Fig. 1. Flow chart of research
Fig. 2. Four main note elements in notational analysis
Table 1. Classification of sports data (Cho, 2018)
Table 2. Competency model of construction manager
Table 3. Structured competencies
Table 4. Composition of expert panel
Table 5. Competency structure based on behavior after Delphi 1st
Table 6. Verb words in guidelines for construction supervisors and construction supervisors (MOLIT)
Table 7. Technical knowledge and skill competency evaluation index
Table 8. Leadership competency evaluation index
Table 9. Personal trait competency evaluation index
참고문헌
- Abdel-Razek, R.H. (1997). "How construction managers would like their performance to be evaluated."Journal of Construction Engineering and Management, 123(3), pp. 208-213. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:3(208)
- Afshari, A.R. (2017). "Methods for Selection of Construction Project Manager: Case Study." Journal of Construction Engineering and Management , 143(12), 06017003. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001400
- Athey, T.R., and Orth, M.S. (1999). "Emerging competency methods for the future." Human Resource Management: Published in Cooperation with the School of Business Administration, The University of Michigan and in alliance with the Society of Human Resources Management, 38(3), pp. 215-225. https://doi.org/10.1002/(SICI)1099-050X(199923)38:3<215::AID-HRM4>3.0.CO;2-W
- CSU (California State University) Fresno. (2012). "Sports marketing option." http://www.craig.csufresno.edu/departments/mrkt/Sports-mktg-snapshot.asp. (Jul. 11, 2012).
- Cho. E.H. (2018). "Science of Record and Measurement of Sports Fields: Utilization and Prospect of Sports and Big Data." Sports Science, 142, pp. 20-29.
- Dainty, A.R., Cheng, M.I., and Moore, D.R. (2005). "Competency-based model for predicting construction project managers' performance." Journal of Management in Engineering, 21(1), pp. 2-9. https://doi.org/10.1061/(ASCE)0742-597X(2005)21:1(2)
- El-Sabaa, S. (2001). "The skills and career path of an effective project manager." International journal of project management, 19(1), pp. 1-7. https://doi.org/10.1016/S0263-7863(99)00034-4
- Evangelista, L. (2009). "Competence, Competencies and Career Guidance." In IAEVG International Conference 2019 .
- Frank, T. (2002). "The superior project manager." Marcel Dekker, New York.
- Gang, J.S., and Kim, H.S. (2010). "Evaluation of Project Managers Leadership in Construction Projects." Korean Journal of Construction Engineering and Management , KICEM, 11(1), pp. 151-159. https://doi.org/10.6106/KJCEM.2010.11.1.151
- Hadad, Y., Keren, B., and Laslo, Z. (2013). "A decision-making support system module for project manager selection according to past performance." International Journal of Project Management , 31(4), pp. 532-541. https://doi.org/10.1016/j.ijproman.2012.10.004
- Hallowell, M.R., and Gambatese, J.A. (2009). "Qualitative research: Application of the Delphi method to CEM research." Journal of construction engineering and management , 136(1), pp. 99-107. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000137
- Han, P., Baek, E., and Jang, S. (2010). "The developmen t of appraisal items for measuring the playing ability of soccer player." Korean Journal of Sports Science, 19(2), pp. 1397-1412.
- Hong, S. (2010). "Development of Determinants of Competitive Power for Evaluating Position of Soccer Players." Korean Journal of Sport Science, 21 (2), pp. 1172-1182. https://doi.org/10.24985/kjss.2010.21.2.1172
- Hong, S., Kim, J., and Choi, H. (2009). "Understanding Context Factors for Evaluation of Soccer Player Performance." Korean Journal of Sport Science , 20(3), pp. 612-620. https://doi.org/10.24985/kjss.2009.20.3.612
- Hu, Y. (2017). "Lotte World Tower, a Great Landmark of Seoul." Korean Society of Civil Engineers, pp. 98-99.
- Hughes, M.D., and Bartlett, R.M. (2002). "The use of performance indicators in performance analysis." Journal of sports sciences, 20(10), pp. 739-754. https://doi.org/10.1080/026404102320675602
- Hughes, M., and Franks, I.M. (Eds.). (2004). "Notational analysis of sport: Systems for better coaching and performance in sport." Psychology Press.
- Hwang, B.G., and Ng, W.J. (2013). "Project management knowledge and skills for green construction: Overcoming challenges." International Journal of Project Management, 31(2), pp. 272-284. https://doi.org/10.1016/j.ijproman.2012.05.004
- Jaselskis, E.J., and Ashley, D.B. (1991). "Optimal allocation of project management resources for achieving success." Journal of Construction Engineering and Management, 117(2), pp. 321-340. https://doi.org/10.1061/(ASCE)0733-9364(1991)117:2(321)
- Jeong, J., and Jun, O.J. (2012). "The Development of Evaluation Criteria for the Meister High Schools Based on CIPP Evaluation Model." The Journal of Vocational Education Research, 31(4), pp. 91-110.
- Jung, S., and Yu, J. (2017). "Analysis of Factors Affecting Job Competency of Quality Management for a Construction Manager." Korean Journal of Construction Engineering and Management, KICEM, 18(1), pp. 65-73. https://doi.org/10.6106/KJCEM.2017.18.1.065
- Keren, B., Hadad, Y., and Laslo, Z. (2014). "Combining AHP and DEA methods for selecting a project manager." Management: Journal of Sustainable Business and Management Solutions in Emerging Economies, 19(71), pp. 17-28. https://doi.org/10.7595/management.fon.2014.0016
- Kim, D., Kim, H., and Jang, H. (2018). "An Analysis of the Casual Relations on Construction Project Manager's level Competency." Journal of The Architectural Institute of Korea Structure and Construction. 34(3), pp. 77-86. https://doi.org/10.5659/JAIK_SC.2018.34.3.77
- Kim, D.Y. (2014). "Developing Competency Model and Analyzing Competency Needs for Construction Manager in D Co., Ltd." The Journal of Vocational Education Research, KRIVET 33(3), pp. 37-56.
- Kim, G.R. (2010). "An Investigation on Performance Indicators to Evaluate the Individual Performances Within Tactical Conditions in Football." Unpublished Doctoral Thesis, Myongji University Graduate School.
- Kim, H., and Kwon, D. (2003). "Project Managers'Core Skills in Construction Projects." Journal of The Architectural Institute of Korea Structure and Construction, 19(8), pp. 163-170.
- Klemp Jr, G.O. (1980). "The Assessment of Occupational Competence." Final Report: I. Introduction and Overview.
- Lawshe, C.H. (1975). "A quantitative approach to content validity 1." Personnel psychology, 28(4), pp. 563-575. https://doi.org/10.1111/j.1744-6570.1975.tb01393.x
- Lee, H., Yu, J., and Lee, S. (2011). "Personal Competency Model of Construction Project Managers for Project Success." Journal of the Architectural Institute of Korea Structure and Construction 27(8), 2011.8, pp. 139-146.
- Lee, J. (2001). "Delphi Method." Kyoyookbook, 7.
- McClelland, D.C. (1973). "Testing for competence rather than for intelligence." American psychologist, 28(1), p. 1. https://doi.org/10.1037/h0034092
- Ministry of Land, Infrastructure and Transport Degree (2013). "Guidelines for construction supervisors and construction supervisors." 8.
- Mirabile, R.J. (1997). "Everything you wanted to know about competency modeling." Training and Development, 51(8), pp. 73-78.
- Park, M., Jang, Y., Lee, H., and Yoon, Y. (2010). "Integrated Knowledge Management System based on Construction Portal." Korean Journal of Construction Engineering and Management, KICEM, 11(4).
- Parry, S.B. (1996). "The quest for competencies." Training, 33(7), p. 48.
- Rashidi, A., Jazebi, F., and Brilakis, I. (2010). "Neurofuzzy genetic system for selection of construction project managers." Journal of Construction Engineering and Management, 137(1), pp. 17-29. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000200
- Shin, M.S. (2009). "Comparisons of team performance analysis between EURO 2008 semi-finalists and South Korean teams in soccer." The Korean Journal of Physical Education, 48(2), pp. 475-482.
- Silva, R.M. (2016). Sports analytics (Doctoral dissertation, Science: Statistics and Actuarial Science).
- Spencer, L. and Spencer, S. (1993). "Competence at work: Models for superior performance." United States: John Wiley and Sons.