietnam: An ARDL approach with a structural break. Journal of Asian Finance, Economics and Business, 7(1), 101-110. https://doi.org/10.13106/jafeb.2020.vol7.no1.101
- Nguyen, H. M., & Bui, N. H. (2020b). Revisiting the relationship between energy consumption and economic growth nexus in Vietnam: new evidence by asymmetric ARDL cointegration. Applied Economics Letters, 1-7. https://doi.org/10.1080/13504851.2020.1789543
- Nguyen, H. M., & Ngo, T. T. (2020). Psychological capital, organizational commitment and job performance: A case in Vietnam. Journal of Asian Finance, Economics and Business, 7(5), 269-278. https://doi.org/10.13106/JAFEB.2020.VOL7.NO5.269
- Nguyen, P.T, & Nguyen, C. P. (2020). Risk Management in Engineering and Construction: A Case Study in Design-Build Projects in Vietnam. Engineering, Technology & Applied Science Research, 10(1), 5237-5241. https://doi.org/10.48084/etasr.3286
- Nguyen, P. T. (2020). Attitude of construction workers toward labour safety. International Journal of Business Continuity and Risk Management, 10(2-3), 181-193. https://doi.org/10.1504/IJBCRM.2020.108507
- Nguyen, P. T., & Nguyen, Q. L. H. T. T. (2020). Critical Factors Affecting Construction Price Index: An Integrated Fuzzy Logic and Analytical Hierarchy Process. Journal of Asian Finance, Economics and Business, 7(8), 197-204. https://doi.org/10.13106/jafeb.2020.vol7.no8.197
- Nguyen, P. T., & Likhitruangsilp, V. (2017). Identification risk factors affecting concession period length for public-private partnership infrastructure projects. International Journal of Civil Engineering and Technology, 8(6), 342-348.
- Nguyen, P. T., Likhitruangsilp, V., & Onishi, M. (2020). Success factors for public-private partnership infrastructure projects in Vietnam. International Journal on Advanced Science, Engineering and Information Technology, 10(2), 858-865. https://doi.org/10.18517/ijaseit.10.2.5839
- Nguyen, T. A., & Nguyen, P. T. (2015). Explaining model for supervisor's behavior on safety action based on their perceptions. ARPN Journal of Engineering and Applied Sciences, 10(20), 9562-9572.
- Owolabi, H. A., Oyedele, L. O., Alaka, H. A., Ajayi, S. O., Akinade, O. O., & Bilal, M. (2020). Critical success factors for ensuring bankable completion risk in PFI/PPP megaprojects. Journal of Management in Engineering, 36(1), 04019032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000717
- Pham, C. P., Nguyen, P. T, Phan, P. T., Nguyen, Q. L. H. T. T., N., Le, L. P., & Duong, M. T. H. Risk Factors Affecting Equipment Management in Construction Firms. Journal of Asian Finance, Economics and Business, 7(11), 347-356. https://doi.org/10.13106/jafeb.2020.vol7.no11.347
- Phong, N. T., Likhitruangsilp, V., & Onishi, M. (2017). Developing a stochastic traffic volume prediction model for public-private partnership projects. Paper presented at the AIP Conference Proceedings. https://doi.org/10.1063/1.5011564
- Ren, H. (1994). Risk lifecycle and risk relationships on construction projects. International Journal of Project Management, 12(2), 68-74. https://doi.org/10.1016/0263-7863(94)90012-4
- Shen, L. Y. (1997). Project risk management in Hong Kong. International Journal of Project Management, 15(2), 101-105. https://doi.org/10.1016/S0263-7863(96)00045-2
- Shen, L. Y., Wu, G. W., & Ng, C. S. (2001). Risk assessment for construction joint ventures in China. Journal of Construction Engineering and Management, 127(1), 76-81. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:1(76)
- Vo, K. D., Nguyen, P. T., Nguyen Q. L. H. T. T. (2020). Disputes in Managing Projects: A Case Study of Construction Industry in Vietnam. Journal of Asian Finance, Economics and Business, 7(8), 635-644. https://doi.org/10.13106/jafeb.2020.vol7.no8.635
- Yap, J. B. H., Chow, I. N., & Shavarebi, K. (2019). Criticality of construction industry problems in developing countries: Analyzing Malaysian projects. Journal of Management in Engineering, 35(5), 04019020. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000709
Cited by
- Sustainability of Business through Project Risk Identification with Use of Expert Estimates vol.13, pp.11, 2021, https://doi.org/10.3390/su13116311