Abstract
In this paper we proposed the test design method of reliability growth management. First, we presented the process for establishing the reliability growth management test design considering the number of failures and the termination test time. Reliability growth analysis of continuous system was performed in accordance with the test design process presented. In case the reliability test result is not met with the reliability target value after more than three failures occurred, the required test times were analyzed that 1,725 hrs for one corrective action, 1,950 hrs for two corrective actions. If the number of failures is less than three, design a reliability demonstration test according to confidence level 80% and 90% was performed using RGA 11 Software. As a result, it is possible to establish the reliability growth management test design with sufficient use of available resources. The results of this study can be used when establishing a test design for assessment of reliability growth management of all continuous systems.