• Title/Summary/Keyword: tower crane

Search Result 113, Processing Time 0.031 seconds

Importance Ranking of Accident Factors of Remote Control Tower Crane by AHP (AHP 분석에 의한 무인타워크레인 사고 요인의 중요도 순위)

  • Kim, Ju-Yong;Jung, Young-Chul;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.497-504
    • /
    • 2020
  • In Korea construction industry, researches are being conducted to reduce the disasters related tower crane due to the increase of tower crane's usage and accidents continuously. Although the usage amount of remote control tower crane has been increasing recently, the research on remote-control tower crane is insufficient. In this study, the importance ranking of remote control tower crane's accident factors derived by AHP analysis. AHP questionnaire was conducted to engineers (or operators) like construction site engineer, construction manager, safety engineer, and tower crane operator, who have more than 10 years career. The results of AHP analysis reveal that top ranking factor of remote control tower crane's accident is lifting work for materials. Therefore, the high importance factors should be managed, and taken the priority measures for reducing the tower crane accidents by using the results of this research.

Basic Study for Setting Service Life of Tower Crane (타워크레인 사용 연한 설정을 위한 기초 연구)

  • Kim, Ki-Hyuke;Oh, Chae-Won;Lee, Donghoon
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.1
    • /
    • pp.1-8
    • /
    • 2019
  • Recently, as development of building construction technology, height of building continues increase. But, there is no clear ground of service life of tower crane. So, accident in the tower crane continues to occur. In addition to Korea, there is no clear ground for the serive life of tower cranes overseas. For this reason, this study aims to establish the maximum service life of tower crane. Accidents in tower cranes continues to increase, and the cause of the accident is that there are no ground of limitations for service life of tower cranes. Therefore, in this study, the maximum service life of the tower crane was calculated by using the information of the hoisting case of the tower crane to limit the model year of the tower crane. The results of this study are as follows; As the number and time of the hoisting work increases, the maximum service life of the tower crane decreases. In addition, since this study refers to European standards, it is necessary to establish standards for domestic situations. Result of this study, we expect decrease accidents in tower crane. And it is expected that the service life of tower crane will be more clear if this study is developed.

TRACKING LIFT-PATHS OF A ROBOTIC TOWERCRANE WITH ENCODER SENSORS

  • Suyeul Park;Ghang, Lee;Joonbeom cho;Sungil Hham;Ahram Han;Taekwan Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.250-256
    • /
    • 2009
  • This paper presents a robotic tower-crane system using encoder and gyroscope sensors as path tracking devices. Tower crane work is often associated with falling accidents and industrial disasters. Such problems often incur a loss of time and money for the contractor. For this reason, many studies have been done on an automatic tower crane. As a part of 5-year 23-million-dollar research project in Korea, we are developing a robotic tower crane which aims to improve the safety level and productivity. We selected a luffing tower crane, which is commonly used in urban construction projects today, as a platform for the robotic tower crane system. This system comprises two modules: the automated path planning module and the path tracking module. The automated path planning system uses the 3D Cartesian coordinates. When the robotic tower crane lifts construction material, the algorithm creates a line, which represents a lifting path, in virtual space. This algorithm seeks and generates the best route to lift construction material while avoiding known obstacles from real construction site. The path tracking system detects the location of a lifted material in terms of the 3D coordinate values using various types of sensors including adopts encoder and gyroscope sensors. We are testing various sensors as a candidate for the path tracking device. This specific study focuses on how to employ encoder and gyroscope sensors in the robotic crane These sensors measure a movement and rotary motion of the robotic tower crane. Finally, the movement of the robotic tower crane is displayed in a virtual space that synthesizes the data from two modules: the automatically planned path and the tracked paths. We are currently field-testing the feasibility of the proposed system using an actual tower crane. In the next step, the robotic tower crane will be applied to actual construction sites with a following analysis of the crane's productivity in order to ascertain its economic efficiency.

  • PDF

A study on risk factors having effect on perception of tower crane incident risk (타워크레인 사고 위험 지각에 영향을 미치는 위험 요인에 관한 연구(타워크레인 업무유형의 조절효과를 중심으로))

  • Eun, Nam-Gwon;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.3
    • /
    • pp.33-45
    • /
    • 2016
  • Construction sites have gradually become bigger and bigger according to Korea economic growth. Also use of tower crane and other heavy equipment has been increased. The increased use of heavy equipment like tower crane is leading to fatality incident. This study will verify hazards to influence tower crane incident through structural and positive verification and find which hazard influence incident risk. The result of this study is as follows. First, while there is a significant difference between safety managers and tower crane operators for working environment, safety management, personal manage among risk factors, we can not find any evidence on the difference in perception of tower crane incident risk between them. Second, task manage risk and personal manage risk has a significant positive effect on perception of tower crane incident risk. Third, while site environment risk has a significant positive moderating effect of task type between risk factors and perception of tower crane incident risk, personal environment risk has a significant negative moderating effect between them.

A Fundamental Research to Safety at Tower Crane Major Work (타워크레인 주요 작업의 안전성에 관한 기초 연구)

  • Lee, Sung-Ho;Joo, Jin-Kyu;Lee, Goon-Jae;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.151-152
    • /
    • 2011
  • As recent construction projects aim to build higher and bigger buildings, lifting operation is getting increasingly important in construction sites. Accordingly, as tower cranes get higher and higher, disasters involving tower cranes are also on the rise. According to occupational incident statistics of the Korea Occupational Health & Safety Agency (KOHSA), most of such incidents occur in installation, dismantling and climbing phases of tower crane. Therefore, it is essential to develop preventative measures to secure safety of tower crane operations, with critical focus on installation, dismantling and climbing of tower crane. Hence, this research attempts to measure criticality of key risk factors in installation, dismantling and climbing phases of tower crane on construction site and propose necessary safety measures. As a result, conclusions herein will contribute to minimize disasters and incidents involving tower cranes in high-rise building construction sites.

  • PDF

Input Shaper Design for Tower Crane in Consideration of Nonlinear Coupled Motions (타워크레인의 비선형 연성 운동 특성을 고려한 입력성형기 설계)

  • Kim, Byung-Gyu;Hong, Seong-Wook
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.26 no.9
    • /
    • pp.88-95
    • /
    • 2009
  • Input shaping has been a very effective control method for reducing payload swing in industrial bridge and gantry cranes. However, conventional input shapers often degrade performance when applied to tower cranes because of the nonlinear coupled dynamics between rotational and radial motions in tower cranes. To alleviate this problem, a new input shaper for tower cranes is developed by means of dynamic modeling, analysis and optimization. This work investigates the tower crane dynamics along with parameters of the tower crane varied. A performance index for input shaper design is proposed so as to reduce the coupled residual vibration of a tower crane using only rotational motion of tower crane. The proposed new input shaper is verified to be effective through simulations and experiments.

Field Survey on Suitable In-service Wind Speed Limit for Tower Crane Operation (타워크레인의 작업 중지 풍속에 대한 현장 실태 조사 연구)

  • Lee, Eui Ju;Shin, Sung Woo
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.1
    • /
    • pp.103-108
    • /
    • 2018
  • Since tower cranes are susceptible to wind loads, the operation of the tower crane should be ceased when it exposed to a strong wind. For this reason, even in Korea, the operation limit for wind loading on the tower crane is regulated by a law. Recently the Korean law in which provided the wind speed limit to cease the tower crane operation has been revised from "instantaneous wind speed of 20 m/s" to "instantaneous wind speed of 15 m/s". Although this revision is expected to reduce safety risks in tower crane operation, some field operators still insist to lower the wind speed limit. However, in many countries "wind speed of 20 m/s" is normally used as the maximum in-service wind speed for tower cranes. Therefore, the investigation of the proper wind speed for regulation would be helpful to secure the safety of the tower crane operation under windy condition. In this study the validity of the revised wind speed limit is investigated with the surveys targeted to both tower crane practitioners and parties of concerned in construction companies, in which various questions was provided for a suitable wind speed limit and the answers were analyzed. The results showed that the revised wind speed limit is acceptable to tower crane practitioners as well as the parties of concerned in construction companies and is satisfying the structural stability requirement for in-service state tower crane. Therefore, it can be concluded that the revised wind speed limit is valid in humanly safety point of view.

A Study on the Safety Inspection System Model of The Tower Crane a Construction Site in Korea (국내 건설현장 타워크레인 안전진단 관리시스템 모델에 관한 연구)

  • Yoon, In-Soo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.1
    • /
    • pp.37-49
    • /
    • 2007
  • The tower cranes are widely used in very useful construction machine the sites of constructing high-structure and have a structural sensitiveness. Therefore, the accidents have often happened due to the deficiency of laborer's understanding and lack of safety of structure. Till now, as we have research and studied above, we can properly protect accidents by construction equipments particularly crane as well as most disasters which occur frequently in construction site. The goal of this study is the safety inspection model of the tower crane a construction site, which preventible the collapse accident of tower crane which is constructed by using the correcting frame. In order to accomplish the goal of this study, the field survey, the reference investigation and the structure analysis were performed for the collapse accident of tower crane using the correcting data. This study will be proposed a build-up solutions about operating and release of safety constructions and researched about software safety estimation. Also, preventing safety problems of Tower Crane Construction site as applying safety estimation program and laws and regulations. As a result, The real time control of tower crane inspection system is implemented by to illustrate the application of the adopted optimal design model.

A new design method for site-joints of the tower crane mast by non-linear FEM analysis

  • Ushio, Yoshitaka;Saruwatari, Tomoharu;Nagano, Yasuyuki
    • Advances in Computational Design
    • /
    • v.4 no.4
    • /
    • pp.343-365
    • /
    • 2019
  • Among the themes related to earthquake countermeasures at construction sites, those for tower cranes are particularly important. An accident involving the collapse of a crane during the construction of a skyscraper has serious consequences, such as human injury or death, enormous repair costs, and significant delays in construction. One of the causes of deadly tower crane collapses is the destruction of the site joints of the tower crane mast. This paper proposes a new design method by static elastoplastic finite element analysis using a supercomputer for the design of the end plate-type tensile bolted joints, which are generally applied to the site joints of a tower crane mast. This new design method not only enables highly accurate and reliable joint design but also allows for a design that considers construction conditions, such as the introduction of a pre-tension axial force on the bolts. By applying this new design method, the earthquake resistance of tower cranes will undoubtedly be improved.

The study on the safety inspection system model of the tower crane a construction site in Korea (국내 건설현장 타워크레인 안전진단 관리시스템 모델에 관한 연구)

  • Yeon, In-Soo;Seo, Jang-Hoon;Kang, Kyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.11a
    • /
    • pp.499-507
    • /
    • 2006
  • The tower cranes are widely used in very useful construction machine the sites of constructing high-structure and have a structural sensitiveness. Therefore, the accidents have often happened due to the deficiency of laborer's understanding md lack of safety of structure. Till now, as we have research and studied above, we can properly protect accidents by construction equipments particularly crane as well as most disasters which occur frequently in construction site. The goal of this study is the safety inspection model of the tower crane a construction site, which preventible the collapse accident of tower crane which is constructed by using the correcting frame. In order to accomplish the goal of this study, the field survey, the reference investigation and the structure analysis were performed for the collapse accident of tower nine using the correcting data. This study will be proposed a build-up solutions about operating and release of safety constructions and researched about software safety estimation. Also, preventing safety problems of Tower Crane Construction site as applying safety estimation program and laws and regulations. As a result, The real time control of tower crane inspection system is implemented by to illustrate the application of the adopted optimal design model.

  • PDF