DOI QR코드

DOI QR Code

Risk analysis of offshore terminals in the Caspian Sea

  • Received : 2019.01.28
  • Accepted : 2019.05.13
  • Published : 2019.09.25

Abstract

Nowadays in offshore industry there are emerging hazards with vague property such as act of terrorism, act of war, unforeseen natural disasters such as tsunami, etc. Therefore industry professionals such as offshore energy insurers, safety engineers and risk managers in order to determine the failure rates and frequencies for the potential hazards where there is no data available, they need to use an appropriate method to overcome this difficulty. Furthermore in conventional risk based analysis models such as when using a fault tree analysis, hazards with vague properties are normally waived and ignored. In other word in previous situations only a traditional probability based fault tree analysis could be implemented. To overcome this shortcoming fuzzy set theory is applied to fault tree analysis to combine the known and unknown data in which the pre-combined result will be determined under a fuzzy environment. This has been fulfilled by integration of a generic bow-tie based risk analysis model into the risk assessment phase of the Risk Management (RM) cycles as a backbone of the phase. For this reason Fault Tree Analysis (FTA) and Event Tree Analysis (ETA) are used to analyse one of the significant risk factors associated in offshore terminals. This process will eventually help the insurers and risk managers in marine and offshore industries to investigate the potential hazards more in detail if there is vagueness. For this purpose a case study of offshore terminal while coinciding with the nature of the Caspian Sea was decided to be examined.

Keywords

References

  1. Abrahamsson, M. (2000), Uncertainty in quantitative risk analysis-characterization and methods of treatment. Report No: 1024 (ISSN: 1402-3504), Department of Fire Safety Engineering, Lund University, Sweden.
  2. ABS, American Bureau Shipping (2019), A guide for risk evaluations for the classification of marine-related facilities 2003. Available at: www.absconsulting.com Accessed on: 08.01.2019.
  3. ABS, American Bureau Shipping (2019), Risk assessment applications for marine and offshore oil and gas industries, 2000. Available at: www.absconsulting.com Accessed on: 08.01.2019.
  4. ABS, American Bureau Shipping (2019), Thesis Bow-tie, Solution for the management of risk, 2007. Available at: www.absconsulting.com Accessed on: 08.01.2019.
  5. Agarwal, H., Renaud, E.J., Preston, L.E. and Padmanabhan, D. (2004), "Uncertainty quantification using evidence theory in multidisciplinary design optimization", Reliab. Eng. Syst. Saf., 85, 281-294. https://doi.org/10.1016/j.ress.2004.03.017
  6. AIChE,American Institute of Chemical Engineers(2002),Guidelines for Chemical Process Quantitative Risk Analysis.Second edition, New York.
  7. Andrew, J.D. and Ridley, L.M. (2002), "Application of the cause-consequence diagram method to static systems", Reliab. Eng. Syst. Saf., 75, 47-58. https://doi.org/10.1016/S0951-8320(01)00113-2
  8. Andrews, J.D. and Moss, R.T. (2002), Reliability and Risk Assessment.Second edition, Professional Engineering Publishing, UK.
  9. Aneziris, O.N., Papazoglou, I.A., Konstantinidou, M. and Nivolianitou, Z. (2014), "Integrated risk assessment for LNG terminals", J. Loss Prevent. Proc., 28, 23-35. https://doi.org/10.1016/j.jlp.2013.07.014
  10. Anoop, M.B., Balaji, R.K. and Gopalakrishnan, S. (2006), "Conversion of probabilistic information into fuzzy sets for engineering decision analysis", Comput. Struct., 84, 141-155. https://doi.org/10.1016/j.compstruc.2005.09.017
  11. Ayyub, B. and Klir, J.G. (2006), Uncertainty Modelling and Analysis in Engineering and the Sciences, Chapman and Hall/CRC.
  12. Bae, H., Grandhi, V.R. and Canfield, A.R. (2004), "An approximation approach for uncertainty quantification using evidence theory", Reliab. Eng. Syst. Saf., 86, 215-225. https://doi.org/10.1016/j.ress.2004.01.011
  13. Balli, S. and Korukoglu, S. (2009), "Operating system selection using fuzzy AHP and TOPSIS methods", Math. Comput. Appl., 14(2), 119-130.
  14. Barannik, V., Borysova, O. and Stolberg, F. (2004), "The Caspian Sea region: Environmental change", Royal Swedish Academy of Sciences, 33, 1-2.
  15. Bellamy, L.J., Alea, B.J.M., Geyerc, T.A.W., Goossensd, L.H.J., Haled A.R., Ohe, J., Mude, M., Bloemhofe, A., Papazoglouf, I.A. and Whistong, J.Y. (2007), "Story builder, a tool for the analysis of accident reports", Reliab. Eng. Syst. Safe., 92, 735-744. https://doi.org/10.1016/j.ress.2006.02.010
  16. Blom, H.A.P., Everdij, M.H.C. and Daams, J. (1999), ARIBA Final Report Part II: Safety Cases for a new ATM operation, NLR report TR-99587, Amsterdam.
  17. CCPS, Centre for Chemical Process Safety (2000), Guideline for Chemical Process Quantitative Risk Analysis, New York: Centre for Chemical Process Safety, American Institute of Chemical Engineers (AIChE).
  18. Chang, D.Y. (1996), "Applications of the extent analysis method on fuzzy AHP", Eur. J. Operational Res., 95, 649-655. https://doi.org/10.1016/0377-2217(95)00300-2
  19. Chen, C.T. (2000), "Extensions of the TOPSIS for group decision-making under fuzzy environment", Fuzzy Set. Syst., 114, 1-9. https://doi.org/10.1016/S0165-0114(97)00377-1
  20. Cheng, C.W. and Lan, A.L.H. (2004), "Web access failure analysis fuzzy reliability approach", Int. J. Comput. Internet Management, 12(1), 65-73.
  21. Chiara, V. and Giuseppe, M. (2014), "Risk analysis of LNG terminal: Case study", Chem. Eng. T., 36, 277-282.
  22. CIS, Chemical Industries Association (1992), A guide to Hazard and Operability Studies.
  23. Clemen, R.T. and Winkler, R.L. (1999), "Combing probability distribution from experts in risk analysis", Risk Anal., 19(2), 187-203. https://doi.org/10.1111/j.1539-6924.1999.tb00399.x
  24. CMPT. (1999), A Guide to quantitative risk assessment for offshore installations. The centre of marine and petroleum technology, UK.
  25. CNN Report. (2019), Available at: https://edition.cnn.com/2013/10/17/world/europe/chechnya-fast-facts/index.html. Accessed on 21. January. 2019.
  26. Cockshott, J.E. (2005), "Probability bow-ties. A transparent risk management tool", Process Saf. Environ. Protection, 83(4), 307-316. https://doi.org/10.1205/psep.04380
  27. DETR. Department of Transport, Port Marine Safety Code (2000), ISBN: 1 85112 365 2.
  28. Dickson, G.C.A. (2003), Risk Analysis. The Institution of Risk Management, IRM, Witherby Publishing.
  29. DNV, Det Norske Veritas (2000), Frequency analysis of accidental oil releases for FPSO operations in the Gulf of Mexico. Final Report, Houston.
  30. Dokas, I.M., Karras, D.A. and Panagiotakopoulos, D.C. (2009), "Fault tree analysis and fuzzy expert systems: Early warning and emergency response of landfill operations", Environ. Model. Softw., 24, 8-25. https://doi.org/10.1016/j.envsoft.2008.04.011
  31. Druschel, R.B., Ozbek, M. and Pinder, G. (2006), "Application of Dempster-Shafer theory to hydraulic conductivity", Proceedings of the CMWR-XVI, Conference Programme Copenhagen, Denmark.
  32. Edwards, C.J. (1999), "Developing a safety case with an aircraft operator", Proceedings of the 2nd Annual Two-Day Conference on Aviation Safety Management, May 1999.
  33. Elliott, M., Boyes, S. and Smyth, K. (2019), The Marine risk assessment and management using the Bow-tie approach and its practical applications.Institute of Estuarine and Coastal Studies (IECS), University of Hull, Hull HU6 7RX, UK. Available at: http://coastal-futures.net/wp-content/uploads/2016/02/Elliott-The-Bow-Tie-Approach-risk-assessment-ilovepdf-compressed.pdf. Accessed on: 08.01.2019.
  34. Ertugrul, D. and Karakasoglu, N. (2007), Performance evaluation of Turkish cement firms with fuzzy analytic hierarchy process and TOPSIS methods, Expert Systems with Applications, Article in Press.
  35. Ferdous, R., Khan, F., Sadiq, R., Amyotte, P. and Veitch, B. (2009), "Handling data uncertainties in event tree analysis", Process Saf. Environ. Protection, 87, 283-292. https://doi.org/10.1016/j.psep.2009.07.003
  36. GAO, United States Government Accountability Office (2019), Port risk management: Further Refinements Needed to Assess Risks and Prioritize Protective Measures at Ports and Other Critical Infrastructure. Report to Congressional Committees, 2005. Available at: https://www.gao.gov/new.items/d0691.pdf. Accessed on: 09.01.2019.
  37. GEXCON (2019), World leading Company in the fields of safety and risk management, Available at: https://www.gexcon.com.Accessed on: 07.01.2019.
  38. Groeneweg, J. (1998), Controlling the controllable. Leiden: DSWO Press.
  39. Haghayeghi, M. (2003), "The coming of conflict to the Caspian Sea", Problems of Post-Communism, 50(3), 32-41. https://doi.org/10.1080/10758216.2003.11656037
  40. Henley, J. and Kumamoto, H. (1981), Reliability engineering and risk assessment, Prentice Hall, Englewood Clift, N J.
  41. Hoyland, A. and Rausand, M. (1994), Systems Reliability Theory Models and Statistical Methods, John Willey and Sons, New York.
  42. HSE, Health and Safety Executive (2019), Feasibility of storybuilder software tool for major hazards intelligence Prepared by the Health and Safety Laboratory for the Health and Safety Executive, 2010. Available at: www.hse.gov.uk. Accessed on 02.01.2019.
  43. Jackson, P.S., Hockenbury, R.W. and Yeater, M.L. (1981), "Uncertainty analysis of system reliability and availability assessment", Nucl. Eng. Des, 68, 5-29.
  44. Kahraman, C. (2001), Capital budgeting techniques using discounted fuzzy cash flows. (Eds., Ruan, D.; Kacprzyk, J. and Fedrizzi, M.), Soft Computing for Risk valuation and Management: Applications in Technology, Environment and Finance, Physica-Verlag, Heidelberg, 375-396.
  45. Kang, J. Sun, L. and Soares, C.G. (2018), "Fault tree analysis of floating offshore wind turbines", Renew. Energ., 1-13.
  46. Kaufmann, A. and Gupta, M.M. (1985), Introduction to Fuzzy Arithmetic: Theory and Applications, Van Nostrand Reinhold, New York.
  47. Keller, J.M. and Tahani, H. (1992), "Implementation on conjunctive and disjunctive fuzzy logic rules with neutral networks", Int. J. Approx.Reason., 6, 221-240. https://doi.org/10.1016/0888-613X(92)90018-U
  48. Klir, G.J. and Yuan, B. (1995), Fuzzy Sets and Fuzzy Logic: Theory and Application. Prentice Hall, New Jersey.
  49. Krishna, K., Wang, Y., Saraf, S.R., Rogers, W.J., Baldwin, J.T., Gupta, J.P. and Mannan, M.S. (2003), "Hydroxylamine production: Will a QRA help you decide?", Reliab. Eng. Syst. Safe., 81, 215-224. https://doi.org/10.1016/S0951-8320(03)00115-7
  50. Lees, F.P. (1996), Loss Prevention in the Process Industries. 2nd Ed., Boston.
  51. Lees, F.P. (2005), Loss Prevention in the Process Industries. Butterworths, London. Third edition. 9, 05-122.
  52. Li, Y. and Liao, X. (2007), "Decision support for risk analysis on dynamic alliance", Decision Support Syst., 42, 2043-2059. https://doi.org/10.1016/j.dss.2004.11.008
  53. Liang, G.S. and Wang, M.J. (1993), "Fuzzy fault-tree analysis using failure possibility", Microelectron. Reliab., 33, 583-597. https://doi.org/10.1016/0026-2714(93)90326-T
  54. Lind, N.C. (1983), "Models of human error in structural reliability", Struct. Saf., 1, 166-175.
  55. Marco, E.G.V.C. (2018), "The likelihood interpretation as the foundation of fuzzy set theory", Int. J. Approx. Reason., 90, 333-340. https://doi.org/10.1016/j.ijar.2017.08.006
  56. Mareike, L. and Athanasios, K. (2018), "A review of reliability-based methods for risk analysis and their application in the offshore wind industry", Renew. Sust. Energ. Rev., 91, 1065-1076. https://doi.org/10.1016/j.rser.2018.04.004
  57. Martins, M.R., Pestana, M.A., Souza, G.F.M. and Schleder, A.M. (2016), "Quantitative risk analysis of loading and offloading Liquefied Natural Gas (LNG) on a floating storage and regasification unit (FSRU)", J. Loss Prevent. Proc., 43, 629-653. https://doi.org/10.1016/j.jlp.2016.08.001
  58. Mather, A. (2009), FPSO Handbook. Witherby seamanship international Ltd. ISBN: 9781905331574.
  59. Miller, D.P. and Swain, A.D. (1987), Human error and human reliability in G Salvendy, Handbook of human factors, John Wiley and sons, Inc., New York.
  60. Mokhtari, K. (2011), Advanced Risk Management in Offshore Terminals and Marine Ports, PhD Thesis. Liverpool John Moores University.
  61. Mokhtari, K. (2012), RISK MANAGEMENT - A Guideline for QHSES and Risk Managers in Offshore and Marine Industries, LAMBERT Academic Publishing in Germany, April, 2012. ISBN: 9783848410286.
  62. Mokhtari, K. and Ren, J. (2014), "A risk management methodology for maritime logistics and supply chain applications", Ocean Syst. Eng., Publisher: Korean Society of Ocean Engineers,4(2), 137-150. https://doi.org/10.12989/ose.2014.4.2.137
  63. Murtaza, M.B. (2003), Fuzzy-AHP Application to Country Risk Assessment. American Business Review. Middle Tennessee State University, TN.
  64. Nagi, A., Ashraf, Z., Mohamed, D., Ismail, E., Ahmed, M. and Wenming, S. (2018), "Operational risk assessment of offshore transport barges", Int. J. Ocean Eng., 156, 333-346. https://doi.org/10.1016/j.oceaneng.2018.03.006
  65. Nagi, A., Mohamed, D., Ismail, E., Chai, Sh. and Abdusalam, A. (2018), "Risk assessment of LNG and FLNG vessels during maneuvering in open sea", J. Ocean Eng.Sci., 3, 56-66. https://doi.org/10.1016/j.joes.2017.12.002
  66. Nguyen, H.T. and Walker, E.A. (2000), A first course in fuzzy logic. Chapman and Hall/CRC, Florida.
  67. Oil and gas UK (2018), Available at: https://oilandgasuk.co.uk/wp-content/uploads/woocommerce_uploads/2015/10/HS029-2009-CURRENTAccident-Statistics.pdf Accessed on 20. March. 2018.
  68. Onisawa, T. (1988), "An approach to human reliability in man-machine systems using error possibility", Fuzzy Set. Syst., 27, 87-103. https://doi.org/10.1016/0165-0114(88)90140-6
  69. OWJE (2019), Available at: http://mapas.owje.com/maps/607_Northern-Caspian-Sea-Region-Map.html Accessed on 21. January. 2019.
  70. Ren, J., Jenkinson, I., Wang, J., Xu, D.L. and Yang, J.B. (2008), "A methodology to model causal relationships on offshore safety assessment focusing on human and organisational factors", J. Saf. Res., 39(1), 87-100. https://doi.org/10.1016/j.jsr.2007.09.009
  71. Ren, J., Wang, J., Jenkinson. I., Xu, D.L. and Yang, J.B. (2007), "A Bayesian network approach for offshore risk analysis through linguistic variables", China Ocean Eng., 21(3), 371-388.
  72. RFERL (2018), Available at: http://www.rferl.org/content/History_BP_Oil_Spill_Haunt_Caspian_Sea/2052194.html, Accessed on 27. Dec. 2018.
  73. RIVM (2019), National institute for public health and the environment of Netherland, RIVM Report 620801001, 2008. Available at: https://www.rivm.nl/en.Accessed on: 08.05.2019.
  74. Rosqvist, T. (2003), On use of experts judgment in the quantification of risk assessment, Dissertation for the degree of Doctor of Technology, Helsinki University of Technology, Espoo, Finland.
  75. Saaty, T.L. (2001), Decision Making with Dependence and Feedback: Analytic Network Process, RWS Publications, Pittsburgh.
  76. Sentz, K. and Ferson, S. (2002), Combination of evidence in Dempster-Shafer theory. SAND 2002-0835.
  77. Sharp, D. (2009), Upstream and offshore energy insurance, Witherbys insurance, ISBN: 9781856093514.
  78. Singer, D.A. (1990), "Fuzzy set approach to fault tree and reliability analysis", Fuzzy Set. Syst., 34, 145-155. https://doi.org/10.1016/0165-0114(90)90154-X
  79. Takagi, H. and Hayashi, I. (1991), "NN-driven fuzzy reasoning", Int. J. Approx. Reason., 5, 191-212. https://doi.org/10.1016/0888-613X(91)90008-A
  80. Tarila, Z. and Edward, G.O. (2017), "Senior managers and safety leadership role in offshore oil and gas construction projects", Procedia Eng., 196, 1011-1017. https://doi.org/10.1016/j.proeng.2017.08.043
  81. Thacker, B. and Huyse, L. (2003), Probabilistic assessment on the basis of interval data, In 44th AIAA/ASME/ASCE/AHS Structures, Structural Dynamics, and Materials Conference Published by the American Institute of Aeronautics and Astronautics, Inc, 2003.
  82. Trbojevic, V.M. and Carr, B.J. (2000), "Risk based methodology for safety improvements in ports", J. Hazard.Mater., 71, 467-480. https://doi.org/10.1016/S0304-3894(99)00094-1
  83. UNCTAD (2006), United Nation Conference on Trade and Development. Maritime security: Elements of an analytical framework for compliance measurement and risk assessment.
  84. Visser, J.P. (1998), Developments in HSE Management in oil and gas exploration and production, (Eds.,Hale A.R. and Baram, M.), Safety management, the challenge of change. Oxford: Pergamon.
  85. Wang, Y. (2004), Development of a computer-aided fault tree synthesis methodology for quantitative risk analysis in the chemical process industry, Ph.D. thesis.
  86. Wilcox, C.R. and Ayyub, M.B. (2003), "Uncertainty modelling of data and uncertainty propagation for risk studies", Proceedings of the IEEE 4th International Symposium on Uncertainty Modelling and Analysis.
  87. World Atlas (2019), Available at: http://www.worldatlas.com/aatlas/infopage/caspiansea.htm Accessed on 21.Jan. 2019.
  88. Wu, W.S., Yang, C.F., Chang, C.H., Chateau, P.A. and Chang, Y.C. (2015), "Risk assessment by integrating interpretive structural modelling and Bayesian network, case of offshore pipeline project", Reliab. Eng. Syst.Saf., 142, 515-524. https://doi.org/10.1016/j.ress.2015.06.013
  89. Yang, T. and Hung, C.C. (2007), "Multiple-attribute decision-making methods for plant layout design problem", Robot. Comput.-Integrated Manufact., 23, 126-137. https://doi.org/10.1016/j.rcim.2005.12.002
  90. Yuhua, D. and Dataob, Y. (2005), "Estimation of failure probability of oil and gas transmission pipelines by fuzzy fault tree analysis", J. Loss Prevent. Proc., 18, 83-88. https://doi.org/10.1016/j.jlp.2004.12.003
  91. Zadeh, L.A. (1965), "Fuzzy sets", Inform. Control., 8, 338-353. https://doi.org/10.1016/S0019-9958(65)90241-X
  92. Zhao, R. and Govind, R. (1991), "Defuzzification of fuzzy intervals", Fuzzy Set. Syst., 43, 45-55. https://doi.org/10.1016/0165-0114(91)90020-Q
  93. Zimmerman, H.J. (1996), Fuzzy sets theory and its applications, Kluwer academic publishers, Boston.
  94. Zuijderduijn, C. (1999), Risk management by Shell refinery/chemicals at Pernis, The Netherlands; Implementation of SEVESO-II based on build up experiences, using a Hazards and Effects Management Process.