DOI QR코드

DOI QR Code

A Study on Strategy and Utilization for Practical Application of BIM in MEP Area

국내 MEP 분야 BIM 활용 실태 조사 및 실무 적용 활성화 방안 제시

  • 김이제 (성균관대학교 미래도시융합공학과) ;
  • 김용인 (나우설비기술(주)) ;
  • 김인채 (성균관대학교 미래도시융합공학과) ;
  • 진상윤 (성균관대학교 건설환경공학부/미래도시융합공학과)
  • Received : 2020.11.25
  • Accepted : 2020.11.30
  • Published : 2020.12.31

Abstract

In the MEP(Mechanical Electrical and Plumbing) field, the utilization of BIM-based drawings is lower than in the architectural and structural sectors, and the limited BIM collaboration problem caused by different levels of BIM utilization in each field is becoming a serious problem in adoption and utilizing BIM. Therefore, this study analyzed the current status of BIM application in the field of mechanical equipment in the construction industry and analyzed the practical problems and limitations of adoption and utilizing BIM from a corporate perspective based on Delphi analysis techniques. Based on the results of the analysis, the limitations of the current MEP BIM application were classified into economic, technical, institutional, and social factors to derive detailed items, and, accordingly, the improvement measures were classified as institutional, policy, and technical measures. As a result, the company intends to maximize the value of BIM utilization in the MEP field by presenting improvement plans to activate BIM in the field of mechanical equipment based on the opinions of the company, thereby laying the foundation for BIM in the construction industry by creating a collaborative BIM environment for each sector in the domestic construction industry.

Keywords

References

  1. Hong, S. S., Hong, W. H., Lee, H. J. (2011). Understanding The MEP Design Level Through BIM . Journal of Computational Structural Engineering Institute of Korea, 24(1), pp. 247-252.
  2. Kim, B. J., Kim, Y. J., Chin, S. Y. (2018). A development of a checklist to check the consistency of BIM and drawings at the construction documentation phase. KIBIM Magazine 8(1), pp. 33-42.
  3. Kim, E. G., Aum, P. H., Kim, I. H. (2014). A Study on Building the Work Environment to Utilize BIM for Domestic Architectural Firms. JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA Planning & Design, 30(3), pp. 121-128. https://doi.org/10.5659/JAIK_PD.2014.30.3.121
  4. Kim, J. H. (2011). The Needs for Training Manpower and the Change in Construction Environment by Equipment Based BIM Design. Journal of The Korean Society of Industry Convergence 14(4), pp. 157-165. https://doi.org/10.21289/KSIC.2011.14.4.157
  5. Kim, M. J., Lee, K. H., Son, C. B. (2014). An Status Analysis on the BIM Utilization and Its Improvement Measures in Domestic Architects. JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA Structure & Construction 30(8), pp. 79-86. https://doi.org/10.5659/JAIK_SC.2014.30.8.79
  6. Kim, S. A., Park, C. H., Chin, S. Y. (2016). Assessment of BIM acceptance degree of Korean AEC participants. KSCE Journal of Civil Engineering, 20(4), pp. 1163-1177. https://doi.org/10.1007/s12205-015-0647-y
  7. Kim, W. J. (2019). Development of Model Requirements Checklist for Utilizing BIM in Construction Phase - Focused on the MEP -. Journal of The Korean Institute of Construction Engineering And Management, 20(1), pp. 22-31.
  8. Kim, Y. J., Chin, S. Y. (2019). An analysis of the problems of BIM-based drawings and implementation during the construction document phase. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 36.
  9. Kim, Y. J., Chin, S. Y. (2019). Analyzing the Necessity and Application of Early Involvement of Specialty Contractors for Efficient Utilization of BIM Korean Journal of Computational Design and Engineering 24(1), pp. 19-29.
  10. Kim, Y. J., Kim, H. S., Kim, M. K. (2016). Support plan for introduction of BIM on Small and Medium Architectural firm. Journal of the Korea Academia-Industrial cooperation Society 17(9), pp. 669-679. https://doi.org/10.5762/KAIS.2016.17.9.669
  11. Lee, J. G., et al. (2016). Selecting Quantifiable Indicators for Evaluating BIM-based Design Collaboration Performance. JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA Planning & Design 32(10), pp. 35-43. https://doi.org/10.5659/JAIK_PD.2016.32.10.35
  12. Lee, J. H., Yi, J. S.(2011). A Study on BIM Capability Evaluation for Design Organizations. JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA Planning & Design 27(6), pp. 257-266.
  13. Lee, S. K., Yu, J. H. (2013). Key Factors Affecting BIM Acceptance in Construction. JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA Planning & Design 29(8), pp. 79-86. https://doi.org/10.5659/JAIK_PD.2013.29.8.79
  14. Linstone, H. A., and Murray, T., eds. (1975). The delphi method. Reading, MA: Addison-Wesley.
  15. Park, J. E., Park, H. J., Yee, J. J. (2013). Apply of Information Deduction and Understanding Verification for BIM based Mechanical Equipment Design. Journal of The Regional Association of Architectural Institute of Korea 9(1), pp. 505-508.
  16. Park, J. H., Lee, S. K., Yu, J. H. (2015). Analysis of Key Factors affecting BIM performance using fsQCA. JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA Planning & Design 31(4), pp. 29-36. https://doi.org/10.5659/JAIK_PD.2015.31.4.29
  17. Park, K. H., Chin, S. Y. (2015). A Study on the Improvement of BIM Request for Proposal by Analyzing Problems of Public Construction BIM Delivery Guides. JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA Planning & Design 31(3), pp. 57-68. https://doi.org/10.5659/JAIK_PD.2015.31.3.57
  18. Park, K. J. (2017). A Study on Improvement of BIM(Building Information Modeling) Working Environment in Architectural Design Area Using API(Application Program Interface). The Korean Society of Science & Art 30, pp. 107-117. https://doi.org/10.17548/ksaf.2017.09.30.107
  19. Seo, H. C., Oh, J. K., Kim, J. J. (2012). The Development of an Evaluation Model for the Work Environment of the BIM based Architectural Design Firms. JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA Planning & Design 28(5), pp. 95-105. https://doi.org/10.5659/JAIK_PD.2012.28.5.95
  20. Seo, J. C., Kim, I. H. (2009). A Study on the Basic Directions for Introducing and Applying Building Information Modeling in the Public onstruction Project Delivery. JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA Planning & Design 25(9), pp. 21-30.
  21. Yoon, S. W. (2015). A Proposal for Using BIM Model Created in Design to Construction Phase-Case Study on preconstruction adopting BIM. Journal of KIBIM 5(4), pp. 1-10. https://doi.org/10.13161/kibim.2015.5.4.001