국내 건설 현장 타워크레인의 사용량 증가에 따른 재해 감소를 위한 연구가 진행되고 있지만 무인타워크레인에 대한 연구는 미비한 실정이다. 따라서 본 연구에서는 타워크레인 유형별 사고 요인의 중요도 순위를 AHP 분석을 통해 도출하여 제시하고자 한다. 분석 결과 무인타워크레인에서 인양 작업이 가장 높은 중요도를 보였다. 본 연구 결과를 바탕으로 중요도가 높은 요인을 우선적으로 관리하여 타워크레인 사고 저감을 위한 조치가 필요할 것으로 사료된다.

In Korea construction industry, researches are being conducted to reduce the disasters related tower crane due to the increase of tower crane's usage and accidents continuously. Although the usage amount of remote control tower crane has been increasing recently, the research on remote-control tower crane is insufficient. In this study, the importance ranking of remote control tower crane's accident factors derived by AHP analysis. AHP questionnaire was conducted to engineers (or operators) like construction site engineer, construction manager, safety engineer, and tower crane operator, who have more than 10 years career. The results of AHP analysis reveal that top ranking factor of remote control tower crane's accident is lifting work for materials. Therefore, the high importance factors should be managed, and taken the priority measures for reducing the tower crane accidents by using the results of this research.

키워드

참고문헌

  1. Ministry of Land, Infrastructure and Transport [Internet]. Seoul (Korea): Korea Statistical Information Service; 2020-[cited 2020 Jul 27]. Available from: http://kosis.kr
  2. Choi CH. A study on the risk analysis and measures of reduction through tower crane accidents cases [master's thesis]. [Seoul (Korea)]: Hanyang University; 2017. 57 p.
  3. Ministry of Land, Infrastructure and Transport [Internet]. Seoul (Korea): Ministry of Land, Infrastructure and Transport; 2020-[cited 2020Jul 27]. Available from:http://www.molit.go.kr
  4. Kim YU. Problems and improvement schemes for unmanned tower crane accident through case analysis at construction site [master's thesis]. [Seoul (Korea)]: Chung-Ang University; 2018. 124 p.
  5. Aneziris ON, Papazoglou IA, Mud ML, Damen M, Kuiper J, Baksteen H, Ale BJ, Bellamy LJ, Hale AR, Bloemhoff A, Post JG, Oh J. Towards risk assessment for crane activities. Safety Science. 2008 Jun;46(6):872-84. https://doi.org/10.1016/j.ssci.2007.11.012
  6. Kwon OM. Deduction of accident cause for tower-crane using fmea method [master's thesis]. [Seoul (Korea)]: Hanyang University; 2015. 60 p.
  7. Neitzel RL, Seixas NS, Ren KK. A review of crane safety in the construction industry. Applied Occupational and Environmental Hygiene. 2001 Nov;16(12):1106-17. https://doi.org/10.1080/10473220127411
  8. Shapira A, Simcha M. AHP-based weighting of factors affecting safety on construction sites with tower cranes. Journal of Construction Engineering and Management. 2009 Apr;135(4):307-18. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:4(307)
  9. Cho YR. Importance evaluation of the safety accident factors of tower crane using analytic hierarchy process [master's thesis]. [Suwon (Korea)]: Kyonggi University; 2017. 95 p.
  10. Song PY. A study on improvement of safety management through analysis of tower crane disaster at construction site [master's thesis]. [Busan (Korea)]: Pukyong University; 2018. 104 p.
  11. Chi HL, Chen YC, Kang SC, Hsieh SH. Development of user interface for tele-operated cranes. Advanced Engineering Informatics. 2012 Nov;26(3):641-52. https://doi.org/10.1016/j.aei.2012.05.001
  12. Kim JY, Kim GH. Importance ranking of accident factors of construction tower crane by AHP technique. Journal of Building Construction and Planning Research. 2020 Dec;8(4):237-44. https://doi.org/10.4236/jbcpr.2020.84015
  13. Cho GT, Cho YG, Kang HS. The analytic hierarchy process. Seoul (Korea): Donghun; 2003. 311 p.
  14. Kim YG. Importance rankings of prospective owners' selection factors on the each room's finishing for minus option of apartment by ahp [master's thesis]. [Suwon (Korea)]: Kyonggi University; 2020. 69 p.
  15. Korea Occupational Safety and Health Agency. Technical guidelines for the installation, assembly and dismantling of tower cranes. Ulsan (Korea): Korea Occupational Safety and Health Agency. 2011. p. 1-19.
  16. Korea Occupational Safety and Health Agency [Internet]. Ulsan (Korea): Korea Occupational Safety and Health Agency; 2020-[cited 2020 Jul 27]. Available from: http://www.kosha.or.kr/kosha/data/construction.do
  17. Korea Occupational Safety and Health Agency. Safety work guide to prevent death of construction machinery and equipment. Ulsan (Korea): Korea Occupational Safety and Health Agency. 2018. p. 1-97.
  18. Lee HC. Collective decision making. Seoul (Korea): Sejong; 2000. 186 p.