Fig. 1. General availability calculation.
Fig. 2. Suggestions for system availability calculations.
Fig. 3. Overview of shuttle tain routes.
Fig. 4. Normal operation mode of shuttle train.
Fig. 5. Proposal of MTBF and availability by 3rd shuttle train.
Fig. 6. 120-Days cumulative availability on operational routes.
Table 1. Application examples of availability by route
Table 2. Application examples of availability by route
Table 3. Quantitative availability requirements
Table 4. Availability target value (construction company)
Table 5. Comparison of availability against train failures(1)
Table 6. Comparison of availability against train failures(2)
참고문헌
- IEC 62267-2:2011, Railway Applications Automated Urban Guided Transport (AUGT) Safety Requirements - Part 2 : Hazard Analysis at Top System Level, International Electro Technical Commission
- KS C IEC 62278:2002, Railway Applications Specification and Demonstration of Reliability, Availability, Maintainability and Safety (RAMS), International Electro Technical Commission
- J. G. Hwang, H. J. Jo, C. H. Han, W. S.k, Cho and J. Ahn, "Development and Application of Safety Activity Process for Railway Signaling Systems", J. Korean Soc. Saf., Vol. 25, No. 1, 2010.
- I. S. Chung, J. W. Kim and K. W. Lee, "The Study on the Demonstration Test of Quantitative Reliability Requirements for Rolling Stocks", Journal of the Korean Society for Railway, Vol. 11, No. 3 pp. 233-239, 2008.
- M. C. Lee, "A Study on Reliability & Availability of Train Detection using Virtual Track Circuit", Department of Railroad Electrical & Signalling Engineering, Graduate School of Railroad, Seoul National University of Science and Technology, 2012.
- M. G. Park and S. H. Han, "A Study on the Risk based RAMS Assessment for Railway Rolling Stock Systems", The Transactions of the Korean Institute of Electrical Engineers, Vol. 64P, No. 4, pp. 220-230, 2015.
- Y. H. Cho, H. W. Lee, J. W. Kim and J. M. Yang, "A Study on Reliability Indicator Analysis and Management Method of Railway Vehicle Component", Journal of Korean Society for Urban Railway, Vol. 6, No. 1, pp. 27- 36, 2018. https://doi.org/10.24284/JKOSUR.2018.03.6.1.27
- H. S. Yun, K. S. Lee, S. K. Ryou and D. I. Yang, "A Study on the RAMS Analysis of Urban Maglev Train Control System", Journal of Korean Society for Railway Vol. 14, No. 6, pp. 515-525, 2011. https://doi.org/10.7782/JKSR.2011.14.6.515
- I. S. Chung, K. W. Lee and J. W. Kim, "A Study on RAMS Parameters in the Procurement Requirement for Rolling Stock", Journal of Korean Society for Railway, Vol. 11, No. 4, pp. 371-377, 2008.
- C. S. Kim and H. S. Lee, "Reliability Analysis of Electric Door System for EMU", J. Korean Soc. Saf., Vol. 28, No. 8, pp. 52-56, 2013. https://doi.org/10.14346/JKOSOS.2013.28.1.052
- K. J. Kim and K. O. Lee, "A Study on the Improcement for EMU Maintenance System of Urbal Transit", J Korean Soc. Saf., Vol. 25, No. 1, pp. 87-92, 2010.